to
to

Planning records

Showing 1-3 of 3 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    25/5103Granted

    Boherbue Comprehensive School Laharan East and West Boherbue Mallow Co.Cork

    Permission for:- 1) Construction of 2 no. connecting single-storey extensions to the existing school, consisting of an entrance space to the front (North) elevation and a construction studies room to the rear (South) elevation. 2) Construction of a standalone two-storey school building to the rear (South) of the site, containing 4 no. classrooms, library, GP/dining hall and ancillary educational spaces. 3) Demolition of an existing storage room. 4) Internal layout changes and alterations to all facades of the existing school block. 5) Together with the provision of extending the internal access road, pedestrian footpaths, modifications to entrance gateways, additional staff car parking spaces along with designated SEN and bus drop off area, including all associated ancillary site works and connections to services. Permission for Retention for: 1) External canopy structure to rear of existing school block, currently used as an external eating area and proposed to be used as an external SEN recreational space in the future.Decision record indexed
    Decision23 October 2025View record
  2. © OpenStreetMap
    24/4321Granted

    Laharan West Boherbue Co.Cork

    A) the retention of existing as built uncomplete extension to rear of existing dwelling, b) permission to complete construction of extension to the rear of existing dwelling, including a proposed first floor extension, c) renovations to existing dwelling and commercial unit, including but not limited to the demolition of existing defective roof and replace same with new and the reinstatement of new garage door to front façade in lieu of existing window to allow for vehicle access, alterations to all elevations including revised window and door locations along with all ancillary site worksDecision record indexed
    Decision17 February 2025View record
  3. © OpenStreetMap
    21/7443Granted

    Laharan West Boherbue Co.Cork

    (1)Construction of new inlet works, new storm overflow and flow splitting chamber, new aeration tanks, new settlement tanks, and cloth filter structure, new storm tank, new sludge drying reed beds, new outfall pipeline together with associated tanks, chambers, pipelines, provisions of new admin and welfare modular kiosk, upgrade to boundary treatment to include 2.4m high weld mesh fence, new internal access road, public lighting and all associated site development works (2) Construction of new admin/welfare modular building. (3) decommissioning of the existing wastewater treatment plant, equipment and associated structures as part of the upgrade works. (4) Construction of 150kW photovoltaic (PV) solar panels on ground mounted frames on the south-east area of the site. The grid connected to PV panels will be arranged in 5 no. rows with an overall panel area of 745sqm approximately. Provision of a kiosk/modular unit for associated electrical equipment. (5) All associated site development works above and below ground.Decision record indexed
    Decision23 February 2022View record
Showing 1-3 of 3
PreviousPage 1 of 1Next