Planning records

Showing 1-2 of 2 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    2560068Granted

    The Dingle Distillery Old Mill, Milltown Co. Kerry V92 E7YD, (also drainage connection at Ballyhea Road Commons of Milltown Dingle Co. Kerry)

    (1) Retain installed first floor area in Distillery Production Building 183m2 consisting of: staff kitchen 12.7m2, shop with tasting bar 26.9m2; visitor area 143.4m2 (2) Visitor Centre use on site and Planning Permission for (1) Partial demolition of single storey projecting elements on south side (103 sq.m.) (2) Upgrade / replacement of external cladding (including reconfiguration of openings) (3) Internal layout modifications (4) Additional 323 sq.m. at upper level (including visitor use) (5) Change of use of 59 sq.m. of lower level production area to retail (6) Change of use of 12m2 of lower level production area to open office area (7) Change of use from permitted storage (Upper Shed) 412m2 to proposed industrial use (Distilling and ancillary storage) (8) New retail area at lower level 142m2 (9) Two new (8.8m high) freestanding steel grain storage silos to front (10) Connection of sewage system to mains (to replace septic tanks) (11) Landscaping (12) Bicycle, car and bus parking provision on site and all associated site ancillary worksDecision record indexed
    Decision13 February 2026View record
  2. © OpenStreetMap
    21424Granted

    THE DINGLE DISTILLERY, OLD MILL MILLTOWN, DINGLE

    RETENTION PERMISSION TO RETAIN EXISTING DISTILLERY AND EXISTING DORMER HOUSE (TO REMAIN IN RESIDENTIAL USE) WITHIN REVISED SITE BOUNDARIES (TO OVERALL 0.6317 hA (NET) AND PERMISION TO REDEVELOP THE EXISTING DINGLE DISTILLERY, INCLUDING: DEMOLITION OF PART OF THE EXISTING DISTILLERY BUILDING (135 SQM), CONSTRUCTION OF 1,762 SQM TOTAL ADDITIONAL FLOOR AREA, CONSISTING OF: A NEW CIRCULAR, THREE STOREY LIFT AND STAIR TOWER, WITH RECEPTION, TO THE FRONT OF THE BUILDING, NEW EXTENSIONS TO THE BUILDING AT GROUND AND FIRST FLOOR LEVEL AND A NEW FIRST FLOOR AREA WITHIN THE EXISTING BUILDING, TO ACCOMMODATE: NEW FIRST FLOOR VISITOR CENTRE WITH BAR AND VIEWING BALCONY, NEW AND EXTENDED FIRST FLOOR AND GROUND FLOOR PRODUCTION, STORAGE AND PLANT AREAS, NEW GROUND FLOOR RETAIL AREA INCLUDING CHANGE OF USE OF PART OF EXISTING GROUND FLOOR AREA TO RETAIL USE, ANCILLARY OFFICE AND SANITARY FACILITIES, UPGRADING THE EXISTING BUILDING TO INCLUDE REVISED ARCHITECTURAL TREATMENT, INCLUDING ELEVATIONS, EXTERNAL FINISHES CONSISTING OF NEW GLAZING, EXTERAL CLADDING (SLATE AND NATURAL STONE) AND NEW METAL SHEET ROOF INCORPORATING NEW ROOF LIGHTS, NEW EXTERNAL SIGNAGE, REVISED ACCESS INCLUDING ADDITIONAL SERVICE ENTRANCE, EXPANDED CAR PARKING, BUS SET DOWN FACILITY AND CYCLE PARKING, RELOCATED GAS TANKS TO BE UNDER GROUND, REPOSITIONED FRONT BOUNDARY WITH NEW BOUNDARY TREATMENT, PERMISSION FOR NEW DRAINAGE INCLUDING (A) DECOMMISSIONING OF TWO SEPTIC TANKS (B) CONSTRUCTION OF NEW SURFACE WATER SYSTEM, WITH ATTENUATION AND (C)CONSTRUCTION OF NEW FOUL SEWER RISING MAIN FROM DISTILLERY TO CROSS UNDER THE MILLTOWN RIVER TO CONNECT TO PUBLIC SEWERAGE NETWORK AT BALLYHEA ROAD, COMMOMS OF MILLTOWN, DINGLE AND ALL ANCILLARY DEVELOPMENT WORKS INCLUDING LANDSCAPING, BOUNDARY TREATMENT, SERVICES LIGHTING AND ALERATIONS TO GROUND LEVELS NEAR WESTERN BOUNDARYDecision record indexed
    Decision28 October 2021View record
Showing 1-2 of 2