to
to

Planning records

Showing 1-10 of 10 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    2560658Refused

    KILLEEN MOUNTLUCAS, DAINGEAN, CO. OFFALY

    The construction of a new dormer-style dwelling, a garage to the rear of the site for domestic use only, a foul water treatment system and percolation area, an upgrade of the existing entrance to allow for a setback from the road, new piers and gates and all other associated site development workGrounds not yet categorised
    Decision20 February 2026View record
  2. © OpenStreetMap
    2560115Granted

    Bord Na Móna lands within the townlands of, Knockballyboy Clonad Rathfeston Gorteenkeel Island Clonarrow or Riverlyons Drumcaw or Mountlucas Esker Beg Killeen Ballyhugh Mullalough or Cavemount, Coole Toberdaly Newtown Ballycon Esker More Colgagh an

    The development of a recreational shared cycle and walkway located on Bord Na Móna lands. The development proposes the following: a) The delivery of a shared cycle and walkway on Bord na Móna lands. This will include the repurposing of 18,958 meters of existing former rail bed and 827 meters along pre-existing machine access routes. b) The proposed shared cycle and walkway will connect into the existing Grand Canal Way within the townlands of Coole and Knockballyboy; the Public Amenity Facilities at Mountlucas Wind Farm within the townlands of Clonarrow or Riverlyons and Drumcaw or Mountlucas; and the Cloncreen Wind Farm Amenity Track within the townland of Clongarret. c) The construction of car and / or bicycle parking facilities at a number of gateway locations along the proposed route and the provision of EV Charging spaces at the Gateway locations. This will include; i. 3 Type 3 Gateways, ii. 2 Type 4 Gateways, iii. 7 Minor Rest Points d) Upgrade works to 2 no. local access road crossings, and 6 no. agricultural crossings. e) Upgrade works to the Croghan Tippler Bridge (BNM Ref 37-109) and the Ballycon Rail Bridge (BNM Ref 37-112). f) The construction of a new pedestrian and cycle bridge extending to 30.5 meters spanning the Grand Canal within the Coole townland, located adjacent to the existing Grand Canal lift bridge (BNM Ref 37-05). g) The erection of wayfinding and interpretative signage at Gateway locations along the route. h) The implementation of Sustainable Drainage Systems (SuDS) nature-based drainage proposals at the Gateway locations to cater for surface water drainage at car park locations. i) Fencing and screening will be erected where required for biodiversity reasons which will include 7,636 meters of ecological screening. j) All other ancillary and associated site work. This Planning Application is accompanied by a Natura Impact Statement (NIS)Decision record indexed
    Decision29 January 2026View record
  3. © OpenStreetMap
    2360183Granted

    National Construction Training Centre, Drumcraw or Mountlucas / Derrycricket, Daingean Co. Offaly

    (A) The construction of Phase 1 of the Modern Methods of Construction (MMC) Demonstration Park consisting of 5no. demonstration structures which shall be used for training and research purposes. They shall comprise of: 1no. two storey Type A Structure; 1no. two/three/four storey Type B/C/D Structure; 1no. one/two storey Type E/F Structure; 1no. two storey Type G Structure; and 1no. two storey Type H Structure. (B) The upgrade of the existing foul water treatment plant. (C) The provision of landscaping, storm water storage swales, groundworks, service connections, roads/pathways/set down, public lighting, and all associated site development works to complete the development. A Natura Impact Statement (N.I.S.)will be submitted to the planning authority with this application.Decision record indexed
    Decision18 April 2024View record
  4. © OpenStreetMap
    22379Granted

