to
to

Planning records

Showing 1-5 of 5 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    2560212Granted

    Raheen, Rosbercon New Ross, Co. Kilkenny

    Sought for the demolition and removal of an existing shed and 2No. silos, and the construction of a new warehouse storage building, together with all associated site development works allDecision record indexed
    Decision13 October 2025View record
  2. © OpenStreetMap
    2360418Granted

    Raheen, New Ross, Co. Kilkenny

    For proposed erection of alterations and extensions to existing convenience store/petrol forecourt (minor alterations to planning permission previously granted under Planning Register Number 21/610 consisting of (a) additional ground floor area (b) proposed new first floor extension (c) change of site boundary (d) together with all associated & auxiliary accommodation and site works)Decision record indexed
    Decision08 March 2024View record
  3. © OpenStreetMap
    23145Granted

    Raheen, Rosbercon, Co. Kilkenny

    Development from townland of Marshmeadows, New Ross, Co. Wexford to townland of Raheen, Rosbercon, Co. Kilkenny. The project passes under the River Barrow across the county boundaries of Wexford and Kilkenny. The development consists of (1) Medium Voltage (MV) electricity system improvement by the installation of a new 20kV electricity underground cable (UGC) by means horizontal directional drilling (HDD) under the River Barrow to connect the Lake Region circuit at Marshmeadows, County Wexford to the Beechgrove circuit at Raheen, Rosbercon, County Kilkenny. From end to end the UGC measures approximately 580m. The majority of the circuit, approximately 365m will be installed by HDD under the River Barrow. The remainder of the circuit, approximately 215m will be a UGC installed by traditional trenching and ducting means. Approximately 355m of this UGC will be installed within County Wexford and the remaining 225m will be installed within County Kilkenny. (2) A second "spare" duct will be installed within the HDD to enable a second circuit to be installed at a future date to further enhance and future proof the network. (3) Permission is sought for all associated works including temporary works required. Planning permission is sought for a ten (10)year period. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the applicationDecision record indexed
    Decision07 November 2023View record
  4. © OpenStreetMap
    21610Granted

    Raheen, New Ross, Co. Kilkenny

    For the proposed erection of alterations and extensions to an existing convenience store and petrol forecourt consisting of (a) extension to the rear of existing building (b) connection to the proposed greenway (c) outdoor seated area together with associated and auxillary site worksDecision record indexed
    Decision29 March 2022View record
  5. © OpenStreetMap
    20201Refused

    Raheen, New Ross, Co Kilkenny

    For the development. The development will consist of the construction of a new 2.4m high security fence for a telecommunication compound on a grass verge adjacent the R723. The development will also include the installation of a new 9m long by 3m wide by 3m high telecommunications container and a backup diesel generator and fuel storage tank. Access to the development will be gained by constructing a new tarmac access road from the existing access road off the R723Grounds not yet categorised
    Decision13 July 2020View record
Showing 1-5 of 5
PreviousPage 1 of 1Next