Planning records

Showing 1-2 of 2 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    211360Refused

    GORTMALOON WEST, GLENCAR

    CONSTRUCT A SINGLE STOREY DWELLING HOUSE AND DETACHED GARAGE WITH SEPTIC TANK, SECONDARY TREATMENT "PURAFLOW" MODULES AND SOIL POLISHING FILTER AND ALL ASSOCIATED SITE WORKSGrounds not yet categorised
    Decision28 January 2022View record
  2. © OpenStreetMap
    21616Granted

    LYREBOY GORTMALOON WEST SHANACASHEL BREANLEE, COOMLETTA KEEAS BOHEESHIL SHRONAHIREE MORE COORNAMEANA, CURRAGH BEG GORTMALOON EAST DERREENANARYAGH DROMALONHURT LYRANES UPPER AND

    FOR DEVELOPMENT ALONG A 12.6KM LONG SECTION OF AN EXISTING 20KV OVERHEAD ELECTRICITY LINE (REFERRED TO AS "THE GLENCAR LINE") LOCATED BETWEEN STRUCTURES 1 TO 142 INCLUSIVE. THE DEVELOPMENT CONSISTS OF REFURBISHMENT AND UPGRADING WORKS INCLUDING (WHERE NECESSARY) REPLACEMENT OF EXISTING POLES, AND THE PROVISION OF 5 NO. NEW POLES, ALONG THE EXISTING OVERHEAD ELECTIRCITY LINE. REPLACEMENT POLES WILL BE CONSTRUCTED AT, OR IMMEDIATELY ADJACENT TO, THE EXISTING STRUCTURES THAT THEY WILL REPLACE. REPLACEMENT AND NEW POLES WILL HAVE A MAXIMUM HEIGHT OF 12M ABOVE GROUND; AND BE SIMILAR IN APPEARANCE TO EXISITNG POLES. ADDITIONAL UPGRADE WORKS WILL INCLUDE: INSTALLATION OF STAYS; REPLACEMENT OF EXISTING EQUIPMENT E.G. HEADGEAR, INSTALLATION OF ADDITIONAL EQUIPMENT; INSTALLATION OF A NEW 3-PHASE CONDUCTOR ALONG THE FULL LENGTH OF THE LINE; AND ALL ASSOCIATED ANCILLARY WORKS INCLUDING THE PROVISION OF TEMPORARY ACCESSWAYS. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATIONDecision record indexed
    Decision28 July 2021View record