Planning records
Showing 1-50 of 32,938 public recordsA bicycle storage unit to accommodate 75 no. bicycles to be located within the TU Dublin Tallaght campus, on an area of existing hardstanding to the east of the Main Campus Building and to the west of the Quad, along with all associated site works and services. The bicycle storage unit will be an enclosed, covered single-storey structure. The gross development floor area of the unit will be 101 sqm.
Development on a site of c. 0.008 ha located West of the SSR Building of the TU Dublin Tallaght Campus. The development shall consist of the construction of a M&E plant area (28m2) comprising an enclosed pump house and external water tank with 2.4m high screen fencing surround.
Development on a site of c. 0.021 ha located West of the SSR Building on the TU Dublin Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24. The development shall consist of the construction of a 90m3 underground fire fighting storage tank.
Footbridge from car park of university campus to Airton Close.
Change of use from existing cafe bar to 15 studios for short-term accommodation / student accommodation / emergency accommodation units on the ground floor to include internal modifications and external modifications with associated private open space and communal facilities; All with associated signage, drainage and site works.
Change of use from 2 existing office units to 2 two bedroom student accommodation units located at first floor level including minor internal modification works and retaining the existing entrances off the main courtyard.
Change of use of part of existing unit from industrial use for use as a restaurant facility with sit-down facility, cafe and deli with take away produce (teas, coffees, sandwiches etc) over two floors and all associated site works.
Two13 x 3.07m sign to existing totem and one 50 x 2.18m signage to building facade fronting Airton Road.
A telecommunications field technician apprenticeship training area, comprising of a compound, 35m by 25m enclosed by a 3m perimeter fence. The area will contain a number of street cabinets, underground access chambers, underground ducting, half height training poles and a storage unit.
Change of use from existing office accommodation (53.67sq.m) to new Sushi Take-Away shop consisting of new service counter with hatch to customer area at front, new internal kitchen, cold store, dry goods store & staff w.c., together with new shopfront signage to front elevation and all associated site works.
Change of use of existing uncompleted and vacant office building to motor showroom and service workshop use (1300sq.m) with ancillary office, staff and customer accommodation; removal of existing projecting porch and stairwell at ground floor level (16sq.m); removal of section of existing floor and projecting stairwell (927sq.m) at first floor level; alterations to existing elevations to include for new glazed curtain walling and insulated wall cladding; new attached illuminated building signage; construction of new single storey extension (90sq.m) to rear to form part of new service workshop; all associated drainage and site works.
Change of use and conversion of an existing vacant two storey office building to provide 38 residential accommodation units to be used as a family hub; 16 units at ground floor level and 22 units at first floor level; with communal kitchen facilities, storage space, family rooms, internal play spaces, staff and ancillary rooms at ground and first floor level; external playground; 19 bicycle spaces and 45 car parking spaces located at ground level; associated site works, services, paving, planting, landscaping, lighting and new boundary walls and fencing; revisions to the existing foul and surface water drainage networks and new tree pit attenuation zones; new boundary treatment; construction of 3 outbuildings and modifications to the existing elevations including the addition of new windows on the rear elevation and rear block; vehicular, pedestrian and cycle access to the development will be maintained via the existing access point on Airton Road. Retention is sought for minor new and altered window arrangements to the north (front) and west (side) elevations.
Change of use and conversion of an existing vacant two storey office building to provide 38 residential accommodation units to be used as a family hub; 16 units at ground floor level and 22 units at first floor level; with communal kitchen facilities, storage space, family rooms, internal play spaces, staff and ancillary rooms at ground and first floor level; external playground; 19 bicycle spaces and 45 car parking spaces located at ground level; associated site works, services, paving, planting, landscaping, lighting and new boundary walls and fencing; revisions to the existing foul and surface water drainage networks and new tree pit attenuation zones; new boundary treatment; construction of 3 outbuildings and modifications to the existing elevations including the addition of new windows on the rear elevation and rear block; vehicular, pedestrian and cycle access to the development will be maintained via the existing access point on Airton Road. Retention is sought for minor new and altered window arrangements to the north (front) and west (side) elevations.
