to
to

Planning records

Showing 1-1 of 1 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    2050Granted

    Elsinore House, Rosses Point, Co Sligo

    Development consisting of the conservation of Elsinore House, a Protected Structure (RPS 351), and associated Coach House as a phased development to include the following: (1) Phase 1 - The reconstruction, restoration and change of use of the coach-house to a single dwelling unit. Works to include raising of the roof level, construction of one-and-a-half storey rear extension, single storey side extension with roof terrace over and the inclusion of photovoltaic panels. Upgrade of the existing entrance and driveway. (2) Phase 2 - The reconstruction and restoration of the main house to provide a single family dwelling. Works to include restoration of roof and collapsed structural walls, reinstatement of trelliswork portico to front, modified replacement of two storey extension to rear with walkway to first floor balcony over side yard, reconstruction of former vinery at side gable and restoration of castellated follies. (3) Installation of pumping station to connect both dwellings to public sewer. (4) Construction of shed to enclose existing pump-house at north edge of site. (5) And all associated works which includes the provision of a pedestrian access point and the extensive planting of trees and shrubs.Decision record indexed
    Decision08 April 2021View record
Showing 1-1 of 1
PreviousPage 1 of 1Next