to
to

Planning records

Showing 1-8 of 8 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    25/4066Granted

    Circle K, Junction 14, M8 Gortore Fermoy Co.Cork

    Permission for A high-power electric vehicle charging hub and associated infrastructure consisting of the following: 1) installation of 10 no. electric vehicle charging with 5 no. associated charging units to replace 12 no. existing car parking spaces, 2) installation of a new canopy above EV charging spaces with internally illuminated signage, 3) new EV banner sign, 4) relocation of existing lighting columns and electrical cabinet, 5) installation of a new ESB substation and 6) all other associated site development, landscaping, road tie in and surface water drainage worksDecision record indexed
    Decision14 March 2025View record
  2. © OpenStreetMap
    24/4618Granted

    Gortore Fermoy Co Cork

    Permission to construct a single storey dwelling house, install a septic tank with percolation area, new site entrance and all associated site works.Decision record indexed
    Decision09 September 2024View record
  3. © OpenStreetMap
    24/5316Granted

    Cookey Cottage Gortore Fermoy Co. Cork

    Permission to construct a rear extension and alterations to the elevations all to their dwelling.Decision record indexed
    Decision04 September 2024View record
  4. © OpenStreetMap
    23/6127Granted

    Gortore Fermoy Co. Cork P61VX76

    Permission for the retention of Planning permission to a dwelling for an existing storage basement, window alterations and change in ridge height along with any other ancillary works.Decision record indexed
    Decision13 December 2023View record
  5. © OpenStreetMap
    23/5823Granted

    Circle K Junction 14 on the M8 Motorway Gortore Fermoy, Co. Cork

    The proposed development will consist of modifications to the internal floorspace layout of the permitted service station amenity building to incorporate 1no. new food offer (17.8sqm in area) and all other associated site development works.Decision record indexed
    Decision02 November 2023View record
  6. © OpenStreetMap
    23/4831Granted

    Circle K Junction 14, M8 Motorway Gortore, Fermoy Co Cork

    A change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (i.e off-licence use) within the overall permitted retail unit, where the floor area for the off-licence use is 20.2sqm. and ancillary to the primary retail use.Decision record indexed
    Decision20 June 2023View record
  7. © OpenStreetMap
    21/6127Granted

    Gortore Fermoy Co. Cork

    To construct single storey extensions to rear and sides of existing dwelling, bay window to front of existing dwelling and ancillary works.Decision record indexed
    Decision10 January 2022View record
  8. © OpenStreetMap
    20/5358Granted

    Motorway Services Area at Junction No. 14 of the M8 Motorway Gortore and Moorepark Fermoy, Co. Cork

    The subject application principally proposes the provision of a drive-thru facility at the existing restaurant and the change of use of the existing service access route to a drive thru laneway. The proposed development also includes directional road marking, a goal post height restrictor at the entrance to the laneway; 2 no. new customer ordering points with canopy tops; 3 no. double digital menuboards (1.64m x 0.1m x 2.1m); 1no. single digital menu board (0.8m x 0.1m x 2.1m); change of use of the existing service layby to 1 no. grill parking bay adjacent to the west elevation of the restaurant building; ‘pay’ and ‘collection’ graphics added to the pay and collection windows respectively along the west elevation of the restaurant building; and a new 15’’ digital marketing screen installed in the collection window along the west elevation; and all associated site works above and below ground.Decision record indexed
    Decision21 August 2020View record
Showing 1-8 of 8
PreviousPage 1 of 1Next