Planning records

Showing 1-5 of 5 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    25/6957Granted

    Lands at Knockgriffin (Imokilly), Knockgriffin (Barrymore), and Water Rock, Midleton, Co. Cork.

    Permission for amendments to part of the development previously permitted under planning reference 21/7265, consisting of the construction of 8 no. 2 storey, 3-bedroom terraced houses (in 2 blocks of 4 units) with in-curtilage surface car parking; as well as landscaping, boundary treatment and associated site development works necessary to facilitate the development.Decision record indexed
    Decision25 February 2026View record
  2. © OpenStreetMap
    22/5032Granted

    Lands to the west of the Mill Road and part of Mill Road, The Owenacurra River,and the Northern Relief Road, townlands Townparks, Broomfield West & Knockgriffin (Imokilly), Midleton, Co. Cork.

    The Midleton North Wastewater Pumping Station and Network, which will consist of: 1) a new wastewater pumping station with below ground wet well and chambers, 2 no. above ground kiosks, vent stack (c.6.2m in height), telemetry pole (c. 6m in height), boundary fencing, retaining wall, and modifications to an existing entrance from Mill Road, including new gates, to facilitate vehicular and pedestrian access; (2) the construction of a below ground pipeline (c. 650m long) connecting the proposed wastewater pumping station to the previously approved Water-Rock Pumping Station (consented as per Section 179 of the Planning and Development Act, 2000, as amended (Water-Rock UEA Infrastructure Works); (3) the construction of c. 30m of an underground pipeline to connect the existing foul network on the mill road to the proposed foul pumping station; and (4) all associated site development, landscaping and site excavation works above and below ground, including the demolition of the existing boundary wall, fence and gates along the mill road, on lands to the west of Mill Road, and part of Mill Road, the Owenacurra River, and the northern Relief Road, in the townlands of Townparks, Broomfield West, and Knockgriffin (imokilly) Midleton, Co. Cork. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application.Decision record indexed
    Decision13 February 2023View record
  3. © OpenStreetMap
    21/7264Granted

    Lands at Knockgriffin (Imokilly) and Water Rock Midleton Co.Cork

    We, EMR Projects Ltd, intend to apply for permission for development at this site (6.7 ha) on existing greenfield lands at Knockgriffin (Imokilly) and Water Rock, Midleton, Co. Cork. The application site is bounded by existing fields in agricultural use to the north, the Nordic Enterprise Park to the east, the Cork to Midleton rail line to the south and two dwelling houses to the west accessed via Castle Rock Avenue. The development will consist of the demolition and removal of existing derelict buildings, structures, outbuildings and hardstanding (total 842sq.m) and the construction of a mixed-use scheme comprising 284no. residential units, a Childcare Facility, a Retail unit, a Café unit, a Medical clinic, Office units and all associated ancillary accommodation, site and development works. The residential units will contain 214no. apartment/duplex units comprising 138no. one-bedroom units, 64no. two-bedroom units and 12no. three-bedroom units and 70 no. houses comprising 13no. two-bedroom dwellings, 53no. three-bedroom dwellings, and 4no. four-bedroom dwellings. The total gross floorspace (GFA) of the overall development is 38,945sq.m of which 31,420sq.m is residential (including 4,070sq.m undercroft car park for Block C and Block D) and 7,525sq.m is non-residential. The development is described below on a block by block basis as follows: Block A (1,237sq.m GFA): 5 storey apartment building consisting of 14no. apartment units comprising 6no. one-bedroom units and 8 no. two-bedroom units with ancillary accommodation, associated private balconies, communal open space (183sq.m) at ground floor level, 15no. car parking spaces, 3no. visitor car parking spaces, 22no. secure and covered cycle parking spaces in a designated bike store (18sq.m) located externally at ground floor level and 8no. visitor cycle parking spaces and associated communal bin stores (9sq.m). Block B (1,237sq.m GFA): 5 storey apartment building consisting of 14 no. apartment units comprising 6 no. one-bedroom units and 8 no. two-bedroom units with ancillary accommodation, associated private balconies, communal open space (178sq.m) at ground floor level, 16no. car parking spaces, 3no. visitor car parking spaces, 22 no. secure and covered cycle parking spaces in a designated bike store (18sq.m) located externally at ground floor level and 8no. visitor cycle parking spaces and associated communal bin stores (9sq.m). Block C (9,585sq.m GFA): 6 storey apartment building consisting of 100no. IndeDecision record indexed
    Decision13 September 2022View record
  4. © OpenStreetMap
    21/7265Granted

