to
to

Planning records

Showing 1-2 of 2 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    21885Granted

    Knockanally, Donadea, Naas

    (a) Temporary retention planning permission for mobile home; (b) Retention planning permission for an agricultural shed; (c) Retention planning permission of a 2 box plus break room, stable block; (d) Retention planning permission of a proprietary wastewater treatment system; (e) Retention planning permission for new vehicular entrance and access drive way and all associated site works; (f) Planning permission for the addition of personnel door in rear elevation (south elevation) of agricultural shed; (g) Planning permission for new polishing filter percolation area. Revised by Significant Further Information which consists of (1) the removal of the existing mobile home from the site for which retention permission is no longer sought and (2) planning permission is sought for a covered dungstead of total floor area 18sq.m.Decision record indexed
    Decision25 February 2022View record
  2. © OpenStreetMap
    20770Granted

    Hortland, Knockanally Donadea, Naas

    To amend the design of the approved development (Planning Ref: 19888) which comprises consent for permission for a period of 10 years to construct and complete a Solar PV Energy development with a total site area of 38.08 hectares, to include two electrical substation buildings, six electrical transformer and inverter station modules, solar PV panels ground mounted on support structures, vehicular access, access gates and internal access tracks, one spare parts container, security fencing, electrical cabling and ducting, CCTV cameras and other ancillary infrastructure, drainage, temporary construction compound, landscaping and habitat enhancement as required and associated site development works and services at Hortland and Knockanally, Donadea, Naas, Co. Kildare subject to 28 conditions. Amendments proposed are: Extend the operational lifespan of the consent from 30 years to 35 years. The height of the solar panels will be reduced from 2.75m to a maximum 2.25m, with a reconfigured layout also now being incorporated; Although the height of the panels will decrease the solar modular rating and size will increase which will ultimately reduce the number of modules to be installedDecision record indexed
    Decision09 September 2020View record
Showing 1-2 of 2
PreviousPage 1 of 1Next