(a) Construction of a 4 storey nursing home building consisting of: (i) 106 bedrooms (with ensuite); (ii) associated residents welfare facilities; (iii) administration areas and staff facilities; (iv) multi-function space and pharmacy proposed at ground level; (b) construction of 60 one bed independent living units in 3 blocks as follows: (1) Block A, a 4 storey building comprising 11 one-bed units; (2) Block B, a part 4/part 5 storey building comprising 35 one-bed units; and (3) Block C, a 5 storey building comprising 14 one-bed unit. Each unit will be provided with a private open space in the form of a balcony terrace (6sq.m.) (c) The development will include communal open space and landscaping (including new tree planting and tree retention), 30 car park spaces (including 3 limited mobility parking spaces; 3 EV parking and 1 car sharing spaces); and 52 bicycle parking spaces (d) The development will be served by a new pedestrian and vehicular access from Old Greenhills Road through existing boundary wall. Material from the removed wall will be repurposed within the landscape areas; and (e) The development includes landscaping, boundary treatments (including wells and railings to southern and western boundaries), and ESB Substation SuDs drainage, road infrastructure and all ancillary site works necessary to facilitate the development.
(a) Construction of a 5 storey nursing home building consisting of (i) 112 bedroom (with en-suite); (ii) associated resident's welfare facilities; (iii) administration areas and staff facilities; (iv) with day centre, and pharmacy proposed at ground floor level; (b) construction of a part 5/part 6 storey building consisting of (i) 108 one-bedroom/two-person independent living units for older people; (ii) social and activity areas; (iii) management office and (iv) 5 guest bedrooms, each unit will be provided with private open space in the form of a balcony/terrace (ranging from 5sq.m to 12sq.m); (c) communal open space and landscaping (including new tree planting and tree retention), 30 car parking spaces and 86 bicycle parking spaces; (d) the development will be served by a new pedestrian and vehicular access from Old Greenhills Road through existing boundary wall; (e) landscaping, boundary treatments (including walls and railings to southern and western boundaries), an ESB Substation, SuDS drainage; road infrastructure and all ancillary site works necessary to facilitate the development.
Alterations to nursing home element previously approved under Reg. Ref. SD22A/0035 comprising: (i) The omission of the permitted nursing home pharmacy unit and internal void spaces to facilitate the inclusion of additional staff and IT facilities; (ii) revision of staff accommodation including additional office space; (iii) provision of Quiet Rooms on all floors; (iv) revisions to lift locations; (v) the provision of an external bin store; (vi) the 4-storey extension to the western and northern wings of the Nursing Home Building to facilitate: (a) additional staircase; (b) laundry rooms; (c) bulk storage room; (d) increase in bedroom quantum from 106 to 120 (including bariatric standard bedrooms with ensuite accommodation on all upper floors); and (e) the relocation of plant room; (vii) the addition of 2 no. EV parking spaces in lieu of 2 no. standard car parking spaces to bring the total number to 5 no. EV points (the total number of car parking spaces remains as permitted at 24 no. spaces); (viii) the increase in bicycle parking provision to 20 no. spaces to serve the nursing home; (ix) amendments to windows/glazing to correspond with internal modifications; (x) all site works and landscaping necessary to facilitate the development. No works are proposed in relation to the approved Independent Living Units.
Install additional antennae on top of the existing 40-meter high telecommunications monopole structure to include all ancillary equipment (total height not to exceed 44 meters to the top of the antennae) on behalf of the commission for communications regulation (ComReg). To include associated ground mounted equipment.
Extension of an existing telecommunications lattice tower (providing new overall height of 31.5 metres) carrying existing antennas, dishes and associated equipment and additional new antennas, dishes and associated equipment together with new ground equipment cabinets, new fencing and all associated site development works.
Installation of new railing to front of building including pedestrian gate; installation of new access control system to car park; 2 new standalone illuminated identity signs; revisions to landscaping and associated site development and facilitating works.
