Planning records

Showing 1-4 of 4 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    25/6052Granted

    Dereenacreenig West Wind Farm Ltd., Dreenacreenig West, Drimoleague, Co. Cork

    Permission for a windfarm development at this site within the townland of Derrenacrinnig West. The proposed Grid Connection traverses the townlands of Derreenacrinnig West, Barnagowlane West, Glanareagh, Gortnacowly, Ards Beg, Ardrah, Laharanshermeen, Maulraha, Maulikeeve, Derryarkane, Cappanaboul, Skahanagh, Gortroe, Shandrum Beg, Shandrum More, Dromloughlin, Ballylickey, Crossoge. Temporary works will be required to accommodate the delivery of the turbine components. These temporary works are included as part of this application and are located in the townlands of Castledonovan, Derreenacrinnig East, and Derreenacrinnig West. The development will consist of: Construction of 3 no. wind turbines with an overall ground to blade tip height of 119.3m with a rotor diameter of 82m and a hub height of 78.3m. Construction of 1 no. permanent 20 kV Electrical Substation, all associated electrical plant and equipment, all associated underground cabling, and all ancillary structures and works. Construction of one Temporary Construction Compound with associated temporary site offices, parking areas and security fencing. Upgrade and reuse of existing hardstands. Upgrade and reuse of existing internal site access roads. Provision of Biodiversity Enhancement Area. All associated underground electrical and communications cabling connecting the wind turbines to the wind farm Electrical Substation. Construction of approximately 10.75 km of 20kV overhead line (OHL) Grid Connection, the OHL to be constructed consists of c. 157 wood poles (ranging from 9m to 15m above ground) supporting electrical conductor lines and ancillary structures and equipment. Installation of approximately 3.3km of underground cable ducting Grid Connection and associated electrical cabling, and all other ancillary works including joint bays, culverts, marker posts and all associated developments. Construction Haul Route works along the L-8767, L-4711 and L-8765. A 10 year permission and a 40 year operational period from the date of overall commissioning of the entire wind farm is being sought. However, part of the substation and all of the Grid Connection will be owned and operated by ESB networks and as part of the national grid infrastructure, their life can extend beyond the life of the windfarm. Accordingly, permission is sought for the Grid Connection and substation in perpetuity. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413). This planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. apply. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted with the application. The planning application and EIAR may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority, Norton House, Cork Road, Skibbereen, Co. Cork. P81AT28 during its public opening hours, I.e. 9.00am to 4.00 p.m. Monday to Friday (excluding public holidays). A submission or observation in relation to the application and EIAR may be made in writing to the Planning Authority on payment of the prescribed fee, €20, within the period of 5 weeks, beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission.Decision record indexed
    Decision14 April 2026View record
  2. © OpenStreetMap
    24/228Granted

    Laharanshermeen Bantry Co. Cork

    Permission for the retention of rear, side, and front extensions to dwellingDecision record indexed
    Decision21 June 2024View record
  3. © OpenStreetMap
    21/737Granted

    Derreenacrinnig West, Barnagowlane West, Glanareag Ards Beg, Ardrah, Laharanshermeen, Maulraha, Maulikeeve, Derryarkane, Cappanaboul, Skahanagh, Gortroe, Shandrum Beg, Shandrum More, D

    Development will consist of; The application will seek permission to remove the existing grid connection works and for the development of the full length of a new grid connection over a distance of approximately 14.8km, between the existing Ballylicky ESB substation and the permitted Derreenacrinnig West Windfarm. The proposed development involves the following works: (a) removal of approximately 9.5 km of 20 kV overhead line (OHL) along the route, the OHL to be removed consists of 138 wood poles (ranging from 9m to 12.5m above ground), supporting electrical conductor lines and ancillary structures and equipment (b) following removal of the OHL, it is proposed to construct approximately 10.8 km of 20 kV overhead line (OHL) along the route, the OHL to be constructed consists of c. 157 wood poles (ranging from 9m to 12.5m above ground), supporting electrical conductor lines and ancillary structures and equipment. (c) installation of approximately 4 km of underground cable ducting and associated electrical cabling, and all other ancillary works including joint bays, culverts, marker posts and all associated developments. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the planning authority with the application.Decision record indexed
    Decision18 October 2022View record
  4. © OpenStreetMap
    21/560Granted

    Laharanshermeen Bantry Co Cork

    (i) Installation of 6 no. camping pods, (ii) construction of a service building, (iii) installation of waste water treatment system and (iv) all associated site worksDecision record indexed
    Decision20 April 2022View record