Construction of a silage slab, machinery shed, manure pit, slatted shed and underground slurry storage tank along with all associated site worksDecision record indexed
To construct (i) Milking parlour building incorporating dairy, plant, storage, milk tank, meal Bin, rain water storage tank, holding yard with crush/ drafting yard, underground effluent tank with flow channel (ii) Cubicle shed with slatted tanks (iii) Walled Silage pit and all associated site worksDecision record indexed
To retain and complete existing dwelling house, to relocate existing entrance and to install effluent treatment system and percolation area, together with the carrying out of all associated ancillary site worksDecision record indexed
Development consisting of (1) retention for existing fill material on site (area = 0.3HA, Volume = 1530m3), existing hardstand parking area and existing portacabin office (2) remove existing silo, walls and existing concrete batching area including associated loading areas (3) installation of entrance gate, boundary treatments, designated parking areas with petrol interceptor and the carrying out of all associated site worksGrounds not yet categorised
Development consisting of (1) retention of exisiting fill material on site (Area = 0.3HA, Volume = 1530m3) existing hardstand area, existing sile, existing portcabin office, existing storage walls and existing concrete batching area including associated loading areas: (2) permission for proposed further filling of lands with inert soils and stones (Area = 0.88HA, Volume = 15500m3), proposed installation of entrance gates, wheel wash, boundary treatments, parking area with petrol interceptor and the carrying out of all associated ancillary site worksGrounds not yet categorised