LRD0057/S3E

We, Golden Port Homes Limited, intend to apply for permission for a Large-scale Residential Development on lands at Forest Road, Swords, Co. Dublin. The proposed development will consist of a total of 109 no. residential units (42 no. duplex units; 41 no. apartments; 26 no. houses) as follows: (i) 42 no. duplex units within 3-storey buildings comprising 21 No. 1 bed units at ground level and 21 No. 3 bed units over first and second floor levels with balconies/terraces, private and communal open space; (ii) 41 no. apartments within 2 blocks. Block A will be a 4 storey building with 14 no. apartments (5 no. 1 bed units and 9 no. 2 bed units) with balconies/terraces to the north, south and west elevations, and bin, bicycle parking and plant at ground floor level and pv panels at roof level; Block B will be a 5 storey building with 27 no. apartments (13 no. 1 bed and 14 no. 2 bed units) with balconies/terraces to the east and west elevations and bin, bicycle parking and plant at ground floor level and pv panels at roof level; (iii) 26 no. houses (comprising 5 no. 2 bed, 2 storey terrace houses; 6 no. 3 bed, 2 storey terrace houses; 4 No. 3 bed, 2 storey semi-detached houses; and 11 no. 4 bed, 3 storey houses); (iv) 96 no. Surface level car parking spaces and 4 no. surface level motorcycle parking spaces as well as bike parking stores and spaces; and bin stores; (v) 1 no. ESB substation; (vi) Landscaping, including the provision of new public open spaces with play areas and a MUGA; footpaths and cycle paths, new vehicular access/egress from Forest Road; public lighting; boundary treatment and all associated site, drainage and development works necessary to facilitate the proposed development.

Lands at Forest Road, Swords, Co. DublinFingal County CouncilLRD Application0 reasons0 conditions
Granted30 October 2025
SHD/022/19

An Bord Pleanála Ref ABP-308366-20. Updated reference ABP-320806-24 Closing date for submissions is 11/11/20 at 5.30 p.m. To view details of this development please vist www.fosterstownshd.ie Construction of a mixed use development ranging in height from 5 no. storeys to 9 no. storeys from street level. The development will have a total of 278 no. apartment units (125 no. 1 bedroom units, 146 no. 2 bedroom units and 7 no. 3 bedroom units), internal amenity space (218.8 sq.m), 1 no. creche facility (354.4 sq.m) and 1 no. retail unit (262 sq.m); The proposal is set out in 3 no. blocks; Each block will contain the following: Block A - ranges in height between 6-9 storeys and contains 13 no. 1 bedroom units, 45 no. 2 bedroom units and 7 no. 3 bedroom units and internal amenity space, a retail unit and a creche facility at ground floor level; Block B - ranges in height between 5-6 storeys (over basement level) containing 56 no. 1 bedroom units and 48 no. 2 bedroom units. Block C - ranges in height between 6-7 storeys in height containing 56 no. 1 bedroom units, 53 no. 2 bedroom units; The proposed development will also include the provision of public, communal and private open space including courtyard areas, terraces and balconies and playground areas; A section of the public open space consists of temporary open space which will be developmed on in future phases: Public Realm improvements including the provision of footpaths, road widening, cycle infrastructure and landscaping works to the Forest Road; Provision of a new link road from the Forest Road to provide access to the proposed development and adjoining lands. The new link road will also include a pedestrian and cycle route to the Dublin Road/R132; Parking at basement level for 104 no. cars and at surface level for 102 no. cars to serve the residential element of the proposed development. 5 no. car parking spaces will be provided at surface level to serve the creche; 214 no. bicycle parking spaces will be provided at basement level and 162 no. external spaces at ground level throughout the site; All hard and soft landscaping, boundary treatments and all associated site development works, signage, services, substations, green roofs, PV panels at roof level and plant. The application contains a statement indicating why permission should e granted for the proposed development, having regard to a consideration specified in Section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant Development Plan or Local Area Plan other than in relation to the zoning of the land. The application contains a statement setting out how the proposal will be consistent with the objectives of the Fingal County Development Plan 2017-2023.

Phase 1 lands, Townlands of Fosterstown North and Cremona, Swords, Co.Fingal County CouncilStrategic Housing Development0 reasons0 conditions
Granted03 February 2021