Planning records
Showing 1-2 of 2 public recordsPermission for development comprising amendments to the previously permitted office development (Reg. Ref. D15A/0695, as amended by Reg. Refs. D17A/0944, D18A/1240, D18A/0707 and D20A/0422, and as extended by Reg. Ref. D15A/0695/E), at this site, bounded by the previously permitted Two South County office building (currently under construction) to the north and existing office buildings and related surface car parking to the south, east and west. The development, as amended, will consist of a revised and enlarged site area (a net increase of 0.72 ha approximately compared to the site area of the previously permitted development (1.76 ha); a revised 5 storey over basement office building (14,205 sq m approximately excluding basement car park) with rooftop plant and roof garden amenity area, in lieu of the previously permitted Block C, now referred to as Three South County: revisions to the existing and permitted internal road network and access arrangements and revised hard and soft landscaping including the provision of a new urban plaza. The development will also consist of boundary treatments including pedestrian access; bicycle parking; surface car parking; changes in level; attenuation works; pedestrian pathways; plant; ESB substation and all site excavation and development works above and below ground.
Permission for development. The site is bounded by the previously permitted Two South County office building (currently under construction) to the north and existing office buildings and related surface car parking to the south, east and west. The development will consist of the provision of a new 5 storey office building (with rooftop plant and roof garden amenity area/winter garden) over basement car park with a total gross floor area of 14,205 sq m approximately (excluding basement). The development will also include all hard and soft landscaping including the provision of a new urban plaza; boundary treatments including pedestrian access; bicycle parking; surface car parking; revisions to the existing internal road network and access arrangements serving the site; changes in level; attenuation works; pedestrian pathways; plant; ESB substation and all site excavation and development works above and below ground.