Demolition of the existing industrial buildings on site (4,800sq.m) and the construction of 2 blocks comprising: 328 apartments (93 1-bed, 222 2-bed and 13 3-bed), ancillary residential support facilities and commercial floorspace measuring 31,147sq.m gross floor space above a single basement level measuring 5,861sq.m. Block A is a part-5 to part-7 storey (13,710sq.m) over basement block comprising 149 apartments with office space (222sq.m). Block B is a part-6 to part-9 storey (17,437sq.m) over basement block comprising 179 apartments, 2 double-height retail/commercial (Class 1/Class 2) units (354sq.m), a café/restaurant (313sq.m), a creche (360sq.m), internal residents amenity area (644sq.m) at ground floor including reception (37.7sq.m), residents lounge (91.3sq.m), private dining area (52.6sq.m), co-working space (45.5sq.m), games room (47.3sq.m), gym (80sq.m) and communal lounge (220sq.m) at 6th floor level. The development also consists of the provision of a landscaped courtyard; public plaza at the corner of Airton and Belgard Road; pedestrian access from Airton Road to the Technological University campus; balconies; landscaped roof terrace at 6th floor level (7th Storey) of Block B (671sq.m); 184 car parking spaces at basement level including 14 club car spaces, 10 disabled parking spaces and 4 creche parking spaces; 727 basement and surface bicycle parking spaces; 4 motorbike parking spaces; bin storage; boundary treatments; green roofs; hard and soft landscaping; plant; lighting; Vodafone cabin sub-station; ESB sub-stations, switch rooms and generators; and all other associated site works above and below ground.
Mabelground Limited intend to apply for retention permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.19 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. Retention permission is sought for the following modifications: The amalgamation of 2 No. retail/commercial units (178.5 sq m and 175.4 sq m) to create one larger unit, and the relocation of the ESB substation and switch room from the southern boundary into the retail/commercial floorspace (total retail/commercial unit floorspace is 310 sq m); shell and core provided to the permitted creche (fit-out subject to tenant requirements); modifications to the height of the scheme including a minor increase to the finished floor levels, minor adjustment to the parapet heights including a slight increase of one section of roof by 125mm in Block B, minor increase in the height of the roof level amenity space by 500mm, and increase in the height of a staircore by 2.3 metres at roof level; revised roof design layout including an amended PV panel layout, increased green roof provision from 2,490 sq m to 2,576 sq m (increase of 86 sq m), reduction in plant, and provision of railings to the roof terrace amenity space; removal of the second private terrace accessed from bedroom No. 3 of Unit No. AG.105; removal of en-suite bathrooms from Unit Nos. B1.302, B1.303, B1.307, B2.301, B2.302, B2.303, B2.307, B3.301, B3.302, B3.307, B4.301, B4.302, B4.307, B5.301, B5.302 and B5.307; removal of stairs leading from the surface level courtyard to the basement; modifications to the landscaping strategy for fire safety including the addition of ventilation for the basement and adjustments to the landscaping layout at surface level; elevational changes including amendments to the material finishes, and provision of additional fire escapes on the western elevation; minor internal design changes including the provision of a metering room in lieu of 9 sq m of creche floor area, reconfiguration of staircores, reconfiguration of the refuse store, bicycle parking and disabled parking at basement level, and the provision of an attenuation tank at basement level; and all associated development works above and below ground.
Mabelground Limited intend to apply for permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.2 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. The proposed amendments comprise revisions to the permitted site entrance from Airton Road to the north including the provision of a new island and dished kerbs.
Permission for an original historic mural on the gable wall of John O'Leary's Solicitors
An original historic mural on gable wall facing the Old Bawn Road. The mural has been funded by SDCC Arts Department in their 2022 Scheme.
Amendments to south elevation to Airton Road to include new entrance porch, new fenestration, and new corporate logo / signage construction of extension to include meeting room and canteen covered seating area in internal courtyard with ancillary site works.
Amendments to the east elevation comprising of the enclosing wind break wall cladding to the existing covered yard area. Cladding to match existing and to be no more than 4.5 metres in height all with ancillary site works.
