24/181Granted
Moneygaff West, Coppeen Co. Cork
The construction of a new production well to serve Coppeen water treatment plant. The works will include local pipeworks and a concrete pad around the existing 152mm trial well steel casing, with two small permanent kiosks placed on the concrete pad covering the well, and a 2.2m high perimeter fence around the site. The pumped water will be stored in a new tank with a total capacity of 11m3, which will be located in the area of the decommissioned spring. The tank will discharge by gravity to the water treatment plant, using existing pipeline infrastructure. The existing spring will be backfilled and sealed.Decision record indexedDecision06 June 2024View record