    C.5.14HA SITE WITHIN THE MOUNT LUCAS WIND FARM, IN THE TOWNLAND OF DRUMCAW OR, MOUNTLUCAS CO. OFFALY

    A 2MW PILOT SCALE HYDROGEN ELECTROLYSIS PLANT WHICH COMPRISES; AN ELECTROLYSER CONTAINED WITHIN A STANDARD ISO CONTAINER (C. 12.2M IN LENGTH, C. 2.4M IN WIDTH AND C. 3.3M IN HEIGHT), 3 NO. HIGH PRESSURE HYDROGEN STORAGE UNITS, 1 NO HYDROGEN COMPRESSION SYSTEM, 1 NO GENERATOR, 2 NO SUBSTATION/TRANSFORMER STRUCTURES AND A MEDIUM VOLTAGE UNDERGROUND CABLE CONNECTION TO THE NEAREST WIND TURBINE C. 600M TO THE WEST. THE HYDROGEN ELECTROLYSIS PLANT WILL BE SUPPORTED BY THE FOLLOWING INFRASTRUCTURE; HYDROGEN ANALYSER CONTAINER, FIREWALL (MAXIMUM HEIGHT 3.6M), UNDERGROUND FIBRE OPTIC CABLING, 2 NO. 10 CUBIC METRE BUFFER TANKS, GAS CONTROL CABINET, POWER SUPPLY UNIT, 23 CUBIC METRE PRECAST UNDERGROUND WATER STORAGE TANK, WATER FILTRATION SYSTEM, 2 NO BOREHOLE WELLS, AND 4 NO. HGV TRAILER BAYS. ANCILLARY INFRASTRUCTURE WILL INCLUDE 1 NO WELFARE PORTACABIN (C. 24SQM) AND 4 NO. CAR SPACES, PALISADE SECURITY FENCING, VEHICULAR AND PEDESTRIAN ACCESS, A REPLACEMENT FOOTPATH BETWEEN THE SITE ENTRANCE AND THE MAIN ENTRANCE TO THE WIND FARM, SITE DRAINAGE WORKS INCLUDING PETROL INTERCEPTOR AND ALL ASSOCIATED INFRASTRUCTURE AND SITE DEVELOPMENT WORKS. THE APPLICATION IS ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS)Decision record indexed
    Decision28 March 2023View record
  5. © OpenStreetMap
    22186Granted

    MOUNTLUCAS, DAINGEAN, CO. OFFALY

    (A) 1 NO. NEW BUNGALOW TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM (D) VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
    Decision24 August 2022View record
  6. © OpenStreetMap
    21746Granted

    BALLYNAKILL, CO. OFFALY

    AMENDMENTS TO THE PERMITTED EXTENSION TO THE MOUNTLUCAS SUBSTATION WHICH INCLUDES AN EXTENSION TO THE EXISTING COMPOUND TO ACCOMMODATE A BUSBAR EXTENSION AND DEDICATED BAY (OFFALY COUNTY COUNCIL REF. 20/218). THE PROPOSED AMENDMENTS INCLUDE A 25.5 SQ.M CONTROL ROOM EXTENSION TO THE EXISTING SUBSTATION CONTROL BUILDING AND ALTERATIONS TO THE LAYOUT OF THE PERMITTED BUSBAR EXTENSION AND DEDICATED BAY. PERMISSION IS ALSO SOUGHT FOR A TEMPORARY CONSTRUCTION COMPOUND ON SITE. PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND SUBMITTED IN RESPECT OF THE PROPOSED DEVELOPMENTDecision record indexed
    Decision02 February 2022View record
  7. © OpenStreetMap
    21237Granted

    DRUMCAW OR MOUNTLUCAS, DERRYCRICKET BRACKAGH, TULLAMORE CO. OFFALY

    EXISTING FREESTANDING STORAGE CONTAINERS. PERMISSION FOR (1) CONTINUANCE OF EXISTING AQUACULTURE FARM INCORPORATING FOUR FISH PONDS, AQUAPONICS POND, ALL CONNECTED USING INTERLINKING OPEN CHANNELS AND ASSOCIATED SITE DEVELOPMENT WORKS, AS PERMITTED UNDER PREVIOUS PLANNING REFERENCE 16/66. (2) CONSTRUCTION OF ELEVATED ANTI PREDATOR NETTING AND SUPPORT STRUCTURES INCLUDING ALL ASSOCIATED SITE AND INCIDENTAL WORKSDecision record indexed
    Decision31 August 2021View record
  8. © OpenStreetMap
    20331Granted