Internal alterations to the existing office at first floor level and a change of use of the 2 existing ground floor retail units at the rear of the property into a single licensed restaurant premises; comprising of external alterations to the rear elevation including new restaurant and office signage and shop frontage, replacement of all opes, 3 restaurant entrances - 1 at Old Bawn Road and 2 at Courthouse Square; 1 office entry (existing) at Courthouse Square; use of external paved area onto Courthouse Square as restaurant seating, bicycle parking facilities; internal alterations include the removal of existing stairways; removal of existing retail unit dividing wall; removal of existing internal partitions to first floor provision of restaurant customer and staff sanitary facilities and services at first floor level; provision of office sanitary facilities and services at first floor level; following a recently approved planning application for alterations to the Old Bawn Road elevation including a new shopfront and provision of a single office premises at ground floor level, Reg. Ref. SD19A/0013.
Change of use of 2 existing ground floor retail units to a Day Service Centre; new internal partitions to accommodate meeting rooms; open plan learning spaces and toilet and staff facilities; external works comprise replacement of the existing shopfront at ground floor level incorporating new windows, doors, fascia and signage.
Change of use from existing office use to a two bedroom residential dwelling house.
Change of use from a Bookmakers (from last used) to a community -based Resource Centre/Wellness Centre to be operated by Dublin Vineyard CLG. Internal alterations and modifications, including removal of internal walls and part levelling of floors to assist with achieving universal access. New hardwood sign fitted to the existing signage frame. Replacement of the two external doors to the street with new painted hardwood doors.
Change of use of existing bookmakers to a café; opening hours Mon - Fri 8:00am - 12:00am, Sat - Sun 12:00pm - 12:00am including raising the height of the front entrance door.
Infill two storey house and all associated site works.
Change of use from office to medical/dentist use with revisions to front elevation.
(1) Rear extension consisting of a store on the ground floor, a surgery and autoclave room on the first floor; (2) replacement of existing (old) roof slate tiles with matching new slate tiles of a semi-detached 'Protected Structure'.
The sub-division of a vacant commercial/retail unit measuring 309.4 sq.m m; the change of use of Unit No. 2 to an education/day centre use (142.3 sq.m m); and associated signage.
Change of use of existing open plan 997sq.m shell and core retail unit to the use as a spa/recreational facility to include swimming pool area; relaxation areas; treatment rooms; associated office/administration areas; changing facilities; internal dining/restaurant area; associated kitchen facilities; plant areas; associated ducting/extraction vents with associated elevational changes; connections to all services and site development works; new internal mezzanine floor to provide additional 602sq.m at new first floor level and on-street bicycle parking outside the building for 18 bicycles at the corner of Abberley Square and Abberley Square East.
Alterations to previously approved design (Reg.Ref:SD25A/0001W) comprising modified internal apartment layouts, additional window/door ope to terraces in Apts 1 & 2, fenestration alternations to southern and eastern facades, additional floor area to Apt. 4 to northern elevation, additional of 2 no. AOV's to roof level and all associated site works.
Change of use of a vacant unit to four one bedroomed apartments.
The demolition of three existing apartment units (c. 239sq.m) and bin store (c.18sq.m) and the construction of a residential development arranged in two building blocks (Block A & Block B) ranging from 3 to 6 storeys in height over basement level (c. 3,728sq.m, including basement). Block A comprises 11 residential apartments (c. 1256sq.m) in a 5 to 6 storey building and including a ground floor level cafe (c. 93sq.m) at the buildings south eastern corner; Block B comprises 15 residential apartments (c.1393sq.m) in a 3 to 5 storey building; The proposed development will comprise 26 new residential units (5 studio apartments, 6 1-bedroom apartments, 7 2-bedroom apartments & 8 3-bedroom apartments) with associated balconies and terraces. The proposed development will comprise a total of 40 apartment units derived from 26 new apartments and 14 existing apartments; relocation of existing basement access on Old Greenhills Road and the upgrade and extension of the existing basement level; provision of internal footpaths; landscaped communal open space (including outdoor gym equipment, children's play area and 'working from home' area); public open space; 13 car parking spaces and 74 long-stay bicycle parking spaces and 1 motorcycle parking spaces at basement level; 2 shared car parking spaces and 20 short-stay bicycle parking spaces at surface level (15 car parking spaces, 94 cycle parking spaces and 1 motorcycle parking in total); all piped infrastructure and ducting; elevation treatments; plant room; lift access and stair cores; hard and soft landscaping and boundary treatments; changes in level; waste management areas; attenuation tank; backup generator; solar photovoltaic panels; lighting; and all associated site development and excavation works above and below ground. The subject site is currently partly developed with an existing residential scheme known as Greenhill's Court comprising 17 apartment units in 4 apartment blocks ranging in height from 2 to 4 storeys, including basement car park all on a site of approximately 0.23ha. on lands bounded to the north by St Basil's Training Centre, to the east by Greenhills Road, to the west by Old Greenhills Road, and to the southeastern corner by Main Street, Tallaght, Dublin 24
2 number signs (1 main fascia sign & 1 menu sign) to the front elevation of the oriental take away business
Permission for retention of 2 no signs (main sign & menu sign) to the front elevation of the oriental take away business.
