to
to

Planning records

Showing 1-6 of 6 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    2561126Granted

    Garrane Ballinderry, Nenagh, Co. Tipperary

    1) Construction of a concrete hurling ball wall, associated catch netting, all weather astroturf surface, and installation of 2no. 10m lighting columns complete with 2no. LED floodlights on each column to illuminate the ball wall to the north western corner of existing playing pitch; 2) Installation of 6no. 15m lighting columns complete with 2no. LED floodlights on each column to illuminate existing training pitch to the northern end of existing sportsfield; 3) Installation of 6no. 6m lighting columns complete with LED lights to illuminate existing perimeter walkway, including all ancillary civil and site works theretoDecision record indexed
    Decision17 December 2025View record
  2. © OpenStreetMap
    24/6272Granted

    Corracunna, Coolnanave Garrane Mitchelstown Co. Cork

    The application site comprises an area of c. 5.61hectares. The site is primarily located in the townland of Corracunna and is surrounded by agricultural lands to the North and East, with the N73 national route to the south, and the L90813 local road to the west. The site takes in lands at Coolnanave and Garrane, on the western side of the L90813, to the west and north west of the main site area, to provide woodland planting and an underground drainage pipe and outfall. The proposed development comprises the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured) and a bio-based fertiliser from organic material. The total proposed gross floor area of the development (including internal plant areas and ancillary structures) will be c. 3,419.5 sq.m. Permission for the; (1) Demolition of existing single storey disused agricultural buildings, silos, and tank within the western portion of the site (total demolition gross floor area (GFA) of c. 1,781 sq.m). One single storey agricultural building (with GFA of c. 87.8 sq.m and height of c. 5.1m) will be stabilised and retained as a biodiversity building. (2) Construction of 3 no. digesters (c.15.6m in height), 2 no. digestates storage structures (c. 15.5m and 11m in height), 2 no. liquid storage tanks (c.12.2m in height) and a liquid feed tank (c. 8m in height), located in the southeast portion of the site. (3) 3 no. pasteurisation tanks (each c. 6m in height), a post-pasteurisation cooling tank (c.12.2m in height) and pre fertiliser manufacturing tank (c.12.2m in height), located in the centre of the site. (4) part single-storey and part two-storey reception hall (with a GFA of c. 2,112.6 sq.m and an overall height of c. 15.5m) to accommodate a laboratory, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to the reception hall, located in the central portion of the site, to the north of the digesters. (5) a single-storey solid digestate storage and nutrient recovery building (with a GFA of c. 879.9 sq.m and a overall height of c.12.4 in height) will be located to the west of the reception hall, in the central portion of the site. (6) Odour abatement plant (with a maximum height of c. 6m in height) and equipment, a digestate offtake area, and a fuel tank (c. 1.6 in height) will be provided to the north of the solid digestate storage and nutrient recovery building. (7) Construction of an ESB substation (c. 3.4m in height) 2 no. CO2 tanks and a CO2 loading pump (c. 14.5m in height), along with associated plant structures including CO2 auxiliaries, CO2 liqueufactor, a CO2 compressor and a CO2 pre-treatment skid (with an overall height of c. 6.7m), located in the southwest portion of the site. (8) Construction of a biogas treatment skid, a biogas compression system, a biogas upgrading module (with an overall height of c. 5.1m) and a grid injection unit within a fenced compound (c. 2.8m in height), located within the southwestern portion of the site. (9) Construction of an emergency biogas flare (c. 11.3m in height) 2 no. propane tanks (c. 1.3m in height) and a grid off take skid, located further to the west of the site. (10) Construction of O2 generation unit (c. 2.6m in height), a biomethane boiler (c. 5.6m to top of flue stack), a combined heat and power (CHP) unit and panel room (with a maximum height of c. 6m to top of flue), 2 no. pump houses (c. 2.6m in height, each with a GFA of c. 29sq.m) located in the southwestern portion of the site, south of biogas upgrading structures. (11) Construction of a two-storey ancillary office and administration building (with an overall height of c. 8.6m and GFA of c. 271.5 sq.m), located within the western portion of the site, adjacent to the main site entrance. (12) A discharge pipe route extending to the northwest of the main anaerobic digestion facility site, crossing the L90813 and through agricultural lands to the River Funshion. (13) Alterations to theDecision record indexed
    Decision27 November 2025View record
  3. © OpenStreetMap
    2560430Granted

