Planning records
Showing 1-15 of 15 public recordsSingle storey extension to the western elevation with all associate site works
A dormer extension to the side of existing dwelling and all associate site works
See site notice for full development description. Retention for 1. ESB substation and 2 no. agricultural storage and maintenance buildings 2. one mixed use for use for storage, maintenance, workshop, educational and recreational use 3. 'Pavilion' Wooden clad communal canteen/dining building and commercial kitchen. 4. Reconstruction, alterations and extension to 'Belfry' building incorporating reception, meeting room, offices, toilets, canteen, kitchen and staff facilities 5. Reconstruction, repurpose and extension of previously derelict 'long barn' to comprise 27 no bedroom units 6. Retention and completion of 1 no. two storey accommodation building to provide 51 no bedrooms together with unfinished attached self contained residential unit 7. hard standing, roads, access, carparking, set down, and recreational areas to provide play areas and outdoor seating etc. PERMISSION FOR RETENTION ON A TEMPORARY BASIS for 1. security kiosk, controlled barrier and gate lodge 2. Conversion and use of part of a mixed use admin/educational building to provide emergency residential accommodation for displaced persons
Single storey extensions (combined area 35.31m2) to 185.31m2 single storey dwelling to include a) internal modifications and extension to create an independent living unit, b) a new link corridor, c) enlargement of an existing window, d) provision of a new wastewater treatment system to replace an existing septic tank, e) all associated site works
(1) the construction of a new two storey side extension to the existing dwelling house, measuring 53 sqm and comprising of a bedroom, bathroom, sitting room, study & storage area (2) the relocation of the existing waste water percolation area associated with the existing waste water treatment system, all with associated site works
A change of house type to that previously granted under planning ref 22/1308 along with all associated site works
The development consists of alterations to the existing single storey five bedroom house, specifically, A) conversion of the attached garage (35sq.m) to two bedrooms, en-suite and the associated elevational changes; B) attic conversion to non-habitable space (54 sq.m) with 5 no. rooflights to rear of existing roof; C) ground floor utility room extension (10.5 sq.m) with 1 no. rooflight to rear; D) ground floor sun room extension (21 sq.m) to side, with 2 no. rooflights to front and 2 no. rooflights to rear; and E) associated minor site works
Dormer bungalow and garage along with an oakstown treatment plant with soil polishing filter and all associated site works
1. an all weather pitch with ancillary lighting, perimeter fencing, 2. A playground area and 3. A revised walking track along bollard lighting to that previously granted under planning ref 21/192 and all associate site works
Change of use of their land to a football field with a walking tracking along with the construction of a single storey dressing room with oakstown treatment plant and soil polishing filter and extending the existing parking area and all associated site works
Changes made to the content of the grant of planning permission under planning application reference number 5639/72 including: A) The construction of a single storey pitched roofed extension to the rear of the dwelling house. B) The enclosure of a roofed semi-open lobby to the rear of the dwelling house and the construction of a toilet off. C) The construction of a single storey pitched roofed detached garage/store to the side of the dwelling house. The developments are for uses ancillary to the use of the single family dwelling house for domestic purposes
Single storey extension to the rear of existing dwelling along with retention for a pitched roof to the side of existing dwelling along with all associated site works
Existing vehicular access along with all associated site works
Detached single storey dwelling, new recessed site entrance, on site domestic wastewater treatment system, landscaping and all associated site development works
Change of use of their land for use as a training / playing field along with construction of a hardcore parking area, a new entrance along with a temporary portacabin and portaloo toilets and all associated site works