On a site bound by Belgard Road (R113) to the east, Belgard Square North to the North, Belgard Square East to the west and Clarity House to the south, demolition of all existing structures on site (with a combined gross floor area of c. 3625sq.m); The construction of a mixed-use residential development set out in 3 blocks including a podium over a basement, ranging in height from 2 to 13 storeys (with core access above to roof terrace), comprising 334 residential units of which 118 will be Build to Rent (BTR) residential units, with associated amenities and facilities across the development; 4 retail/café/restaurant units and 3 commercial spaces associated with the 3 live-work units (723sq.m combined); Childcare facility (144sq.m); 670 bicycle parking spaces including 186 visitor spaces; 117 car parking spaces (including 6 disabled spaces) are provided at ground floor and basement level; Communal space in the form of residential courtyards and roof terraces; Public open space provision including Homezone/tertiary route along the south of the site between Belgard Rd and Belgard Square East; The overall development has a Gross Floor Area of 29,784 sq.m; Of the total 334 residential units proposed, unit types comprise Block A (Build-to-Rent), 91 one bed units; 1 two bed 3 person units; 26 two bed 4 person units; Blocks B & C, 2 live-work studio units; 102 one bed units; 12 two bed 3 person units; 88 two bed 4 person units including 5 duplex units; 1 two bed 4 person live-work unit; 11 three bed units; A portion of the proposed residential development is a 'Build to Rent' scheme in accordance with Specific Planning Policy 7 and 8 as set out in the 'Sustainable Urban Housing: Design Standards for New Apartments (December 2020); All associated works, plant, services, utilities, telecommunications infrastructure, PV panels and site hoarding during construction; A Natura Impact Statement has been prepared in respect of the proposed development and accompanies this application; The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan or local area plan; The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in Section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.
Ground floor rear extension with flat roof over & 3 no. roof lights over
The development will consist of (a) the removal of the existing fascia signage, (b) the installation of green powder coated aluminium cladding panels overlaid on the existing shopfront, (c) the installation of a new double glazed Crittall framed glazing and entrance door complete with repairs to the shopfront, (d) the installation of new internally illuminated fascia signage, (e) the installation of a new internally illuminated projecting sign and (f) all associated site works.
A) Alterations to existing south elevation including removal of window, widening of existing window opening, installation of new entrance door and glazed screen; b) Reconfiguration of existing ramp and steps; c) Relocation of existing ATM and canopy from south elevation to the west elevation including new stone surround to match existing; d) Alterations to existing signage to include relocation of existing sign over entrance to over new entrance and relocation of existing projecting sign to new position on south elevation.
Demolition of existing factory/warehouse buildings on site (total floor area c. 10,076.8sq.m). Construction of 502 apartments (comprising 197 1-bed; 257 2-bed; and 48 3-bed units) within 6 blocks ranging in height from 4 to 8 storeys. All residential units provided with associated private balconies/terraces to the north/south/east/west elevations. Provision of residential amenity facilities, 3 retail units, creche and services/bin store areas (total non-residential floor area c.1,839sq.m). A total of 202 car parking spaces (at basement and undercroft levels) and 584 no. bicycle parking spaces. Vehicular/pedestrian/cyclist accesses from Greenhills Road and Airton Road. Provision of road improvements and pedestrian crossings. All associated site development works, open space, landscaping, boundary treatments, plant areas, pv panels (at roof level), waste management areas, and services provision (including ESB substations).
