to
to

Planning records

Showing 1-8 of 8 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    25/6891Refused

    Ballintaggart, Shanbally, Ringaskiddy, Co. Cork.

    Permission for the construction of a dwellinghouse and associated site works.Grounds not yet categorised
    Decision23 February 2026View record
  2. © OpenStreetMap
    25/4465Granted

    Shanbally Ringaskiddy Co Cork

    Permission for the construction of an all weather playing pitch (size 60 x 30m) (total site area 8,650m2) which will include:-1,035m2 stone carpark, access road and drop off area, perimeter fence of 2.4m metal mesh fence topped by 3.6m of ballstop netting, footpath surrounding the pitch, a 20m long x 5m high concrete hurling wall, 4 number 12m high LED double floodlighting columns for astro pitch, 10 no. 6m high street lighting, advertising banners, all associated site works including civil, electrical, drainage works.Decision record indexed
    Decision01 September 2025View record
  3. © OpenStreetMap
    22/5854Granted

    Opposite Marian Terrace and to the rear and side of Merlyn House Shanbally Ringaskiddy Co Cork

    The demolition of existing derelict cottage and the construction of a residential development of 23 no. units comprising 1 no. 4-bed detached unit, 1 no. 5-bed detached unit, 4 no. 3-bed semi-detached units, 16 no. 4-bed semi-detached units, 1 no. 4-bed storey and a half detached unit, 46 no. car parking spaces, 1 no. new dedicated vehicular entrance, 1 no. new dedicated pedestrian entrance, and all other road, drainage and associated site development works.Decision record indexed
    Decision08 August 2023View record
  4. © OpenStreetMap
    21/6687Granted

    Shanbally Ringaskiddy Co. Cork

    Permission for 1 no. Dormer Bungalow.Decision record indexed
    Decision19 January 2022View record
  5. © OpenStreetMap
    21/6106Granted

    Shanbally Ringaskiddy Co. Cork

    Decommission existing septic tank system and install a new treatment plant and soil polishing filter in its place to serve existing dwellinghouse (as currently being extended under Planning Ref. 20/4005).Decision record indexed
    Decision20 September 2021View record
  6. © OpenStreetMap
    20/6070Granted

    Raheens, Barnahely Shanbally Ringaskiddy Co. Cork

    An amendment to existing practices to use solvents and solid materials generated by manufacturing processes at other EPA licenced industrial facilities in Ireland as a supplementary fuel and feedstock in the existing waste treatment and recovery infrastructure at the site. The proposed development does not involve fundamental change from the present day on-site operations and will provide a beneficial alternative to the use of fossil fuel on the site. There will be no construction works associated with the proposed development. There will be no intensification of past use, no new emission points and no exceedance of the capacity thresholds and limits set in the existing Industrial Emissions licence. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0006-03. As the development refers to a modification to an establishment to which the Major Accident Directive applies information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision10 June 2021View record
  7. © OpenStreetMap
    21/5078Granted

    2 Coolmore Close Shanbally Ringaskiddy Co. Cork

    A single storey extension to the rear and to the side of the existing dwelling, and all associated site work.Decision record indexed
    Decision02 June 2021View record
  8. © OpenStreetMap
    20/4005Granted

    Shanbally Ringaskiddy Co. Cork

    Alterations and extensions to an existing dwelling, decommissioning of an existing septic tank, a new connection to the mains foul sewer on the public road and all other associated site works. Permission is further sought for retention of an existing temporary habitable structure (mobile home) on the site which is to be used by the applicant during the course of the proposed works and is to be removed on completion of same.Decision record indexed
    Decision11 February 2020View record
Showing 1-8 of 8
PreviousPage 1 of 1Next