to
to

Planning records

Showing 1-2 of 2 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    2560538Granted

    Mullanstown, Ardee, County Louth

    The redevelopment of a former cottage and its change of use back to a dwellinghouse, for the construction of a single storey extension to same, for a new waste water treatment system, soil polishing filter and for associated siteworks.Decision record indexed
    Decision10 October 2025View record
  2. © OpenStreetMap
    211482Granted

    Glebe, Ardee, Co Louth

    Part 8 - Louth County Council hereby gives notice of it's intention to carry out the following development: Realignment of the N52 National Secondary Route in the townlands of Mandistown, Co Meath, Ballygowan, Bohernamoe, Townparks, Mullanstown and Glebe in County Louth, comprising the construction of a single carriageway road for a distance of 4.5km from a location 150m north of the N33/N2/R171 roundabout junction on the N2 in the townland of Glebe. The N52 realignment will typically consist of a 7.0m wide carriageway with 2 x 0.5m hard strips and a 2.5m wide verge. Where a footway/cycleway is provided, the verge will be widended to 5.0m to accommodate a 3.0m shared footway/cycleway facility on one side of the road. Ghost island junctions will be located at the L-5234 Silverhill Road staggered T junction, the L-5232 Townparks Road staggered T junction and the L-1233 Mullanstown Road T junction north, with the southern arm of the Mullanstown Road stopped up. A new multi-lane roundabout is provided at the junction with the N2 in the townland of Glebe. The L-5234 Silverhill Road is realigned for 500m and a new single lane roundabout is provided at the junction with the existing N52. South of the Silverhill Road roundabout, the existing N52 will be reclassified as a local road and stopped up south of Burley Bridge. Localised realignment of the Silverhill Road, Townparks Road and Mullanstown Road (north) is required to connect them to the proposed N52 Ardee Bypass. Two new bridge crossings, each with an approximate span of 30m are provided at the River Dee and River Garra, with monir watercourses cuverted under the proposed road. The remaining works will consist of earthworks, pavement works, attenuation features, the connecton of road/land drainage outfalls ot the new sustainable urban drainage system (SuDS) network, completion of landscaping and accommodation works, implementation of environment measures and all other ancillary works. Full plans and particulars are available at www.louthcoco.ieDecision record indexed
    Decision05 May 2022View record
Showing 1-2 of 2
PreviousPage 1 of 1Next