Planning records
Showing 1-5 of 5 public recordsExtension to existing Hynestown House to provide for new kitchen, dining room, games room, bathroom, plant room at ground floor level and one additional bedroom at first floor level. Conversion and extension of farm building C to two-bedroom holiday home accommodation. Demolition of farm building D and replacement with a two-storey building with store, bathroom and utility room at ground floor level and two-bedroom holiday home at first floor level. Conversion of farm buildings E and F into two no. two-bedroom holiday homes. The installation of wastewater treatment plant, the carrying out of hard and soft landscaping and all ancillary site works.
Construction of two single storey data centres with associated office and service areas; and three gas powered generation plant buildings with an overall gross floor area of 24,624sq.m that will comprise of the following: Demolition of abandoned single storey dwelling, remaining agricultural shed and derelict former farm building; Construction of 2 single storey data centres (12,797sq.m), both with associated plant at roof level, with 24 standby diesel generators with associated flues (each 25m high) that will be attached to a single storey goods receiving area/store and a single storey office area (2,404sq.m) located to the west of the data centres as well as associated water tower and sprinkler tank and other services; Amendments to the internal access road and omission of access to loading bay permitted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948 that include the relocation of permitted, and new, internal security gates; and new internal access roads to serve the proposed development that will provide access to 39 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; The development will also include the phased development of 3 two storey gas powered generation plants (9,286sq.m) within three individual buildings and ancillary development to provide power to facilitate the development of the overall site to be located within the south-west part of the overall site. Gas plant 1 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high) will facilitate, once operational the decommissioning of the temporary Gas Powered Generation Plant within its open compound as granted under SDCC Planning Ref. SD19A/0042/ABP Ref. PL06S.305948. Gas plant 2 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high). and, Gas plant 3 (3,196sq.m) will contain 21 generator units (19+2) with associated flues (each 25m high). These plants will be built to provide power to each data centre, if and, when required. The gas plants will be required as back up power generation once the permitted power connection via the permitted substation is achieved; New attenuation pond to the north of the site; Green walls are proposed on the southern elevation of each power plant, as well as to the northern elevation of the generator compound of the data centres, and enclosing the water tower/pump room compound, and a new hedgerow is proposed linking east and west of the site; Proposed above ground gas installation compound to contain single storey kiosk (93sq.m) and boiler room (44sq.m). The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage. The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. The site will remain enclosed by landscaping to all boundaries. The development will be accessed off the R120 via the permitted access granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. An EPA-Industrial Emissions (IE) licence will be applied for to facilitate the operation of the gas powered generation plant. An Environment Impact Assessment Report (EIAR) has been submitted with this application. All on a site of 22.1hectares.
Construction of 1 warehouse with ancillary office and staff facilities and associated development. The warehouse will have a maximum height of 16 meters with a gross floor area of 22,966sq.m including a warehouse area (21,113sq.m), ancillary office areas (1,163sq.m) and staff facilities (690sq.m); the provision of a new vehicular access to the site from Jordanstown Road including 2 additional access gates from this new road to the existing Site E to the north; pedestrian access; 210 ancillary car parking spaces; bicycle parking; HGV yards; level access goods doors; dock levellers; access gates; hard and soft landscaping; lighting; boundary treatments; ESB substation; plant; extinguishment of the existing vehicular access (farm gate) in lieu of a proposed pedestrian access gate at the southern portion of the site from the R120; and all associated development works above and below ground; all on a site of 5.67 on lands that are bounded to the west by Blocks A - D Jordanstown Road, to the south and east by greenfield lands and to the north by greenfield lands and Block E. The site abuts the R120 Newcastle Village to Rathcoole Road to the south.
Construction of an outdoor all-weather horse arena and a building to contain stables to house horses and to contain farm machinery implements and fodder, also ancillary works (i.e concrete yards, gates and boundaries), also all for agricultural purposes only in new farmyard using existing farm & road entrances.
Retention permission for five detached, single storey agricultural buildings used for kennel boarding services and all related works. The buildings are located on the southeast of the property. Four of the buildings provide for dog accommodations with gross floor area of 88.1sq.m, 24.5sq.m, 263.7sq.m and 265.8sq.m. One building is used as a reception area and office for the kennel with sanitary facility and a gross floor area of 34.2sq.m. Planning permission for kennel services signage maximum size 700 x 1000mm proposed at the property vehicular access.