to
to

Planning records

Showing 1-3 of 3 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    22534Granted

    Toomes Tullycahan Drumgoolan Muff, Drumgowna and Hoarstone, Co Louth

    10 Year Planning Permission sought for solar PV development to be developed as an extension of the solar PV development permitted under Ref. No. 21/631 on a site with a total area of c.81.37ha and comprising: 1. Formation of a new entrance off the L5154 (Drumgoolan) to provide the main entrance to the proposed PV development and associated works; 2. Solar panels on ground mounted frames over an area of c.54.51ha, 30 no. single storey electrical inverter/transformer units, a containerised switch gear unit, security fencing, CCTV system with pole mounted cameras and landscaping; 3. Underground grid connection cables connecting to the substation cable connection permitted under planning ref. no. 21/631 (and thereafter ultimately connecting to Louth(Monvallet) 275kv substation); 4. A temporary construction compound; and 5. All ancillary development works. The operational lifespan of the solar PV development will be 35 years. A Natura Impact Statement will accompany this applicationDecision record indexed
    Decision14 December 2022View record
  2. © OpenStreetMap
    211478Granted

    Toomes Carnalogue Tullycahan Monvallet, Co Louth

    Ten year permission sought for alterations and extension to the solar PV and battery energy storage system development permitted under planning ref. no. 21/631 on a site comprising two distinct parcels of land either side of L5141 with a total area of c.41.60ha comprising: 1. Omission of permitted solar panels over an area of c.1.19ha to facilitate the provision of an extension to the permitted battery storage development involving a further 54 battery storage units (each with associated containerised step-up transformer) and an associated external screen bund. 2. Increase in the area to be developed with solar panels and associated works by c.32.93ha to the east and northeast of the permitted panels. 3. The primary access to the site will be via the new entrance permitted under the granted solar farm and battery storage development (planning application ref. 21/631 refers) on the L5141. A further access will be provided at the southern end of the proposed solar farm extension on the north side of the L5141 for ongoing maintenance access purposes during operation solely to facilitate temporary construction traffic between the two land parcels, an existing field entrance on the south side of the L5141 will be upgraded and a new temporary entrance directly opposite on the L5141 will be constructed that will be decommissioned upon completion of the construction works. 4. 11 no. additional single storey electrical inverter/transformer units, additional security fencing, extension to permitted CCTV system with pole mounted cameras and landscaping. 5. The provision of two areas of agricultural land enhancement and management for increased biodiversity over c.7.48ha and 6. All associated ancillary development works. The operational lifespan of the solar PV and battery energy storage system development will be 35 years. A Natura Impact Statement will accompany this applicationDecision record indexed
    Decision26 May 2022View record
  3. © OpenStreetMap
    21631Granted

    Toomes and Monvallet, Co Louth

    Permission for a 10 year planning permission for the construction of a solar PV and battery energy storage system development on a c.42.23ha site consisting of: (1) New site entrance, internal accesses and entrances and associated site works. (2) Solar panels on ground-mounted frames over an area of c.39.98ha, 15 no. single storey electrical inverter/transformer units, security fencing, CCTV system with pole mounted cameras and landscaping. (3) An enclosed battery energy storage system compound on c. 0.758ha consisting of 48 no. battery storage units (each with associated containerised step-up transformer). 1 no. containerised control room, 1 no. containerised switch room and 1 no. containerised switch gear unit. (4) 2 no. 37kv sub-stations each with an IPP building on c.1.4887ha, one serving the solar PV development, the other serving the battery energy storage system development. (5) 2 no. grid connections to Louth (Monvallet) 275kv substation. (6) A temporary construction compound and (7) All associated ancillary development works. The operational lifespan of the solar PV and battery energy storage system development will be 35 years. A Natura Impact Statement will accompany this applicationDecision record indexed
    Decision26 August 2021View record
Showing 1-3 of 3
PreviousPage 1 of 1Next