Planning records
Showing 1-2 of 2 public recordsAlteration to previously granted planning permission (Reg. SD19A/0407, SD21A/0200 & SD22A/0092) for development at Site C (2.7ha site).
Modifications to a permitted warehouse development (as granted under SD19A/0407, as amended by SD21A/0200); The amendments principally comprise an overall increase in the commercial floor area of the warehouse by 2,334sq.m from the permitted 27,683sq.m to 30,017sq.m; The modifications proposed include: an increase in plant/machinery areas from 1,363sq.m to 3,933sq.m (principally through the provision of an additional mezzanine level within the warehouse area to accommodate plant/machinery); a reduction in the permitted mezzanine level 2 from 9,703sq.m to 9,349sq.m (principally through the provision of opes in the mezzanine floor to accommodate machinery associated with an advanced picking system); an increase in warehouse floor area from 14,225sq.m to 14,282 sq.m; an increase in staff facilities from 1,616sq.m to 1,659sq.m; and an increase in ancillary office area from 776sq.m to 794sq.m; The development will also include: the provision of security hut (14.7sq.m) close to the southern site boundary; the relocation of the building's main entrance stair core at the western elevation; elevational changes including the repositioning of 2 level entry doors and 1 dock leveller and the associated canopy, repositioning of fire escape doors, removal of 2 M&E rooms; internal modifications including the insertion of a warehouse toilet block at ground floor level, repositioning of stair cores; the provision of a pedestrian gate adjacent to the bin store; reduction in bin area from previously approved 45sq.m to 38sq.m; provision of compactor in place of 1 van parking space along the south-east boundary resulting in the reduction of van parking spaces from 12 to 11 in a modified arrangement; relocation of van egress gate further south; modifications to the position of the van loading entry doors and associated canopy; modifications to hard and soft landscaping and boundary treatments including the provision of a paladin fence separating the car parking area and the HGV circulation area and removal of 2 green walls; and all associated site works above and below ground.