The conversion of an old farm outbuilding into a self contained dwelling and also for the installation of a new on-site wastewater treatment system and all associated site worksGrounds not yet categorised
The conversion of an old farm building into a self contained dwelling and also for the installation of a new on-site wastewater treatment system and all associated site worksGrounds not yet categorised
(1) Demolition of the existing shed (2) Provision of a two-storey pitched roof extension to the rear of the existing house including the provision of rooflights (3)Internal alterations to the existing house (4) Removal of the existing septic tank (5) Provision of a new septic tank and trenched percolation area to the rear of the site (6) Associated alterations to all elevationsDecision record indexed
Construction of: (1) a new dairy cow road underpass with new farm roadways, (2) a new milking parlour with dairy and dafting area, (3) a new open collecting yard with an external slatted tank, (4) a new meal bin, (5) a new pipeline to the existing geo-membrane lined slurry store, (6) a new concrete apron, (7) removal of the existing horse sand arena wooden fence, (8) removal of the existing external milk cooling tank, (9) decommission of the existing milking parlour and collecting yard, (10) removal of the existing farm entrance side walls and hedges to create wider farm entrance and for a setback of the western roadside hedge to provide sufficient sightlines on both sides, (11) all associated site development worksGrounds not yet categorised
Construction of: (1) a new dairy cow road underpass with soiled water sump tank with new farm roadways, (2) a new milking parlour with dairy, drafting area and covered collecting yard with an internal precast concrete slatted channel, (3) a new underground precast concrete covered channel connected to the existing channel to discharge slurry to the existing geo-membrane lined slurry store, (4) a new meal bin, (5) a new concrete apron, (6) removal of the existing horse sand arena wooden fence, (7) removal of the existing external milk cooling tank, (8) decommission of the existing milking parlour and collecting yard, (9) removal of the existing farm entrance side walls and hedges to create wider farm entrance and for a setback of the western roadside hedge to provide sufficient sightlines on both sides, and (10) retention permission for the existing geo-membrane lined slurry store (11) and all associated site development worksDecision record indexed
A dormer bungalow with onsite waste-water treatment and percolation area including driveway, bore well, improvements to existing entrance, landscaping and boundary treatment and ancillary worksGrounds not yet categorised
Minor alterations to previously granted house type under planning permission file ref 21/1210 - all other aspects of the previously granted permission remain unchanged i.e. garage, a new secondary treatment system and percolation area to current EPA guidelines, a new vehicular entrance off public road, well and all associated site worksDecision record indexed