Planning records
Showing 1-3 of 3 public recordsThe removal of the existing acoustic & dust screen, which consist of stacked shipping containers with mesh netting on top to allow for the erection of an extension to an existing permitted materials recovery facility. The extension is located to the western elevation of the existing building, which has a gross floor area of 1,006 sqm. The maximum height of the western extension is 10.25 metres with all associated site development works above and below ground. The development relates to a waste material recovery site which is operated under a Waste Licence granted by the EPA
Erection of three separate extensions to an existing permitted materials recovery facility and all other associated site development works above and below ground. The extensions are to the western, southern and eastern elevations. The western extension has a gross floor area of c. 7826sqm and was constructed to enclose and weather protect plant associated with the permitted materials recovery facility. The extension also encloses the permitted wood shredding activity on site. The maximum height of the western extension is c 10.25 metres. The southern extension has a gross floor area of c. 194sqm and was constructed to enclose and weather protect the loading of vehicles. The maximum height of the southern extension is 1. 10.25m. The eastern extension has a gross floor area of c. 496.7sqm and was constructed to enclose and weather protect plant associated with the permitted materials recovery facility. The maximum height of the eastern extension is c. 8 metres. The development relates to a waster material recovery site which is operated under a Waste Licence graned by the EPA
Erection of three separate acoustic and dust screen structures associated with an existing permitted materials recovery facility and all other associated site development works above and below ground. The three structures are located to the western side of the existing centrally located Screening / Sorting building. Structure A is located a minimum of c. 36m from the western boundary, it covers an area of c. 121.2sqm and has an overall height of c.12.26m. Structure B is located a minimum of c. 67m from the western boundary, it covers an area of c. 166.7sqm and has an overall height of c. 8.347. Structure C is located c. 94m from the western boundary, it covers an area of 136.2sqm and has an overall height of 10.91m. The structures include stacked shipping containers with mesh netting on top and have been erected to provide acoustic and dust screening for the ongoing activity of the materials recovery facility including waste wood processing and metals separation. The development relates to a waste material recovery site which is operated under a Waste Licence granted by the Environmental Protection Agency