  1. © OpenStreetMap
    23/6031Granted

    Blacks Brewery and Distillery Cappagh Kinsale Co.Cork

    Permission is sought for the development of the following (alterations to the permitted development under planning ref. no. 21/6582): a) change of use of permitted office space at first floor level to hospitality and retail space ancillary to the permitted brewery and distillery, b) relocation of public entrance to the visitor centre to south elevation, c) minor changes to roof profile (the permitted ridge level retained), d) the development of a second raised terrace recreational space on the south elevation at first floor level (152m2) ancillary to hospitality uses on site, and all other associated site works and ancillary services on site. Retention permission is sought for the ‘building as built’, incorporating the following alterations to the permitted development under planning ref. no. 21/6582: a) The removal and replacement of steel portal framed sub-structure of the former ‘Old Shirt Factory’, b) fenestration changes to north, south, east and west elevations, c) increase in height at ground floor level to the permitted under croft area (476m2) allowing storage for the brewery and distillery operation, d) reduction in number of roof lights from 12 to 3, e) reorientation of covered fire escape to western elevation, f) provision of boiler room as constructed to the rear of the brewery and distillery building, and g) provision of electrical switch room to the west elevation.Decision record indexed
    Decision04 December 2023View record
  2. © OpenStreetMap
    21/6582Granted

    `Former Shirt Factory' Cappagh Kinsale Co. Cork

    (i) Demolition of the existing annexes to the front elevation and side elevation of the `Former Shirt Factory’ (which is to become the production hall), in addition to demolition of the steel ruin frame structure on site, (ii) Modernisation of existing building elevations (the proposed production hall), comprising alterations to the building façade, including revised material finishes to the roof and elevations incorporating fenestration changes allowing for a brewery and distillery at ground floor level, (iii) Construction of extension to the front elevation of the existing building on site (the proposed production hall) consisting of ancillary office space, retail space at first floor level with lower and upper terraces and associated signage, (iv) A storage hall, (v) The upgrading of the existing access into and through the site including a swale incorporating the length of the site with drainage to Commogue Marsh, (vi) Ancillary on-site car and bicycle parking provision, (vii) Beer storage tank farm, (viii) Malt grain storage silo farm, (ix) Plant including steam boiler unit and cooling ventilation unit, (x) Delivery yard permitting open storage, (xi) Landscaping including fencing, new boundary treatments, lighting, and pedestrian linkages to nearby footpath, and (xii) Pumping station, ground level changes with all other associated site works and ancillary services.Decision record indexed
    Decision26 January 2022View record