    ESKER BEG AND DRUMCAW, OR MOUNTLUCAS, CO. OFFALY

    CROGHAN BIOMASS FACILITY, LOCATED WITHIN THE TOWNLANDS OF ESKER BEG AND DRUMCAW OR MOUNTLUCAS, CO. OFFALY AT GRID REFERENCE 651434, 727855 FOR THE STORAGE AND SEASONING OF BIOMASS LOGS FOLLOWED BY CHIPPING OF THE SEASONED LOGS ON A SITE AREA OF 5.6 HA AND FOR THE FOLLOWING WORKS: (1) EXISTING STRUCTURES COMPRISING (A) WEIGHBRIDGE (120 SQ.M) AND (B) WEIGHBRIDGE CONTROL STATION (40 SQ.M); (2) AN ENTRANCE OFF THE R402 WITH A WALL, RAILINGS AND GATES; (3) PAVED AREAS OF THE SITE INCLUDING INTERNAL ROADWAYS (380 M), YARD AREA (1.1 HA) AND HARDSTANDING AREA (1,865 SQ.M); (4) UNPAVED ACCESS TRACKS (1.4KM LONG); (5) A LINEAR LOG STORAGE AREA 1.8KM LONG, C.4M WIDE AND UP TO 4.1M HIGH, EQUATING TO 9,400 TONNES OF WET LOGS. PLANNING PERMSSION IS SOUGHT FOR STORAGE OF BIOMASS MATERIAL (10,000 TONNES PER ANNUM) WITHIN THE FACILITY SUBJECT TO RETENTION AND FOR ALTERATIONS TO IMPROVE THE EXISTING ACCESS OFF THE R402 TO INCLUDE ROAD MARKINGS. THE DEVELOPMENT WILL INCLUDE ALL ANCILLARY WORKS.Decision record indexed
    Decision22 January 2021View record
  9. © OpenStreetMap
    2099Granted

    MOUNTLUCAS, DAINGEAN, CO. OFFALY

    (I) SINGLE STOREY EXTENSION TO THE REAR OF THE EXISTING DWELLING HOUSE COMPRISING OF 13.5 SQ/M (II) SINGLE STOREY EXTENSION TO THE SIDE OF THE EXISTING DWELLING HOUSE COMPRISING OF 30.5 SQ/M (III) EXTERNAL SHED COMPRISING OF 70 SQ/M AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
    Decision24 September 2020View record
  10. © OpenStreetMap
    20218Granted

    RATHFESTON BALLYKEAN BALLYDUFF RAHEENBEG, KILCOONEY BALLINTOGHER GORTEENKEEL AND BALLYNAKILL, CO. OFFALY

    LAYING AN UNDERGROUND ELECTRICITY CABLE OF UP TO 110KV AND ASSOCIATED DUCTING AND ANCILLARY DEVELOPMENT PRIMARILY WITHIN THE PUBLIC ROAD TO FACILITATE THE CONNECTION OF THE PERMITTED MOANVANE WIND FARM WITHIN THE TOWNLANDS OF RATHFESTON, BALLYKEAN, BALLYDUFF, RAHEENBEG, KILCOONEY, BALLINTOGHER, GORTEENKEEL AND BALLYNAKILL (OFFALY COUNTY COUNCIL REF. 17/335; AN BORD PLEANÁLA REF. PL19.301619) TO THE NATIONAL ELECTRICITY GRID VIA THE EXISTING MOUNTLUCAS 110KV SUBSTATION IN THE TOWNLAND OF BALLYNAKILL, CO. OFFALY. PERMISSION IS ALSO SOUGHT TO INSTALL A SUBSTATION WITHIN THE TOWNLAND OF KILCOONEY TO REPLACE THE SUBSTATION PERMITTED AS PART OF THE MOANVANE WIND FARM. PERMISSION IS ALSO SOUGHT TO EXTEND THE EXISTING MOUNTLUCAS SUBSTATION LOCATED WITHIN THE TOWNLAND OF BALLYNAKILL, CO. OFFALY TO INCLUDE AN EXTENSION TO THE EXISTING COMPOUND TO ACCOMMODATE A BUSBAR EXTENSION AND DEDICATED BAY. PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAVE BEEN PREPARED AND SUBMITTED IN RESPECT OF THE PROPOSED DEVELOPMENTDecision record indexed
    Decision13 August 2020View record
Showing 1-10 of 10
PreviousPage 1 of 1Next