(1) DEMOLITION OF EXISTING SHED (2) CONSTRUCTION OF (A) EXTENSIONS TO THE SIDE AND REAR OF EXISTING DWELLING HOUSE, PROPOSED WORKS TO INCLUDE DEVELOPMENT OF AN OPEN CANOPY PORCH TO THE FRONT ELEVATION AND MINOR AMENDMENTS TO EXISTING WINDOW FENESTRATION (B) DETACHED STORAGE SHED AND ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) CONSTRUCTION OF A NEW PUMPING STATION ON THE SITE OF THE EXISTING NAVENNY PUMPING STATION TO INCLUDE NEW PUMP SUMP WET WELL CHAMBER; PROVISION OF NEW 300MM MINIMUM DIAMETER STORMWATER OVERFLOW TO DIVERT ALL OVERFLOWS TO THE BURN DAURNETT, INCLUDING STORMWATER OVERFLOW MEASUREMENT; NEW ELECTRICAL CONTROL KIOSK; EXTENSIVE SITE WORKS INCLUDING FLOOD PROTECTION MEASURES, SCREENING, NEW BOUNDARY WALL WITH RAILINGS, NEW ENTRANCE AND LANDSCAPING; DECOMMISSIONING OF EXISTING PUMPING STATION ASSETS AND A TEMPORARY WORKING AREA (2) UPSIZING OF APPROXIMATELY 300M OF RISING MAIN FROM 150MM TO 200MM INTERNAL DIAMETER ON NAVENNY STREET, STARTING IN THE ROAD APPROXIMATELY 75M NORTHWEST OF THE PUMPING STATION ENTRANCE, TO THE INTERSECTION OF NAVENNY STREET AND CHESNUT ROAD (3) APPROXIMATELY 150M OF NEW 375MM DIAMETER GRAVITY SEWER FROM THE JUNCTION OF NAVENNY STREET AND CHESNUT ROAD TO AN EXISTING MANHOLE LOCATED ON CHESNUT ROAD. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATIONDecision record indexed