to
to

Planning records

Showing 1-4 of 4 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    2561412Granted

    Site Adjacent to the Bundle of Sticks Roundabout, Newhall, Naas

    For a motor sales and vehicle service facility located on a greenfield site of c.1.2 ha. The site is bounded by: the Bundle of Sticks Roundabout in the northeast; the R445 to the northwest; developed land in the southwest; and Local Road L6066 in the southeast. The development will consist of the provision of a building comprising a 1 and 2 storey motor sales showroom and a vehicle service garage / workshop (all with parts store, ancillary offices, staff and customer facilities and ancillary spaces) (and associated ancillary spaces) (c. 2,707 sq m) with a single storey web display and valet bay building (c. 170 sq m), all with a total gross floor area of c. 2,877 sq m.The development also includes the following signage: Northeast elevation: 2 no. illuminated suspended fascia signs (c. 4.14 sq m each), and 1 no. illuminated logo sign (c. 3.24 sq m); Northwest elevation: 2 no. illuminated logo signs (c. 3.24 sq m each), 1 no. illuminated location sign (c. 0.61 sq m), 1 no. logo and dealer sign (c. 1.56 sq m) and 1 no. glazed entrance manifestation sign (c. 2.07 sq m); Southeast Elevation: 1 no. illuminated dealer sign and with 1 no. illuminated logo sign (c. 0.94 sqm and 2.19 sq m, respectively); 4 no. free standing signs, comprising 1 no. single-sided partially illuminated façade screen sign (30.66 sq m), 1 no. double-sided partially illuminated totem sign (c. 31.42 sq m), 2 no. double-sided illuminated totem signs (c. 10.44 sq m and c. 1.62 sq m, respectively).The development will also comprise: a canopied car wash; a gated compound with bin storage, display podiums, staff and customer vehicular parking (including EV charging); Photovoltaic (PV) panels; service bays; new and used vehicle display and demonstration areas, vehicle storage, cycle parking, and landscaping; new vehicular and pedestrian entry / egress point on Local Road L6066; public footpath and bus stop to the R445; plant and pumping station; associated site servicing (foul and surface water drainage and water supply) and service connections, which includes the provision of surface water run-off discharge connection to the existing surface water sewer in the south and provision of a wastewater rising main to existing public sewer in the northeast; SUDs measures; lighting; hard and soft landscaping provision: boundary treatments: and all other site excavation and development works above and below groundDecision record indexed
    Decision30 March 2026View record
  2. © OpenStreetMap
    2560378Granted

    Motor Park, Newhall, Naas

    For the construction of a Surface Vehicle Storage Compound and Vehicle Inspection Building, together with all associated site and landscaping worksDecision record indexed
    Decision14 August 2025View record
  3. © OpenStreetMap
    2460749Refused

    Motor Park, Newhall, Naas

    For the construction of a Vehicle Inspection Building with associated offices together with surface vehicle storage compound, all associated site and landscaping works. Revised by Significant Further Information which consists of alterations to the redline site boundary together with revisions to layout of the proposed car parkGrounds not yet categorised
    Decision10 February 2025View record
  4. © OpenStreetMap
    19664Granted

    Newhall, Naas, Co. Kildare.

    The construction of a two-storey motor sales and service facility (gross floor area of 2,460sqm) comprising two motor showrooms, service workshop, parts store and customer facilities at ground floor with, office, staff canteen and toilets at first floor and a gated compound containing bin storage area, car wash facility, a single storey 181sqm valet/web display building and 17 staff parking spaces. The development also comprises illuminated buildings signage, 28 customer parking spaces (including 3 electric vehicle charging bays), c. 124 car bays for the purposes of service parking, parts collection and display (including 2 under a canopy structure), covered cycle parking, hard and soft landscaping, lamp standards, 2 free standing illuminated signs, 1 free standing illuminated directional sign, 6 display vehicle podiums, plant, public footpath to site perimeter, wastewater rising main in public road/footpath discharging to existing wastewater gravity manhole at the Newhall Retail Park entrance roundabout and all associated site development works on a 2.75 acre site adjacent to the Bundle of Sticks roundabout,Decision record indexed
    Decision21 May 2020View record
Showing 1-4 of 4
PreviousPage 1 of 1Next