    Garrane, Ballinderry, Nenagh

    1) as-built fuel storage shed; 2) Permission for the construction of single-storey extensions to the north-western corner and eastern side of our existing dwelling house, including alterations of the existing external elevations, roof profile, and all ancillary site works theretoDecision record indexed
    Decision04 July 2025View record
  4. © OpenStreetMap
    24429Granted

    GARRANE, TRALEE, CO KERRY

    RETAIN (1) NORTH EAST REAR EXTENSION - STORE/BOILER HOUSE, (1A) NORTH EAST EXTENSION TO GARAGE, (1B) SOUTH WEST WINDOW TO EXTENSION OF GARAGE, (2) NORTH EAST EXTENSION TO MAIN HALL/LOBBY, (3A) NORTH HIGH LEVEL WINDOW TO W.C., (3B) NORTH EAST VELUX ROOF LIGHT TO W.C., (4) SOUTH WEST VELUX ROOF LIGHT TO CORRIDOR, (5) NORTH WEST GABLE WINDOW TO GARAGE, (6) SOUTH EAST WINDOW TO BEDROOM 5, (7) SOUTH WEST VELUX ROOF LIGHT TO STUDY/BEDROOM 4, (8) SITE ENTRANCE, (9) DWELLING HOUSE AND ALL WITHIN REVISED SITE BOUNDARIESDecision record indexed
    Decision31 January 2025View record
  5. © OpenStreetMap
    23/5083Granted

    Garrane Mitchelstown Co.Cork

    The development will consist of the construction of 3 no. warehouse units (Unit A, Unit B & Unit C) with ancillary office and staff facilities and associated development as follows: 1) Warehouse ‘Unit A’ will have a maximum height of 15.7 metres with a gross floor area of 8,550 sq.m comprising warehouse area (7,702 sq.m) and ancillary offices (433 sq.m) with staff facilities (415 sq.m), (ii) Warehouse ‘Unit B’ will have a maximum height of 17.15 metres with a gross floor area of 11,973 sq.m comprising warehouse area (10,958 sq.m) and ancillary offices (566 sq.m) with staff facilities (449 sq.m), (iii) Warehouse ‘Unit C’ will have a maximum height of 16.5 metres with a gross floor area of 6,691 sq.m comprising warehouse area (6,141 sq.m) and ancillary offices (288 sq.m) with staff facilities (262 sq.m). The development will also include: the demolition of 2 no. existing agricultural sheds; the provision of a vehicular and pedestrian entrance to the side from the Limerick Road (R513); an internal estate road with internal access/egress spurs; footpaths and pedestrian accesses; 163 no. car parking spaces including EV and accessible parking spaces; marshalling yards; gates; level access goods doors and associated ramps; dock levellers; bicycle parking; lighting; ESB substations; wastewater pumping station; plant including firefighting tank; external canopies; green walls; boundary treatments; hard and soft landscaping; and all associated site and development works above and below ground. The lands are generally bound to the north by the L95131-1 road, to the south by dwellings and greenfield lands, to the east by greenfield lands, and to the west by dwellings and the Limerick Road(R513). An existing vacant structure Gurrane House is located at the north western boundary of the site.Decision record indexed
    Decision02 April 2024View record
  6. © OpenStreetMap
    23/5946Granted

    Saint Finbarrs Garranes, Templemartin Bandon Co.Cork

    Permission for construction of a one-storey addition to the west of the existing dwelling house with proposed sky lights including two skylights to the existing roof, proposed new internal alterations to existing dwelling house including new windows and doors to the east and north elevations of the existing dwelling house, demolition of existing chimney to the front elevation of the existing dwelling house, proposed garden wall with new timber garden gate to the west of existing dwelling house and all associated site worksDecision record indexed
    Decision17 November 2023View record
Showing 1-6 of 6
PreviousPage 1 of 1Next