Planning records
Showing 1-4 of 4 public recordsProposed Construction Of An Oil Based Timber Preservative Treatment Plant Building With Adjoining Lean-To Structure Containing A Biomass Boiler, Which Will Be Used For The Treatment Of Timber Products Used In Conjunction With The Existing Onsite Timber Products Business And All Of Which Will Be Located Within The Confines Of The Existing EPA Licenced Area (EPA IPC Licence No; P0377-01) And All Ancillary Works
For construction of a storage unit to be used in conjunction with the existing onsite timber products business and all ancillary works
To convert existing dormer domestic garage to self-contained apartment ancillary to existing dwelling
For (a) lean-to extension to side (southwest) of existing factory incorporating offices (b) alterations to existing layout which includes the removal of first floor accommodation of office and canteen (c) demolition of ground floor workshop area which will now form part of the factory floor (d) relocation of canteen to ground floor and relocation of workshop to lean-to area on southeast elevation, (e) change of use of existing ground floor office area to retail outlet (f) alterations to plans/elevations of existing factory to include new building signage, provide new factory entrance to rear (northwest) together with RETENTION permission for 1 bay extension to existing lean-to on southeast elevation and associated site works at existing wood processing factory