Planning records
Showing 1-23 of 23 public recordsPlanning permission is sought for provision of internally illuminated fascia signage atop entrances on north western and north eastern elevations; provision of digital display screens (each 1,229x714mm) on north western elevation; and provision of vinyl signage on north western and north eastern elevations.
The proposed development will consist of the amalgamation of existing Unit 54 (c. 174 sq.m) and existing Unit 55 (c. 201 sq.m), both retail use, into a single retail unit of c. 381 sq.m through the removal of the existing partition wall between the two units. New internal centre façade for the amalgamated unit to include for 2 no. banner signs of 6.4m x 1.25m.
Provision of internally illuminated fascia signage atop entrances on western and southern elevations; provision of digital display screens (each 1,229x714mm) on western and southern elevations; and provision of vinyl signage on western and southern elevations.
The development will consist of the installation of 2 no. retail/food/beverage kiosks in the existing mall of Liffey Valley Shopping Centre. Each kiosk is c.15 sq.m (5m x 3m) and c.4m in height with signage of c.12.8 sq.m (2 no. signs of 5m x 0.8m and 2 no. signs of 3m x 0.8m) and an associated seating area of c. 53.8sq.m.
Next retail limited intend to apply for permission for the development at this site Unit 1-4, Liffey Valley Shopping Centre, Fonthill Road, Clondalkin, Dublin 22. The development consists of the replacement of existing manual entrance door to new automatic sliding doors.
The proposed development will consist of the subdivision of existing Unit 40B (c.161sq.m) into a retail unit (c. 83sqm), a storage room (c.29 sq.m), a circulation corridor (c. 37 sq.m) and a non-accessible area (c.7 sq.m), and all associated site services and development works.
Permission for development Units 5A & 5B at Liffey Valley Shopping Centre. The proposed development will consist of the amalgamation of existing unit 5A (c127sqm) and existing unit 5B (c 46sqm) both retail use into a single retail unit of c175sqm through the removal of the existing partition wall between the two units. All associated site services and development works
The proposed development will take place within the Green, Red and Purple car parks with an overall site area of c. 0.19 ha and will include, 1 no. additional exit lane and barrier at the existing exit point at the northwestern boundary of the Green car park and 1 no. additional exit lane and barrier at the existing exit point at the northern boundary of the Red car park. This will result in 3 no. exit lanes and barriers in total at each point in both the Green and Red car park. Proposed new landscaping works at the northwestern boundary of the Purple car park (c. 172 sq.m) including the relocation of trees. All associated engineering services and site development works above and below ground.
Development and modifications to development permitted under SDCC Reg Ref. SD23A/0068 as follows: 1. The extension of the Yellow Mall Entrance Lobby area, with a total floor area of 66 sq.m, relocated between Unit 20 and proposed Unit 21B and the extension of the Mall Area by c. 77 sq.m, resulting in an increase of the parapet height of the canopy over the Yellow Mall Entrance Lobby and units by 200mm; 2. The subdivision of Unit 21 as permitted under SD23A/0068 to create 2 no. separate units namely Unit 21A and 21B (as food / beverage units) with a gross floor area of approximately 178 sq.m and 196 sq.m respectively; 3. The removal of the ATM on the eastern facade of Unit 20, and related services located internally within Unit 19, resulting in a decrease in floor area of Unit 19 and increase of floor area of Unit 20 by c. 6 sq.m; 4. Change of Use of Unit 20 from retail use (permitted under SD23A/0068) to food / beverage use; 5. Minor facade amendments to the Unit 20 and proposed Unit 21B to remove glazing and replace with solid facade panelling in line with fire safety requirements; 6. The addition of 8 no. PV panels to serve the extended Entrance Lobby, and all necessary infrastructure and connections for a further 5 no. PV panels if required by Unit 21A in the future, all at roof level to the west of the glazed drum; 7. All associated site development works.
The removal of mezzanine level (c. 66 sq.m) located at Store 14B and the amalgamation of Retail Unit 18B (c. 99 sq.m), Retail Store 14A (c. 48 sq.m) and remaining Retail Store 14B (c. 10 sq.m), associated escape corridor (c. 7 sq.m) and lobby / corridor (c. 3 sq.m) into a single unit of c. 171 sq.m, through the removal of existing walls (c. 4 sq.m) between the retail unit and stores, and all associated site and development works.
Demolition and removal of the existing entrance canopy at first floor level and the construction of a new entrance canopy over extended units. Replacement of existing Liffey Valley signage on the northern elevation with a new sign of 3.Sm x 8.35m. Upgrading of the existing northern elevation facade to a render finish. New tinted transparent window vinyl to be applied internally to the existing drum's glazing; Extension of the existing Units 20 and 21 into the existing plaza to facilitate increased units of 240sq.m and 380sq.m; Extension of Unit 19 to provide for relocation of ATM and ancillary back of house area (6.7sq.m) on the eastern elevation of the extended Unit 20; The total additional floorspace is 394.7sq.m; Unit 20 is proposed as a retail unit and Unit 21 is proposed as a food/beverage unit; Facade signage is proposed on the northern elevation of both units (0.625m x 5.09m) and on the eastern elevation of Unit 20 and western elevation of Unit 21 (both 0.665m x 2.16m) (total unit facade signage of 9.24sq.m); Relocation of existing 6 accessible car parking spaces, currently located to the north of the entrance/plaza, to within the existing car park and landscaping of proposed site in line with recently upgraded landscaping in the centre; The placement of 2 car-parking pay station units with canopy to the east and west of the site adjacent to the existing Centre facade; All Associated Site Development Works.
