Planning records
Showing 1-22 of 22 public recordsTo build a new dwelling, create a new entrance onto the public road, connect to public services and all associated site and ancillary works. A Natura Impact Statement has been prepared and will be submitted along with the planning application
The development will consist of: 1. Construction of a new 2-storey school building (1863.6 m2) incorporating 8 classrooms, general purpose room, library, offices, resource and learning rooms and associated ancillary accommodation; and a single classroom Special Education Needs Unit with associated facilities. 2. New site structures and features including retaining walls, cycle area, bin store, mechanical plant compound, hard play court, play areas, sensory garden, tiered seating areas, site furniture and child play installations. 3. New internal site pedestrian and vehicular transport layout including internal roads and turning areas, pedestrian paths, parking for 19 cars, bus and car drop off areas and right of way access points to neighbouring properties. 4. Realignment and widening of the existing north-western entrance to the site on the L1050 Ballinagaddy Road including demolition of existing boundary walls, hedgerows and gate and construction of a new set back vehicular entrance to the east of the existing entrance; with new boundary wall/fence, gates, landscaping and signage. 5. Alterations to the existing north-eastern pedestrian entrance to the site on the L1050 Ballinagaddy Road including repair/re-rendering of block walls to existing set back entrance (including shared boundary wall with Andersons Cottage, a Protected Structure) and replacement of gates. 6. Upgrading, repair and replacement of existing boundaries throughout including boundaries with neighbouring properties with rendered block walls, natural stone walls and metal fencing. 7. Site soft landscaping works throughout including demolition and removal of existing hedgerows, raising and lowering of ground, site soft landscaping including hedges, shrubbery and trees. 8. And all associated site works including site services, site lighting, subsurface attenuation tank and site hard landscaping. The total site area is 3.41 Acres. A Natura Impact Statement (NIS) will be submitted to the local authority with the Planning Application
Is sought for an external render to the front (south-west) and rear (north-east) facades of the existing two storey dwelling
To build a new house, garage, install a waste water treatment system, create a new entrance onto the public road and all associated and ancillary site works
To construct a dwelling house and garage with effluent treatment system, new entrance from public road and all associated site works
To Appropriate Period of planning permission for P19/852 (Reference No. P16-299) permission consequent on the grant of outline permission for to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all with associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road and all associated site works
To demolish existing derelict garage, construction of new detached private dwelling house, infilling existing entrance from public road to create a new entrance in new location to the public road, install a waste treatment system, and all associated site and ancillary works
Of the following: a) Retention of works to the existing farmhouse, a dry building (56.06 sq.m.) including replacement of existing slate roof with grey, powder coated corrugated aluminium roof; the installation of roof mounted solar panels and associated infrastructure as well as 2 no. rooflights, 2 no. external doors; b) Retention works to widen an existing agricultural entrance on the Ardnaculla Road from 6m to 7.4m as well as permission for upgrade works to the entrance including the provision of a new timber gate, the set back of an existing wall and as surface water drainage; c) Retention of a standalone staff welfare facilities (wooden cabin); d) retention of works to provide a car parking area as well as permission for extension of the car park; e) retention of internal access tracks to the northeast and southwest; f) The development of a new internal access track running north-south across the site; g) Temporary Retention of 1 no. composting toilet; h) Retention of volunteer accommodation cabin; i) retention of a farm office; j) PERMISSION for the development of 5 no. horticultural polytunnels (1464 sq.m, with a maximum height of 3.6 m); k) Permission for the development of 1 no horticultural shed (212 sq.m.) with a maximum height of 7m; l) Permission for the development of a welfare block (43.4 sq.m) including toilets and washroom and associated treatment unit and percolation area; m) all associated site development and site enabling works
To carry out the following development: For the redevelopment of a former retail storage building to provide a 2-storey office building. The proposed development will include: 1) The change of use of the building to office accommodation. 2) Demolition of the steel framed and clad building located at the rear (south) of the site. 3) Carry out alterations and additions to the existing building on Monastery Lane and construct a new 2 storey extension to the rear of same. 4) Demolish northern section of Digital Hub stone boundary wall and set back to provide off-road parking spaces. 5) Provide new pedestrian footpath from the Digital hub car park entrance to connect with the existing footpath located on Monastery Lane. 6) Connect to existing adjacent public services. 7) All ancillary site works. The development proposes works to the exterior of the structure that is located within Ennistimon's Architectural Conservation Area and these works would materially affect the characher of the area. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project, and the screening report accompanies the application. In accordance with Articles 81 and 120 of the Planning & Development Regulations 2001, as amended, Clare County Council has concluded front an EIA screening determination that no significant effects on the environment are likely as a result of the proposed development and that and Environmental Impact Assessment is not required
To convert the existing basement area to bedroom/plant room space, extend the building to provide additional storage at basement level, extending the kitchen area over it, with resultant altered/ new fenestration to the building & all other associated site and ancillary works
To change the use of the existing ground floor shop unit for use as a credit union along with ancillary site works for a period of five years. The development is located within an Architectural Conservation Area.
To construct a dwelling house and garage, with effluent treatment system, and new entrance from public road, with all associated site works
For the construction of a new external stepped access route from the rear of the site to the existing first and second floor dwelling units, associated internal alterations including the removal of the internal stairs between first and second floor, and all associated elevational changes and external works at No.'s 4,5 and 6
To demolish an existing farm building and to construct a dwelling house and garage, with effluent treatment system, new entrance from public road and all associated site works
To retain 2 No. Dormer windows (replacing original roof lights) to the existing second floor dwelling unit, and elevational alterations to the rear of the existing first floor dwelling unit at No's 4, 5 and 6
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To build a dwelling house, garage, install a waste water treatment system, create a new entrance onto the public road and all associated site and ancillary works
To construct a new dwelling house, garage, sewage treatment system and construct a new entrance onto public road and associated site works.
To build a new dwelling house and garage, install a waste treatment system, improve the entrance onto the public road and all associated site and ancillary works
To construct a dwelling house & garage with effluent treatment system, new entrance from public road and all associated site works.