Planning records
Showing 1-2 of 2 public recordsFor the demolition of an existing non-habitable single-storey house, floor area 54m2, the provision of 4 no. commercial units with a total combined area of 683m2 and 41 residential units all contained in 2 separate blocks of accommodation consisting of: (1) A part 3-storey part 4-storey block with 2 no. commercial units at ground floor level (Unit 1: 218m2 + Unit 2: 145m2) and 13 no. dwelling units comprising 2 no 1-bed units, 9 no. 2-bed units & 2 no. 3-bed units. (2) A 4-storey block with 2 no. commercial units at ground floor level (Unit 3: 145m2 + Unit 4: 175m2) and 28 no. dwelling units comprising 10 no. 1-bed units & 18 no. 2-bed units. The development shall also include 65 no. car parking spaces provided at lower ground floor level with access via proposed upgrade of existing vehicular access from An tSráid Mhor, to include new signal controls, road markings and pedestrian crossings. Proposed boundary treatment to include new retaining works and alterations to the existing stone wall on Main Street, hard and soft landscaping works, water supply and drainage installations including diversion of existing foul sewer
Construction of 27 dwellings (3572m2) in 6 no. blocks with ground floor retail unit of 210m2 with lower ground floor bin and bicycle store with new access road to service subject lands and existing pumping station and adjoining lands to East, North and South of applicant's lands, with realignment and widening of existing road (R772) and provision of new footpath and off street parking with the relocation of existing bus stop, with pedestrian linkage to Main Street with central courtyard space, with 36 no. surface car spaces with associated public open space, landscaping, street lighting, services and associated site works to facilitate this development