  1. © OpenStreetMap
    2562206Granted

    CARRONTLIEVE CARROWMULLIN FIGARY, LISFANNAN LUDDAN & BALLYMACARRY LOWER, LIFFORD PO

    A TEN-YEAR PLANNING PERMISSION FOR DEVELOPMENT AT THE EXISTING BUNCRANA WASTEWATER TREATMENT PLANT (WWTP) LOCATED AT RAILWAY ROAD, BALLYMACARRY LOWER, CO. DONEGAL; THE EXISTING FAHAN WWTP LOCATED AT CARRONTLIEVE, FAHAN, CO. DONEGAL; AND ALONG THE R238 REGIONAL ROAD WITHIN THE TOWNLANDS OF CARRONTLIEVE, CARROWMULLIN, FIGARY, LISFANNAN, LUDDAN, AND BALLYMACARRY LOWER. THE PROPOSED DEVELOPMENT WILL CONSIST OF: (1) UPGRADE WORKS TO THE EXISTING BUNCRANA WWTP REQUIRING AN EXPANSION OF THE EXISTING SITE TO INCREASE ITS DESIGN POPULATION EQUIVALENT (PE) FROM 13,200PE TO 17,700PE COMPRISING (A) CONSTRUCTION OF A SECONDARY TREATMENT TANK, BLOWERS AND SOUND ATTENUATION BARRIER, PUMP SUMP AND VENT STACK, FLOW METER CHAMBER, VALVE CHAMBER, ADMINISTRATION BUILDING, FLOOD PROTECTION WALL, 2 NO. PICKET FENCE THICKENER TANKS, A SITE DRAINAGE PUMPING STATION, INTERNAL SITE ACCESS ROAD, INTERCONNECTING PIPEWORK AND MANHOLES AND 4 NO. PARKING SPACES, (B) INTERNAL UPGRADES TO THE INLET WORKS BUILDING, INTERNAL UPGRADES TO THE CONTROL AND SLUDGE DEWATERING BUILDING, INTERNAL UPGRADES TO THE OUTFALL PUMPING STATION, REPURPOSING OF THE PRIMARY SETTLEMENT TANKS AS FINAL EFFLUENT BALANCING TANKS, RECONFIGURATION OF THE FLOW DISTRIBUTION CHAMBER AND INTERNAL UPGRADES TO THE SLUDGE HOLDING TANK, (C) REPLACEMENT OF THE EXISTING SITE ACCESS GATE WITH A PALISADE SECURITY GATE, (D) INSTALLATION OF ROOF MOUNTED SOLAR PHOTOVOLTAIC (PV) PANELS ON SOUTH FACING ROOFS OF THE EXISTING INLET WORKS, CONTROL AND SLUDGE DEWATERING AND PROPOSED ADMINISTRATION BUILDINGS, (E) DECOMMISSIONING AND DEMOLITION OF THE EXISTING SITE DRAINAGE PUMPING STATION, GAS HOLDING TANK, PICKET FENCE THICKENER AND SLUDGE DIGESTION TANK AND (F) ALL HARD AND SOFT LANDSCAPING WORKS INCLUDING SCREEN PLANTING AND ALL ASSOCIATED ANCILLARY WORKS INCLUDING SITE WORKS AND TEMPORARY WORKING AREAS, (2) UPGRADE WORKS TO THE EXISTING FAHAN WWTP TO CONVERT IT INTO A WASTEWATER PUMPING STATION (WWPS) COMPRISING (A) CONSTRUCTION OF A STORMWATER HOLDING TANK, PUMP SUMP AND VENT STACK, VALVE CHAMBER, INLET FLUME, SURGE VESSEL, WET KIOSK, 2 NO. CONTROL KIOSKS, CHEMICAL SKID, BUNDED CHEMICAL STORAGE TANK, EMERGENCY SHOWER, WELFARE UNIT, FLOOD PROTECTION WALL WITH GATE, INTERCONNECTING PIPEWORK AND MANHOLES, (B) DECOMMISSIONING AND DEMOLITION OF THE SITE GATE AND WING WALLS, SEPTIC TANK AND PRELIMINARY EQUIPMENT, (C) MATERIAL ALTERATION OF THE EXISTING SITE ACCESS TO INCORPORATE A NEW AND REALIGNED SECURITY MESH SITE GATE AND WINGWALLS ANDecision record indexed
    Decision12 February 2026View record
  2. © OpenStreetMap
    2351192Granted

    STATION ROAD, LIFFORD, CO. DONEGAL

    (1) COMPLETION OF WORKS GRANTED UNDER PLANNING REF. NO. 07/40652, (2) CONNECTION TO PUBLIC SEWER, (3) ALTERATION OF THE PREVIOUSLY GRANTED ROOF DESIGN WHICH WILL ALLOW FOR AN ADDITIONAL APARTMENT BRINGING THE TOTAL NUMBER OF UNITS TO 17 AND (4) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
    Decision16 May 2024View record
  3. © OpenStreetMap
    2051635Granted

    STRANORLAR, LIFFORD PO, CO DONEGAL

    (1) UPGRAGING OF APPROXIMATELY 310M OF 100MM DIAMETER TO 150MM DIAMETER BELOW GROUND RISING MAIN FROM RAILWAY ROAD (L-3104-1) TO THE EXISTING ST. JOSEPH'S WASTEWATER PUMPING STATION (2) DEVELOPMENT OF APPROXIMATELY 420M OF 450MM DIAMETER BELOW GROUND OVERFLOW PIPELINE FROM THE EXISTING ST. JOSEPH'S WASTEWATER PUMPING STATION TO THE RIVER FINN, AND (3) ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATIONDecision record indexed
    Decision21 October 2021View record
  4. © OpenStreetMap
    2051105Granted

    LIFFORD, LIFFORD TOWN, CO DONEGAL

    UPGRADE WORKS AT LIFFORD WASTEWATER TREATMENT PLANT AS FOLLOWS: (1) NEW INLET WORKS (2) 2 NO. PRIMARY SETTLEMENT TANKS (3) STORMWATER HOLDING TANK AND STORMWATER RETURN PUMPING STATION (4) 4 NO. ROTATING BIOLOGICAL CONTRACTOR (RBC) UNITS (5) 2 NO. FINAL SETTLEMENT TANKS (6) CONSTRUCTION OF AN ADMINISTRATION BUILDING (7) ERECTION OF PICKET FENCE THICKENER (8) SLUDGE STORAGE TANK (9) CONSTRUCTION OF RETAINING WALL ALONG NORTHERN BOUNDARY OF THE SITE (10) ERECTIONOF NEW SECURITY FENCE (11) CONSTRUCTION OF SITE ROADS AND SITE LIGHTING (12) DEMOLITION OF THE EXISTING SEPTIC TANK AND ADMINISTRATION BUILDING (13) DECOMMISSIONING OF EXISTING INLET WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATIONDecision record indexed
    Decision01 October 2020View record