Planning records
Showing 1-4 of 4 public records1) Proposed demolition of single storey 30.4m2 storage shed to side of existing dwelling. 2) Permission sought for the removal of existing roof & raising of existing ridge line to provide 34.4m2 of habitable accommodation at first floor level, with dormer windows to the West/Front of existing dwelling. 3) Proposed 10m2 single storey ground floor extension to rear/east together with all ancillary site works necessary to complete this development
1) Construction of 59sqm single storey rear extension to existing dwelling along with internal alterations to the existing bungalow, increasing dwelling from a two bedroom to three bedroom house 2)Construction of new detached 18sqm Home Office in the rear garden with all associated site development works, drainage and landscaping to accommodate the Home Office,3) Construct a new vehicular entrance to accommodate off street parking. 4) In the existing shed structure reorganise and extend to accommodate a dog area and utility space 5) all associated site development and drainage works to facilitate the development; ancillary works for foul water to public drainage system & surface water disposal system into soakaway
Demolition of existing 30.4 sqm single storey shed / store to side of No. 5 Lower Grattan Park to facilitate vehicular access and parking to serve proosed dwelling, provision of 1 no 3 bed detached bungalow (112 sqm) located to the rear of No 5 Lower Grattan Park and fronting onto the public road R761, new vehicular entrance to serve existing dwelling, connection of proposed dwelling to all existing services together with all ancillary site works necessary to complete the development
Extension of the appropriate period of 15/301 (1. Demolition of existing 124.9m2 single storey bungalow, No. 5 Lower Grattan Park. 2. Provision of 2 no. 4 bed semi detached dormer dwellings, comprising 114m2 each 3. Provision of 2 no. new vehicular entrances to serve proposed dwellings. 4. Connection of proposed dwellings to all existing services together with all ancillary site works necessary to complete this development)