Planning records
Showing 1-9 of 9 public recordsRetention Planning Permission is sought for a three year temporary Retention Permission for a self contained Pizza Catering Truck located within Dunnes Stores outdoor seating and gardening area and the retention of two associated advertising signs and all associated works. The proposed operating hours for the catering truck are daily from 2:00 PM to 11:00 PM.
Planning permission for development consisting of the change of use of existing units from credit union with ancillary offices and retail use to use as a funeral home for the direction of funerals with ancillary spaces, the amalgamation of units 1 & 2, new shopfront with externally illuminated signage, associated elevational alterations and associated internal alterations to the units all at Units 1 & 2, The Magic Carpet Centre, Old Bray Road, Cornelscourt, Dublin 18, D18 TC94 & D18 K576
Amendments to SHD ABP 312132-21. Removal of the 10th and 11th floor levels of Building A, reducing the height from 12 storeys to 10 storeys and resulting in the ommission of 14 units. the total number of units in Building A reduces from 117-103 units. Removal of the 4th and 5th floor levels of Building C, reducing the height from 6 storeys to 4 storeys and resulting in the omission of 21 units. The total number of units in Building C reduces from 70 to 49 units. Removal of the 4th floor level of Building D, reducing the height from 5 storeys to 4 storeys and resulting in the omission of 11 units. The total number of units in Building D reduces from 83 to 72 units. Minor modification to fenestration detail and elevational treatments of all three blocks associated with the proposed reduction in height. The proposed amendments omit 46 Build to Rent (BTR) units (32 one bed and 14 two bed apartments), a reduction in the total number of residential units from 397 as permitted to 351 units now proposed. The amended BTR development will comprise 243 one bed apartments, 97 two bed apartments, 4 three bed apartment units and 7 three bed houses. No further amendments are proposed to any other aspect of the permitted development as part of this amendment application. The application can be viewed online at www.cornelscourtplanning3.ie.
The sub-division and change of use of an existing off licence unit (154 sq.m). The existing unit will be divided into a shop unit (52 sq.m) and a licensed restaurant/cafe unit (102 sq.m) with dine in and take away food options. To accomodate this change a new fire exist door along the buildings NW elevation will be installed, including all other associated site works/services.
Temporary retention permission for a period of two years
Permission for a strategic housing development consisting of: Construction of 419 no. Build to Rent (BTR) residential units comprising: 412 no. apartment units, consisting of 294 no. one-bed apartments, 111 no. two-bed apartments, and 7 no. three-bed apartment units, arranged in 5 no. Blocks (Buildings A to E) which range in height from 4 no. storeys to 12 no. storeys over a basement/podium level. 7 no. three-bed, two storey, terraced houses. The proposed residential development will be for long-term rental and will remain owned and operated by an institutional entity for a minimum period of not less than 15 years. Provision of internal communal residential amenities/facilities (totalling approximately 779sqm GFA) to include a concierge (Building A), a range of tenant amenity lounges (across ground and first floor levels Buildings A, B, D and E), a gym (lower ground level Building C) and a single storey multipurpose pavilion building (approximately 88sqm GFA) within the communal courtyard between Buildings A and B. Provision of a retail/café unit (approximately 264sqm GFA) at ground floor level of Block E. Provision of a childcare facility (approximately 258sqm GFA) at ground floor level of Block D with capacity for in the order of 50-60 no. children. Vehicular access to basement level will be via the existing vehicular access point from the Old Bray Road. A total of 237 no. car parking spaces (236 no. at basement level and 1 no. at ground level) together with 2 no. set down spaces and a loading bay, 819 no. bicycle parking spaces (664 no. at basement level and 155 no. at ground level), and 10 motorcycle spaces (all at basement level), are proposed. Provision of an on-site foul drainage pumping station, located in the eastern corner of the site, which is to be integrated within a 2,150m3 underground balancing storage tank, together with all associated works. Provision of a segregated pedestrian path along the N11, adjacent to the existing cycle lane, which facilitates pedestrian connection from the subject site to the N11/Old Bray Road junction. A cycle connection is also facilitated from the northern corner of the site to the existing cycle lane along the N11. In addition, the proposed development facilitates pedestrian and cycle links to Old Bray Road (Cornelscourt Village) to the south and a potential future pedestrian / cycle link to Willow Grove to the east. All enabling and site development works, landscaping, boundary treatments, lighting, services and connections, waste management, ESB substation, and all other ancillary works above and below ground on a site of approximately 2.15ha. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development. The application contains a statement setting out how the proposal will be consistent with the objectives of the Dun Laoghaire Rathdown County Development Plan 2016-2022 and the Draft Dun Laoghaire Rathdown County Development Plan 2022-28 (which may be adopted at time of determining the application). The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. The application, together with an EIAR and NIS, may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.cornelscourtplanning2.ie
The development will consist of
Permission for the demolition of the existing structures on site and the construction of 19 no. residential dwellings (total gross floor area c.2.235 sqm) consisting of: 1). 5 no. 2 bed two storey houses ranging between c.74 sqm and c.77 sqm. 2). 7 no. 3 bed three storey houses ranging between c.114 sqm and c.123 sqm. 3). 7 no. 4 bed three storey houses ranging between c.133 sqm and c.196 sqm. 4). 33 no. off-street car parking spaces. 5). 6 no. bicycle spaces. 6). Re-location of the existing surface water and foul sewer within the site. 7). New access road serving 14 no. units, 5 no. individual access points all off Clonkeen Road. 8). Open space, landscaping, boundary treatment and all associated site development works and site services.