    Knockgriffin (Imokilly), Knockgriffin (Barrymore) Water Rock, Midleton Co. Cork

    We, Dawn Meats Ireland, intend to apply for permission for development at this site (10.8 ha) on existing greenfield/brownfield lands at Knockgriffin (Imokilly), Knockgriffin (Barrymore) and Water Rock, Midleton, Co. Cork. The application site is bounded by existing fields in agricultural use to the north, the Nordic Enterprise Park to the south and east, the Cork to Midleton rail line to the south, and further agricultural lands to the west. The development will consist of the demolition and removal of existing derelict buildings, structures, outbuildings and hardstanding (total 1661sq.m) and the construction of a mixed-use scheme comprising 434no. residential units, a childcare facility, a Research and Development building, a Neighbourhood Centre, a 90-bed Nursing Home and all associated ancillary accommodation, site and development works. The residential element of the development will contain 281no. apartments/duplex units comprising 128no. one-bedroom units, 149no. two-bedroom units, and 4no. three-bedroom units. The proposed scheme also involves the construction of 153no. dwellinghouses comprising 17no. two-bedroom dwellings, 127no. three-bedroom dwellings, 2no. four-bedroom dwellings and 7no. five-bedroom dwellings. The total gross floor area (GFA) of the overall development is 54,428sq.m of which 44,606sq.m is residential (including 3,080sq.m of undercroft car park) and 9,822sq.m is non-residential. The development is described below on a block by block basis as follows:.Block A (5448sq.m GFA): 7 storey apartment building consisting of 63no. apartment units comprising 27no. one-bedroom units, and 36no. two-bedroom units with ancillary accommodation, associated private balconies, shared landscaped communal open space (1869sq.m in total) with the neighbouring Apartment Block B above undercroft car park, 54no. car parking spaces located within the undercroft car park, 108no. secure cycle parking spaces, 34no. visitor cycle parking spaces and associated communal bin store (32.5sq.m), communications room (12 sq.m), switch room (12 sq.m) and metre room (20sq.m);.Block B (3449sq.m GFA): 6 storey apartment building consisting of 34no. apartment units comprising 5no. one-bedroom units and 29no. two-bedroom units with ancillary accommodation, associated private balconies, shared landscaped communal open space (1869sq.m in total) with the neighbouring Apartment Block A above undercroft car park, 43no. car parking spaces located within the undercroft car park, 68no. secure cycle parking spaces, 20no. visitor cycle parking spaces and associated communal bin stores (78.5sq.m in total), communications room (18sq.m), metre room (32.5sq.m) and plant room (17.5sq.m)..Block C (3676sq.m GFA): 6 storey apartment building consisting of 41no. assisted living units comprising 28no. one-bedroom units and 13no. two-bedroom units with ancillary accommodation, associated private balconies, communal open space (375sq.m) above undercroft car park, 17no. car parking spaces located within the undercroft, 60no. secure cycle parking spaces, 24no. visitor cycle parking spaces, and associated communal bin store (15sq.m), switch room (14sq.m), sub station (28sq.m), metre room (20.5sq.m) and plant room (29sq.m). Block C also includes the provision of a childcare facility (408sq.m) with associated external secure and designated play space (100sq.m) with direct access located above the undercroft car park and the provision of 11no. car parking and 16 cycle parking spaces at grade..Block D (1533sq.m GFA): 6 storey apartment building consisting 17no. apartment units comprising 6no. one-bedroom units, 10no. two-bedroom units and 1no. three-bedroom unit with ancillary accommodation, associated private balconies, communal open space (149sq.m) at surface level, 21no. car parking spaces at grade, 33no. secure cycle parking spaces in 2no. designated cycle stores (36sq.m in total), 10no. visitor cycle parking spaces and associated communal bin store (9sq.m) anDecision record indexed
    Decision12 September 2022View record
  5. © OpenStreetMap
    19/5870Granted

    Knockgriffin (Imokilly) Midleton Co. Cork

    A service station development and new access road to the existing industrial complex (Phases 1 & 2 of a 3-phase masterplan development of subject lands). The proposed development includes (1) Phase 1 – provision of new access road to service existing industrial estates and relocation of existing ESB substation; (2) Phase 2 – construction of new two-storey forecourt building with 100sq.m retail shop, 76.51sq.m restaurant food prep area with 5.35sq.m drive-thru facility, 30.28sq.m deli food prep area, 112.26sq.m seating area including 7.32sq.m barista unit, plus offices, stores & toilet facilities at ground and first floor levels; (3) construction of forecourt layout including 4no. fuel pumps and canopy over to service cars and LCV’s, separated 1no. hi-speed fuel pump and canopy over to service HGV’s (with dedicated access lane) and 4 no. underground fuel storage tanks, (4) sale of specially prepared hot & cold food for consumption both on and off the premises from the restaurant/drive thru/deli food areas of forecourt building; (5) ancillary signage for development, both illuminated and non-illuminated; (6) all associated site works including bin compound and (7) boundary adjustments to tie in with council proposed services corridor link road. Phase 3 of the masterplan development will be subject of a separate planning application.Decision record indexed
    Decision15 September 2020View record
Showing 1-5 of 5
PreviousPage 1 of 1Next