to
to

Planning records

Showing 1-5 of 5 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    2561119Granted

    Lands at Railpark Maynooth Co. Kildare, Maynooth, ACP Ref: 312671-22 (Phase 1) and Reg. Ref.: 21156 / ACP Ref: 312685-22 (Phase 2) which is currently under construction. north of Maynooth Educate Together National School on the Celbridge Road (R405

    For a ten year planning permission for a Large-scale Residential Development (LRD) on lands at Railpark, Maynooth, Co. Kildare. The application site is bound by Parklands housing estate to the northwest and situated west of the residential properties within the Rockfield development and northeast of the permitted residential development ‘The Grange’ under Reg. Ref.: 21155 / ACP Ref: 312671-22 (Phase 1) and Reg. Ref.: 21156 / ACP Ref: 312685-22 (Phase 2), which is currently under construction, north of Maynooth Educate Together National School on the Celbridge Road (R405) and bordered by agricultural lands to the north, east, south and south east. The proposed development will consist of 581 no. residential units, a neighbourhood centre and all associated development, on a site of approximately 15.27 hectares. The residential component of the development consists of 185 no. apartment / duplex apartments and 396 no. houses to be provided as follows: • 59 no. 2 bed two storey mid terraced houses; • 52 no. 3 bed two storey mid terrace houses; • 223 no. 3 bed two storey end terrace/semi-detached houses; • 58 no. 4 bed two storey semi-detached houses; • 4 no. 4 bed two storey detached houses; • 185 no. duplex apartments / apartments (53 no. 1 beds, 92 no. 2 beds, 40 no. 3 beds) in a series of 3 to part 6 storey duplex apartment blocks / apartment blocks. The proposed neighbourhood centre consists of 3 no. buildings (Block A, Block B and a single storey standalone café / restaurant kiosk building) and a new public plaza and communal open space. Block A is part 5 storey / part 6 storey building comprising health centre (174 sq.m) and two no. shop units (124 sq.m pharmacy and 166 sq.m convenience shop) at ground floor level and 41 no. apartments (17 no. 1 beds and 24 no. 2 beds) from first to fifth floor level. Block B is a 5 storey building block comprising a childcare facility (762 sq.m) at ground floor level and 48 no. apartments (21 no. 1 beds and 27 no. 2 beds) from first to fourth floor level. 96 no. duplex apartments units (12 no. 1-bed, 48 no. 2-bed, and 36 no. 3-bed units) are provided in 5 no. blocks (Blocks 1 to 5) ranging from 3 no. storeys to 5 no. storeys. All duplex apartments and apartment units are provided with a balcony, terrace or private garden on all elevations. A total of 888 no. surface car parking spaces are proposed for residential units, visitor parking and the neighbourhood centre commercial uses. A total of 623 no. cycle spaces are pDecision record indexed
    Decision07 May 2026View record
  2. © OpenStreetMap
    2560231Granted

    The Grange (adjoining Rockfield Park), Railpark Celbridge Road, Maynooth

    For amendment of the design of the Crèche granted under planning permission 21/155, retaining the granted plan, but reducing the overall roof height. Revised by Significant Further Information which consists of the correction of the planning register number being applied to amend, now 21/156 in place of 21/155, and the revised design of the creche in response the request for further information from Kildare County CouncilDecision record indexed
    Decision22 August 2025View record
  3. © OpenStreetMap
    21156Granted

    Railpark, Celbridge Road, Maynooth

    Development on this 1.99 ha site, approximately, at lands adjoining an existing residential development (Rockfield Court), Railpark, Celbridge Road, Maynooth, Co. Kildare. (This forms Phase 2 of a residential masterplan for some 105 No. units in total on a wider c. 3.26 ha landholding under the Applicant’s control). The proposed Phase II development will consist of: Construction of a residential development comprising 47 No. dwellings in total, consisting of 11 No. two-bedroom two storey houses and 10 No. three-bedroom three storey houses (21 No. houses in total) including rear private open spaces; 13 No. one bedroom apartments and 13 No. two-bedroom apartments (26 No. three storey duplex apartments in total), including balconies and a single storey crèche facility (c.261 sqm). The development will also include: new vehicular, cyclist and pedestrian access from Celbridge Road via currently undeveloped lands to the southwest (Phase 1); a new pedestrian footpath and bicycle track along the site frontage to Celbridge Road; the provision of future access connection points to adjacent lands to the southwest (Phase 1), north and the southeast; works to facilitate connections to existing services infrastructure in Rockfield Park to the west. The development will also comprise internal roads, footpaths, cycle tracks, public open spaces, children’s play area and bicycle store areas; parking at surface level (95 No. total spaces for car parking and 33 No. bicycles spaces); drainage attenuation; all hard and soft landscaping; boundary treatments; removal of the existing hedgerows adjacent to Celbridge Road; changes in levels; and all ancillary site development works and site services provision (including wayleave to the north-east) above and below groundDecision record indexed
    Decision14 January 2022View record
  4. © OpenStreetMap
    21155Granted

    Railpark, Celbridge Road, Maynooth

    Development on this 2.18 ha site, approximately, at lands adjoining an existing residential development (Rockfield Park), Railpark, Celbridge Road, Maynooth, Co. Kildare. (This forms Phase 1 of a residential masterplan for some 105 no. units in total on a wider c. 3.26 ha landholding under the Applicant’s control). The proposed Phase 1 development will consist of: Construction of a residential development comprising 58 no. dwellings in total, consisting of 18 no. two-bedroom two storey houses, 14 no. three-bedroom three storey houses and 2 no. four-bedroom three storey houses (34 no. houses in total) including rear private open spaces; 12 no. one-bedroom apartments and 12 no. two-bedroom apartments (24 no. three storey duplex apartments in total), including balconies. The development will also include: new vehicular, cyclist and pedestrian access from Celbridge Road; a new pedestrian footpath and cycle track along the main site frontage to Celbridge Road; the provision of future access connection points to adjacent lands to the northeast (Phase 2), northwest and the southeast; works to facilitate connections to existing services infrastructure to the northeast via Phase 2 lands. The development will also comprise internal roads, footpaths, cycle tracks, public open spaces, and bicycle store areas; parking at surface level (117 no. total spaces for car parking and 30 no. bicycles spaces); drainage attenuation; all hard and soft landscaping; boundary treatments; removal of the existing hedgerows adjacent to Celbridge Road, changes in levels; and all ancillary site development works and site services provision (including wayleave to the north-east) above and below groundDecision record indexed
    Decision14 January 2022View record
  5. © OpenStreetMap
    21360Granted

    Maynooth, Co. Kildare.

    A new wastewater pumping station with an underground emergency storage tank; inlet chamber, wet well chamber, valve and flow chambers; above ground welfare building, control kiosk, fixed lifting gantry, 1 No. odour control unit, security gate and fencing. All associated ancillary and enabling works including hardstanding, landscaping and site drainage. All the above is proposed on a site of approximately 0.1 hectares at lands to the north of Celbridge Road within the townland of RailparkDecision record indexed
    Decision13 August 2021View record
Showing 1-5 of 5
PreviousPage 1 of 1Next