Planning permission for a 'Build to Rent' strategic housing development consisting of the construction of a new residential development of 468 no. units in the form of 452 no. apartment units (41 no. studio apartment units, 257 no. 1 bed apartment units, 136 no. 2 bed apartment units; and 18 no. 3 bed apartment units) and 16 no. house units (10 no. 3 bed semi-detached house units and 6 no. 1 bed bungalow units). A café / restaurant of c. 140 sqm; office space of 149 sqm; concierge of c. 149 sqm and central residential tenant amenity space of c. 458 sqm is also proposed. The following build - to - rent residential development is provided: 452 build to rent apartment units (ranging from 1 - 12 storeys in height) in the form of 8 no. new residential blocks (Blocks A - H) as follows: Block A (8 - 12 storeys) comprising 134 no. apartments (12 no. studio units, 93 no. 1 bed units and 29 no. 2 bed units); Block B (2 - 9 storeys) comprising 103 no. apartments (18 no. studio units, 65 no. 1 bed units; 14 no. 2 bed units and 6 no. 3 bed units); Block C (6 - 7 storeys) comprising 82 no. apartments (6 no. studio units, 60 no. 1 bed units and 16 no. 2 bed units); Block D (5 storeys) comprising 36 no. apartments (1 no. studio unit, 5 no. 1 bed units; and 30 no. 2 bed units); Block E (4 storeys) comprising 29 no. apartments (4 no. 1 bed units; and 25 no. 2 bed units); Block F (2 - 4 storeys) comprising 56 no. apartments (4 no. studio units, 24 no. 1 bed units; and 16 no. 2 bed units and 12 no. 3 bed units); Block G (3 storeys) comprising 6 no. apartments (3 no. 1 bed units and 3 no. 2 bed units); and Block H (3 storeys) comprising 6 no. apartments (3 no. 1 bed units and 3 no. 2 bed units). 10 no. 3 bed semi-detached houses (2 storey) and 6 no. 1 bed bungalows (1 storey) are proposed. Adjacent to the existing pedestrian and vehicular access point from Old Bray Road there will be a café/restaurant of 140 sqm and residential amenity area at ground and first floor providing resident support services and concierge services of 149 sqm. At first floor level is a proposed commercial office space of c. 149 sqm. Located centrally within the development attached to the southern gable of Block B there is a two storey residential amenity space of c. 458 sqm; providing for resident support facilities and amenities including reading room, lounge, gym and terrace. Each residential unit will be afforded with private open space in the form of a balcony/terrace/roof terrace or private rear garden area. Public open space is also proposed in the form of external residential amenity spaces, play areas, courtyards and gardens. 274 car parking spaces (273 at basement level and 1 at ground level), 616 bicycle parking spaces (512 at basement level and 104 at ground level) and 12 motorcycle spaces (12 at basement level) are proposed. Basement areas of c. 9,024 sqm are proposed (Level -1) and include car parking, waste management areas and plant areas. 3 no. ESB substations and 3 no. Switch Rooms (c. 77 sqm combined) are proposed at ground level. The development shall be served via the existing vehicular access point from the Old Bray Road. Upgrade works are proposed to this vehicular access point to facilitate the proposed development and to provide for improved access and egress for the overall development. Provision is made for new pedestrian connections to Willow Grove; the N11; and Cornelscourt Village. Provision is also made for a new cyclist connection to the N11. A drop- off zone is also proposed at the entrance to the site. The associated site and infrastructural works include provision for water services; foul and surface water drainage and connections; attenuation proposals; permeable paving; all landscaping works; boundary treatment; internal roads and footpaths; and electrical services. The application contains a statement setting out how the proposal will be consistent with the Dún Laoghaire Rathdown County Development Plan 2016-2022. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The application, together with the Environmental Impact Assessment Report, may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dún Laoghaire Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.cornelscourtplanning.ie