to
to

Planning records

Showing 1-6 of 6 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    2561305Granted

    Gorteen Lower, Nurney, Co. Kildare.

    (A) refurbishment of existing derelict cottage complete with new natural slate roof and the restoration of existing stone walls with the insertion of new window fenestration to front (north) elevation and side (west) elevation, (B) single storey extension to Front (north) elevation and side (east) elevation and single storey extension to rear (south) elevation, (C) the installation of an Oakstown BAF wastewater treatment plant with polishing filter percolation area and (D) upgrading of existing agricultural entrance to a new vehicular recessed entrance gate and piers and all associated site works. Revised by Significant Further Information which consists of: The redline boundary has changedDecision record indexed
    Decision26 June 2026View record
  2. © OpenStreetMap
    23894Granted

    Gorteen Lower, Nurney, Co. Kildare

    New ancillary structures relating to the operating of the existing biogas facility as follows: 1. Biofilter & Air Scrubber (including exhaust stack affixed to existing reception building at max. height of 14m above ground level). 2. LPG Tanks Compound. 3. Enclosed Flare. 4. Provision of 3 No. Storage Digestors with gas storage domes (max. height c.13m). 5. Biogas Upgrader (including Absorption Column 15.257m and a Stripper Column 12.8m). 6. Compressor. 7. Additional standby CHP 2 Enclosure. 8. LPG Boilers. 9. Carbon Filters. 10. Abstraction Sump. 11. Switch Room. 12. Vertical biofilter. 13. Co2 liquefaction plant (max. height 11.3m). 14. New bund wall around the perimeter of the site (max. 0.5m above ground level. 15. Attenuation Tank and all associated site works including decommissioning of existing lagoons and new surface water arrangements. Revised by Significant Further InformationDecision record indexed
    Decision15 February 2024View record
  3. © OpenStreetMap
    2370Granted

    Gorteen Lower, Nurney, Co. Kildare.

    The development to be retained consists of 4 No. ancillary structures relating to the operating of the existing biogas facility as follows: (1) Biofilter (part completed); (2) Extension to the Pasteurising Enclosure to enclose the Augmented Digestate Heating Recirculating System; (3) Fire water tank; (4) Feed tank with bund and all associated site worksDecision record indexed
    Decision29 June 2023View record
  4. © OpenStreetMap
    22344Granted

    Gorteen Lower, Nurney, Co. Kildare.

    Sought for the construction of a single storey dwelling, foul water to on site effluent treatment system and percolation area, surface water to soakaways, shared recessed vehicular entrance (which will replace the existing recessed entrance for adjacent dwelling) and all associated site worksDecision record indexed
    Decision10 August 2022View record
  5. © OpenStreetMap
    211578Refused

    Gorteen Lower, Nurney, Co. Kildare.

    For the construction of a single storey dwelling, foul water to on site effluent treatment system and percolation area, surface water to soakaways, shared double recessed vehicular entrance (which will replace the existing recessed entrance for adjacent dwelling) and all associated site worksGrounds not yet categorised
    Decision04 January 2022View record
  6. © OpenStreetMap
    201117Granted

    Gorteen Lower, Nurney, Co. Kildare.

    Of modifications to an established anaerobic digestion facility as follows: 1. Modifications to gas upgrading plant consisting of: (i) Relocation of Gas Compressor within the footprint area; (ii) Externally located chillers and H2S filters; (iii) CO2 recovery and collection system enclosure. 2. Biogas Boiler enclosures and Pasteurisation Plant Biofilter Enclosure located on a mezzanine floor Plant Room No. 1. 3. Waste Compactor enclosure located at the eastern end of the reception building. 4. Solid and semi-solid biomass feedstock intake structures located at the eastern end of the reception building. 5. Biofilter enclosure at north-east corner of reception building. 6. Geomembrane Manure Storage Basin. 7. Biogas Scrubbing Vessels, storage tank and fire water store. 8. Tipping enclosure over trailer tip and liquid intake bay. 9. Enclosure extension over pasteurisation equipmentDecision record indexed
    Decision06 April 2021View record
Showing 1-6 of 6
PreviousPage 1 of 1Next