20198Granted
Finnaun,
For a 10 year permission to construct a wind farm consisting of 22 wind turbines, each with maximum hub height of 90m, maximum rotor diameter of 101m and with a total tip height of 140.5m, one permanent 90m meteorological mast, a sub-station including three control buildings and associated equipment, expansion of three existing borrow pits and two new borrow pits, new internal access roads, upgrading of existing internal access roads, expansion of drainage system, turbine hardstands, wastewater holding tank, underground cables and ancillary works (gross floor space 368.48sqm)Decision record indexedDecision02 April 2020View record