NEXT PLC are applying for permission for the replacement of 2 x (internally illuminated) external signs 1.9m x 6m and 1 x (internally illuminated) external sign 1.5m x 4m.
Amalgamation of the existing Unit 14 (c. 227sq.m) & Unit 15 (c.172sq.m), both retail use, into a single retail unit of c. 403sq.m through the removal of the existing wall between the two units; All associated site services and development works.
New signage (2.225sq.m) to the side elevation (north east facing), all associated site and ancillary works in accordance with the plans as submitted.
A new unmanned service station development consisting of construction of new petrol filling station forecourt with 4 dispensers, 2 underground fuel storage tanks with canopy structure (covering c. 235sq.m and 6.2m in height) with associated signage; Widen existing site entrance to the north-east of the site and creation of new egress location onto the Fonthill Road along the northern boundary to allow one-way internal road network incorporating new pedestrian crossing over existing footpath at site egress location; Automatic brush car wash and adjoining jet car wash with water recycling system; Single storey services building structure comprising of a car wash plant room and comms room area (gross floor area 16.3sq.m.); 4 electric charging bays, each comprising of a parking space and electric vehicle charging unit and associated signage; 3-room ESB substation to cater for EV charging infrastructure (gross floor area 38.3sq.m.); Air/Water services area with 2 car parking spaces; 2 internally illuminated double-sided totem signs, 1 at site entrance (4m high x 1.91m wide) with advertising area 15.3sq.m and 1 adjacent the new site egress location (5.8m high x 1.91m wide) with advertising area 22.16sq.m; All other associated underground and overground infrastructure, drainage, lighting, CCTV unmanned systems, landscaping and site development works.
Relocation of the existing customer service desk (c. 16sq.m) permitted under Reg. SD19A/0197 from the Yellow Entrance Mall of the Central Rotunda to a new location at the junction of the West Mall and the Central Rotunda and all ancillary site development works.
The amalgamation of Unit 25 (c. 23sq.m) with adjoining existing ATM unit (c10sq.m) to provide single consolidated unit (c 34sq.m); existing ATM wall openings to be closed; the removal of an internal partition wall; existing door opening to be closed off at the rear of the unit; and all associated site development works.
Continuation of the permitted temporary events area of 2,359sq.m at the events area located to the rear of the centre between service yards 2 & 3 (as previously permitted under Reg. SD15A/0313 and Reg. SD18A/0148 for a period of 3 years.
1 freestanding and illuminated entrance signage structure (c.5.46 metres in height and c.12.15 metres in length) displaying 'Liffey Valley' located adjacent to Fonthill Road and all associated ancillary site development works.
Amendments to the permitted development previously granted under SDCC Ref. SD19A/0320 and An Bord Pleanala Ref. 306251-19; including the erection of 2 bus shelters on Fonthill Road each comprising of a bus stop sign, real time passenger Information (RTPI) unit and a two-sided internally illuminated advertising panel (c. 1.9sq.m each side); road alterations on Fonthill Road comprising of the amendment of staggered to straight Toucan crossings, the addition of a new straight Toucan crossing, the replacement of bus lay-by areas with bus islands, and the removal of a left slip lane; all associated site services and site development works.
Retention permission for the continuation of the temporary staff car park for a period of 5 years consisting of 204 spaces (previously authorised under Planning Application Reg. Ref. No. SD15A/0159) and a shop mobility structure (c. 34sq.m). Permission is also sought for a period of 5 years for a new barrier at the entrance to the temporary car park: and all ancillary site services, drainage and site development works.
Mixed leisure, entertainment and retail extension to the existing Liffey Valley Centre organised around a large public plaza and pedestrian friendly east-west street with parapet levels varying between c.15m and c.18m above street level; the scheme provides for: (a) a two storey commercial extension (c.46,783sq.m gross) with plant areas at roof level to the existing Centre providing for mixed leisure and entertainment units (c. 9,247sq.m gross), food/beverage units (c.4,052sq.m gross), retail units (c. 21,051sq.m gross) and all ancillary space and circulation areas (c.12,433sq.m gross); the main retail area will be anchored by two stores (comprising a total of c.10,090sq.m gross) located on either side of the public plaza; (b) a central public plaza fronting onto the east-west street covered with a large glass canopy in the form of a curved gridshell structure, this structure will be the tallest part of the proposal at a height of c. 20m above street level, the food/beverage units are located around the plaza at both ground and first floor levels; (c) car parking over two levels (c.900 spaces including 45 universal access spaces and c.200 long stay cycle spaces with an area of c.27,917sq.m gross) located north-east of the extension area c. 290 short stay cycle spaces, 27 short stay car parking spaces and car/taxi set down areas on the east-west street; c.100 long stay cycles spaces provided within the existing car park to the adjacent to the Westend development (Vue Cinema and restaurants); approximately 2,085sq.m of existing gross floor space is to be removed/demolished over ground and first floor to facilitate the extension; the proposal includes all associated service yards, plant and equipment, photovoltaic panels, electricity substations, all utility connections and works, street lighting, signage, landscaping and boundary treatments; the proposal includes the construction of new toucan crossing points for cyclists on Ascail an Life (Ring Road around the Centre) at the western end of the east-west street to provide safe connection to the existing cycle network. An Environmental Impact Assessment Report (EIAR) is submitted.
Retention of coffee shop use & internal seating area within shop unit at ground (79sq.m); provision of additional internal seating area of 51sq.m; new shop opening onto shopping mall and seating area of 15sq.m within the mall directly in front of shop unit; all associated site services & development works.