To construct an extension to the side of dwelling with upgrade of wastewater system to current EPA guidelines and all other associated siteworksDecision record indexed
Of an existing single storey dwelling and entrance onto public road, demolition and reconstruction of front boundary wall and piers, decommissioning of existing borewell, wastewater treatment system and percolation area and construction of new borewell, wastewater treatment system and percolation area together with all other associated site worksDecision record indexed
For an existing single storey dwelling, entrance, boundary walls, septic tank and percolation area together with all other associated site worksGrounds not yet categorised
To build a storey and a half type residence, vehicle entrance, septic tank and percolation area, new borehole, and all associated site worksGrounds not yet categorised
A) to construct a roof over an existing unroofed cubicle area. b) Permission to construct silage pit and all associated site worksDecision record indexed
For a one and a half storey, four-bedroom dwelling house, a detached garage, a new site entrance, a new packaged wastewater treatment system and polishing filter, a bored well and all associated site works on landsDecision record indexed
To construct a bungalow, entrance, waste treatment system with polishing filter, borehole, soakpits and all other associated site works on landsGrounds not yet categorised
For the following. 1. To remove a front extension, a rear extension and a side extension. 2. To lower the roof and remove the first floor of the existing dwelling, thus making it a single storey dwelling. 3. Construct a single storey extension to the rear of the now altered, refurbished single storey dwelling. 4. A new on-site wastewater treatment system and raised soil polishing filter and all associated site works on landsDecision record indexed
To extend an existing agriculture shed to provide a slatted dairy unit and milking parlor and to construct a Silage Pit and all associated site worksDecision record indexed
On the grant of Outline Planning Permission Ref: 21/1061 for a dwelling, garage, entrance onto laneway, wastewater system, borehole, soakpits and all other associated site worksDecision record indexed
A new build two-storey detached dwelling, and detached garage to include associated treatment system works and all site ancillary worksDecision record indexed
For development consisting of a two-storey dwelling house with part single storey, integrated car port and double garage, waste water treatment system and associated site worksDecision record indexed
To construct a 2 storey dwelling, garage, entrance + avenue, wastewater treatment system, borehole, soakpits & all other associated site worksGrounds not yet categorised
TO CONSTRUCT A DAIRY CUBICLE SHED, UNDERGROUND EFFLUENT STORAGE TANK, SILAGE PINK, CONCRETE APRONS AND ALL OTHER ASSOCIATED SITE WORKSDecision record indexed
For the construction of A) A grass pitch with ball stop netting B) An artificial surface training area with concrete "ball wall" and flood lighting C) A clubhouse with on site wastewater treatment system d) Vehicular & pedestrian access to Main Street with parking facilities E) Upgrade works to internal access roadways and all ancillary site works atDecision record indexed
For development consisting of a two storey dwelling house with part single storey, detached garage and storerooms, wastewater treatment system and assocaited site worksDecision record indexed
Retention Permission to retain indefinitely calving shed extension to existing buildings and Permission to erect cubicle shed extension to existing buildings with adjoining slatted slurry tanks, feeding area, silage wall and base and all associated worksDecision record indexed
To demolish outhouses and construct an extension to dwelling along with renovation works to include raised ridge level, to upgrade existing wastewater system to current EPA Guidelines, to relocate entrance to improve sightlines and all other associated site worksDecision record indexed
The following external works to the existing school, the demolition and removal of the existing external stepped access and associated handrails to the West (Front) of the existing school and the construction of a new external stepped access and associated handrails to the West (Front) of the existing school, the erection of new fencing to the partial perimeter of the existing playground area to the West (Front) & North (Side) and the construction of new partial perimeter fencing to the North (Side) of the existing site boundary together with resurfacing of the existing playground areas, together with all associated and ancillary site worksDecision record indexed
To construct a bungalow, garage, entrance, wastewater treatment system with percolation area, mains water connection, soakpits and all other associated site worksDecision record indexed
To construct a dormer bungalow, garage, entrance, wastewater treatment system with percolation area, mains water connection, soakpits and all other associated site worksDecision record indexed
Is sought for the following development at a Protected Structure (ref. no D59- in the Kilkenny City and County Development Plan 2021-2027/NIAH Ref no. 12319006): a) Demolition of one no. flat roof, concrete extension to the rear of the building, 1 No. lean-to extension to the rear of the building and one no. corrugated steel shed to the front of the property. b) Construction of a part single storey, part two storey 125m2 extension to the rear of the property. c) Change of use of the building from derelict creamery building to a mixed-use development consisting of short-term tourist accommodation, multi-purpose communal spaces and one no. private apartment. d) Internal alterations, formation of new openings to the rear of the existing building and the installation of new windows and doors. e) New vehicular entrance from the R698 public road. f) Provision of bicycle parking and 11 No. car parking spaces including 4 No. EV charging spaces g) Provision of 18 No. Motorhome Aire spaces and associated facilities. h) Construction of a 36m2 facilities building consisting of toilets, showers and bin store. i) Provision of PV panels to the rear of the existing building. j) Public lighting to car-parking and walkways throughout the site. k) Landscaping and planting throughout the site. l) Site drainage works including surface water infiltration and new on-site wastewater treatment facility. m) Site boundary works to existing and new boundaries.Grounds not yet categorised
To demolish existing sheds, to construct a single storey extension to the side/rear of the existing dwelling, comprising of kitchen/dining/living and bedroom with alterations to the existing dwellings front elevation, roof and windows, and to construct a detached shed/garage and all associated site works on our landsDecision record indexed
To demolish existing dwelling and outbuildings and construct a replacement 2 storey dwelling with increased set back from the public road, improvement works to existing entrance, wastewater treatment system, soakpits, all other associated site worksDecision record indexed
To construct a 33 meter multi-user lattice tower with delta headframe carrying telecommunications equipment, together with associated equipment and cabinets enclosed within a 2.4m palisade fence compound on Coillte landDecision record indexed
Ref 21-401 for a 2 storey dwelling, garage, access via existing entrance, borehole, soakpits and all other associated site worksDecision record indexed
Poulacapple National School, via Callan, Co. Kilkenny
Preschool and Breakfast Club use to the already granted Afterschool Club use in the larger separate prefabricated building located on the school groundsDecision record indexed
Poulacapple National School, via Callan, Co. Kilkenny
2no. prefabricated buildings, following the recent completion of the school extension project. The larger one shall be for an Afterschool Club and the smaller one shall be for a Sensory Room for pupils with ASDDecision record indexed
A side and rear extension comprising a replacement mainstream classroom, replacement resource room, user assisted toilet, lobby with removal of prefab classroom and prefab resource room including all ancillary and associated services and Permission for Retention for a temporary period of the prefab classroom and prefab resource room relocated to the Southern boundary of the playground for the duration of the proposed workDecision record indexed
To complete the development granted under PL 17/557 which consists of a single storey dwelling, wastewater treatment system, new entrance and associated site works atDecision record indexed
To construct a bungalow, garage, entrance, wastewater treatment system with percolation area, mains water connection, soakpits and all other associated site worksDecision record indexed