Demolition of existing factory/warehouse buildings on site (total floor area c. 10,076.8sq.m). Construction of 502 apartments (comprising 197 1-bed; 257 2-bed; and 48 3-bed units) within 6 blocks ranging in height from 4 to 8 storeys. All residential units provided with associated private balconies/terraces to the north/south/east/west elevations. Provision of residential amenity facilities, 3 retail units, creche and services/bin store areas (total non-residential floor area c.1,839sq.m). A total of 202 car parking spaces (at basement and undercroft levels) and 584 no. bicycle parking spaces. Vehicular/pedestrian/cyclist accesses from Greenhills Road and Airton Road. Provision of road improvements and pedestrian crossings. All associated site development works, open space, landscaping, boundary treatments, plant areas, pv panels (at roof level), waste management areas, and services provision (including ESB substations).
(i) Demolition of existing single storey ESB substation (3.5sq.m) on the north western site boundary; (ii) South building ranging from 5 storeys to 8 storeys (max. height c.26.40m) with a total gross floor area of 2663sq.m comprising; (a) 28 residential units comprising 17 1-bedroom apartments, 10 2-bedroom apartments and 1 3-bedroom apartment; (b) At ground floor and with frontage onto Main Road, 3 commercial units to facilitate a range of uses: Unit B (73sq.m) - Class 1, shop (newsagent, parcel delivery drop store) or Class 10 (Community Centre); Unit C (49sq.m) - Class 1 shop (cycle store/Charity Shop); Unit D (74sq.m) - Class 1, shop, Class 2 (financial/professional services) or Class 8 (Healthcare); (c) Also at ground floor, a management office (17sq.m), a maintenance office (12.5sq.m), ESB substation and switch room (combined 22sq.m) and commercial bin storage area (12.5sq.m); (iii) West building ranging from 4 storeys to 5 storeys (max. height c.16.07m) with a total gross floor area of 1441sq.m comprising (a) 15 residential units including 4 studio units; 5 1-bedroom units, 3 2-bedroom units and 3 3-bedroom units; (b) tenant amenity floorspace (42sq.m) at ground floor;(c) 1 92sq.m commercial unit (Cafe/restaurant/Deli) at the corner of Old Greenhills Road and Main Road; (iv) A communal amenity courtyard (459sq.m) and public open space in the form of a new civic plaza (337sq.m) at the corner of Old Greenhills Road and Main Road and public realm improvements at the southern end of Old Greenhills Road including improvement works to the Katherine Tynan memorial (505sq.m); (v) A basement (1298sq.m) incorporating 25 residents car parking spaces (including 4 Go-Car spaces, 2 electric vehicles spaces and 2 accessible spaces), residents long stay cycle parking (50 spaces) and residents waste management facilities (49sq.m); (vi) A new vehicular entrance from the Old Greenhills Road to the proposed basement; (vii) A total of 24 surface level short stay cycle parking spaces comprising 4 spaces at the Katherine Tynan Memorial, 8 spaces within the residents communal courtyard and 12 spaces at the new civic plaza; (viii) Removal of 2 on-street car parking spaces on Old Greenhills Road to facilitate access to the proposed basement and installation of a raised pedestrian crossing at the southern end of Old Greenhills Road and (ix) All ancillary site development works including installation of drainage and water supply infrastructure, installation of rooftop solar photovoltaics panels (128sq.m) and lighting.
Retention of Veterinary Centre use in Unit 14 and change of use from shop to Veterinary Centre in Unit 15.
Carry out external works for the removal of an ATM, to be infilled with panelling to match the existing; The removal of the night safe front plate, replacing with a blank steel plate, as well as the removal of the Ulster Bank raised lettering shop signs and the removal of the Ulster Bank general blue signage; Carry out internal works for the removal of the ATM's in stud walls, as well as the removal of loose furniture and the removal of Ulster Bank signage and merchandise on all floors.