CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY WASTE WATER TREATMENT SYSTEM & PERCOLATION AREA AND ASSOCIATED SITE WORKSDecision record indexed
(1) DEMOLITION OF A MICA AFFECTED HABITABLE DWELLING (2) PROVISION OF FIRST FLOOR LIVING ACCOMMODATION AND STORAGE WITHIN AN EXISTING DETACHED SHED INCLUDING CONNECTION TO THE EXISTING WASTEWATER TREATMENT SYSTEM (3) RECONSTRUCTION OF THE ABOVE DWELLING WITH CONNECTION TO EXISTING WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
ERECTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
DOMESTIC GARAGE AND PERMISSION FOR (1) DEMOLITION OF DEFECTIVE CONCRETE BLOCK AFFECTED DWELLING, (2) CONSTRUCTION OF A REPLACEMENT DWELLING WITH CONNECTION TO EXISTING SERVICES AND (3) ERECTION OF A MODULAR GARDEN ROOM/HOME OFFICE TO BE USED AS TEMPORARY ACCOMMODATION DURING THE REBUILD OF THE DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
REMOVAL AND REPLACEMENT OF EXISTING FOOTBRIDGE ON THE OWENEA RIVER. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATIONDecision record indexed
ERECTION OF AN EXTENSION TO THE SIDE OF THE EXISTING DWELLING HOUSE, REMOVAL OF HIP ROOF FROM EXISTING DWELLING AND CONSTRUCTION OF GABLE END ROOF, INTERNAL ALTERATIONS TO EXISTING DWELLING HOUSE AND ASSOCIATED SITE WORKSDecision record indexed
ATTIC DEVELOPMENT AND ALTERATIONS TO THE FACADES TO THE EXISTING DWELLING HOUSE GRANTED UNDER REF. 95/477 AND PERMISSION FOR UPGRADING OF EXISTING TREATMENT SYSTEM & PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DECOMMISSIONING OF CONNECTION TO EXISTING SEPTIC TANK AND INSTALLATION OF NEW SUITABLE REPLACEMENT EFFLUENT TREATMENT SYSTEM WITH ASSOCIATED FACILITIES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, INSTALLATION OF SEWERAGE TREATMENT SYSTEM AND PERCOLATION AREA AND ASSOCIATED SITE WORKSGrounds not yet categorised
CONSTRUCTION OF A NEW DWELLING HOUSE WITH PROPRIETARY SEWERAGE TREATMENT SYSTEM AND PERCOLATION AREA AND ASSOCIATED SITE WORKSGrounds not yet categorised
(1) DEMOLITION OF EXISTING DWELLING, SHED AND OUTHOUSES (2) CONSTRUCTION OF A REPLACEMENT DWELLING, SHED AND GARAGE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
RENOVATION WORKS TO EXISTING DWELLING HOUSE, WORKS WILL INCLUDE ALTERATIONS TO ALL FACADES, REMOVAL OF EXISTING DORMER WINDOW AND BAY WINDOW AND TO RE-ROOF PART OF THE EXISTING ROOF AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) DEMOLITION OF EXISTING DISUSED COMMERCIAL KITCHEN AND SHED, (2) CONSTRUCTION OF EXTENSION AND (3) MINOR MODIFICATIONS TO REAR ELEVATIONDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED AS PART OF THE APPLICATIONDecision record indexed
DECOMMISSIONING OF EXISTING SEWAGE TREATMENT SYSTEM SERVING DWELLING HOUSE AND INSTALLATION OF A NEW SEWAGE TREATMENT SYSTEM, AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
REFURBISHMENT, CONSTRUCTION OF EXTENSION AND ALTERATIONS TO EXISTING DWELLING WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
(1) CHANGE OF USE FROM EXISTING OFFICE BUILDING TO A DWELLING HOUSE AND (2) EXTENSION AND RENOVATION TO BUILDING WITH ALTERATIONS TO FACADES, CONNECTION TO ALL EXISTING SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
