    2560345Granted

    Clonin, Rhode, Co. Offaly

    A 10-year planning permission for works to the existing Derryiron 110 kilovolt (kV) electricity substation comprising (i) an increase to the footprint of the substation compound by 190 square metres (m2) arising from the realignment of the existing palisade fence; (ii) the installation of electrical equipment including circuit breakers, cable sealing ends and voltage transformers; (iii) the installation of approximately 20m of 110kV underground electricity line; and, (iv) all associated ancillary site development works. This planning application is accompanied by an Appropriate Assessment Screening ReportDecision record indexed
    Decision22 September 2025View record
  2. © OpenStreetMap
    2460289Granted

    In the townlands of Clonin, & Coolcor, Rhode Co. Offaly

    Development of a 22-hectare site. The proposed development comprises (i) two (2no.) air dome structures for the storage of carbon dioxide at atmospheric pressure (each 500m x 120m x 34m high) and associated cooling, compression, pumping and power generation equipment and machinery (ii) a single-storey storage and control building, (iii) internal site access roads and connection to existing and consented roads at Rhode Green Energy Park, (iv) underground electrical cable connection to Derryiron 110kV substation, (v) all civil engineering works, surface water and foul water drainage, landscaping, lighting and security fencingDecision record indexed
    Decision08 August 2025View record
  3. © OpenStreetMap
    22664Granted

    DERRYIRON 110KV SUBSTATION, CLONIN RHODE, CO. OFFALY

    EIRGRID PLC (WITH THE CONSENT AND APPROVAL OF THE ELECTRICITY SUPPLY BOARD (ESB)), INTENDS TO APPLY FOR PERMISSION FOR DEVELOPMENT AT SITE OF APPROXIMATELY 1 HECTARE AT DERRYIRON 110KV SUBSTATION, CLONIN, RHODE, CO. OFFALY. DEVELOPMENT CONSISTING OF WORKS TO UPGRADE THE EXISTING SUBSTATION INCLUDING: THE INSTALLATION OF ADDITIONAL AIR INSULATED SWITCHGEAR ELECTRICAL APPARATUS (APPROXIMATELY 7M IN HEIGHT) TO FACILITATE THE PROVISION OF A 110KV BUSBAR; INSTALLATION OF 3 NO. ADDITIONAL BAYS (EACH CONSISTING OF BUSBAR DISCONNECTS, SECTIONALISERS, CIRCUIT BREAKERS, CURRENT TRANSFORMERS, VOLTAGE TRANSFORMERS, LINE TRAPS, COUPLING CAPACITORS AND OTHER ELECTRICAL APPARATUS); AN EXTENSION TO THE NORTH OF THE EXISTING CONTROL BUILDING (APPROXIMATELY 73 SQUARE METERS) TO PROVIDE ACCOMMODATION FOR CABINETS, OTHER ELECTRICAL APPARATUS AND A BATTERY ROOM; INSTALLATION OF 2 NO. CIRCUIT BYPASS ARRANGEMENTS (APPROXIMATELY 14M AND APPROXIMATELY 4M IN HEIGHT, RESPECTIVELY) TO FACILITATE NORMAL OPERATION OF THE SUBSTATION DURING CONSTRUCTION; AND AN EXTENSION TO THE HARDSTAND COMPOUND (APPROXIMATELY 0.03 HECTARES). THE DEVELOPMENT WILL ALSO CONSIST OF: ALL ANCILLARY AND ASSOCIATED ELECTRICAL WORKS TO FACILITATE THE PROPOSED DEVELOPMENT; AND ALL OTHER ASSOCIATED SITE EXCAVATION, INFRASTRUCTURAL AND SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND, INCLUDING SITE PREPARATION WORKS, SITE CLEARANCE AND LEVELLING; HARDSTANDING, INTERNAL ACCESS TRACKS AND TEMPORARY CONSTRUCTION COMPOUND; EARTHGRID, SURFACE WATER DRAINAGE NETWORK; PALISADE FENCING (APPROXIMATELY 2.7M HIGH) AND GATES; AND LANDSCAPING.Decision record indexed
    Decision23 February 2023View record