EXTENSION AND RENOVATIONS TO EXISTING DWELLING CONSISTING OF (1) INCREASING THE EXISTING RIDGELINE TO PROVIDE FIRST FLOOR ACCOMMODATION, (2) ALTERATIONS TO ALL FACADES, (3) UPGRADING OF EXISTING SEPTIC TANK SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
RELOCATION OF A SECTION OF THE EXISTING 38KV LINE KNOWN AS THE DUNGLOE - GLENTIES 38KV LINE. THE ALTERATION CONSISTS OF REPLACING TWO EXISTING STRUCTURES AND INSTALLING THREE NEW STRUCTURES. THE AFFECTED LINE SECTION IS 260M. THE RELOCATION IS REQUIRED DUE TO THE CONSTRUCTION OF FLOOD-LIGHTING IN CLOSE PROXIMITY TO THE LINE AT GLENTIES GAA PITCHDecision record indexed
(1) NEW VEHICULAR ACCESS AT LOCAL ROAD L-2643, (2) ALTERATIONS AND CONSTRUCTION OF EXTENSION TO EXISTING COTTAGE AND (3) INSTALLATION OF SECONDARY WASTEWATER TREATMENT SYSTEM AND SOIL POLISHING FILTERDecision record indexed
ERECTION OF 8 NO. 21M HIGH LIGHTING COLUMNS WITH A MAXIMUM LIGHTING LEVELS OF 500 LUX PER COLUMN LOCATED TO THE PERIMETER OF THE EXISTING GAA FOOTBALL PITCH AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CHANGE TO THE EXTENSION TO THE REAR OF THE EXISTING HOUSE, PREVIOUSLY GRANTED UNDER PLANNING REF. 23/51197 CONSISTING OF A FIRST FLOOR OVER THE PERMITTED SINGLE STOREY EXTENSION TO FORM A 2 STOREY EXTENSION TO THE REAR OF THE HOUSE AND ASSOCIATED SITE WORKSGrounds not yet categorised
CONSTRUCTION OF A PART TWO STOREY, PART SINGLE STOREY EXTENSION TO THE REAR OF EXISTING HOUSE, ELEVATIONAL CHANGES INCLUDING ADDITIONAL WINDOWS AND ASSOCIATED SITE WORKSDecision record indexed
DEMOLITION OF EXISTING REAR EXTENSION AND CONSTRUCTION OF A NEW EXTENSION TO THE EXISTING DWELLING HOUSE WITH CONNECTION TO ALL EXISTING SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
ERECTION OF A DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA & ALL ASSOCIATED SITE WORKSDecision record indexed
REFURBISHMENT AND CONSTRUCTION OF EXTENSION TO EXISTING COTTAGE, INCLUDING INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM, AND ALL ASSOCIATED SITE WORKSDecision record indexed
ST CONNELL'S MUSEUM, MILL ROAD, GLENTIES LETTERKENNY PO
(1) REPLACEMENT AND RELOCATION OF SIGNAGE AND (2) DEMOLITION OF EXISTING ENTRANCE STEPS, RAMP AND BALUSTRADE AND RENEWAL TO AN IMPROVED STANDARD TO MEET THE NEED FOR UNIVERSAL PUBLIC ACCESS TO THE ENTRANCE OF THE MUSEUM BUILDINGDecision record indexed
(1) CONSTRUCTION OF EXTENSION TO EXISTING DWELLING CONSISTING OF AN ACCESSIBLE BEDROOM AND EN-SUITE WITH CONNECTION TO EXISTING ON-SITE SERVICES AND ALL ASSOCIATED SITE WORKS, (2) DEMOLITION OF EXISTING STORAGE SHED TO SIDE ELEVATION OF HOUSE AND (3) PARTIAL DEMOLITION AND REBUILD OF ADDITIONAL SHED TO ACCOMMODATE NEW EXTENSIONDecision record indexed
(1) DEMOLITION OF EXTENSIONS TO THE FRONT, REAR AND SIDE OF EXISTING DWELLING HOUSE, (2) CONSTRUCTION OF (A) NEW EXTENSION WORKS AND ALL ELEVATIONAL AMENDMENTS AND (B) A DETACHED DOMESTIC GARAGE AND (3) DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM WITH CONNECTION INTO THE PUBLIC MAIN SEWERAGE NETWORK AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) CHANGE OF USE OF REDUNDANT WAREHOUSE TO MULTI-USE CULTURAL EXHIBITION SPACE ON GROUND AND FIRST FLOORS, INCLUDING A GROUND FLOOR SINGLE STOREY REAR EXTENSION ACCOMMODATING STORE & TOILET (2) CHANGE OF USE FROM REDUNDANT WAREHOUSE TO AN ARTIST'S RESIDENCE ON THE SECOND FLOORDecision record indexed