Planning records
Showing 1-2 of 2 public recordsPROTECTED STRUCTURE: Permission for development at a site located between Herbert Place and Herbert Lane, Dublin 2. The site comprises a car park, adjacent to No. 4 Herbert Place (protected structure, RPS Ref.: 3705), which was formerly associated with No. 73 Baggot Street Lower (protected structure, RPS Ref.: 384). The proposed development will consist of: (i) The construction of a 4 storey residential building (including lower ground floor) abutting No. 4 Herbert Place (protected structure) fronting onto Herbert Place. The proposed building will contain the following: • 4 no. two bedroom apartment units with private amenity space in the form of balcony/terrace to the front of the building; • 2 no. three bedroom townhouses with private amenity space in the form of a front and rear gardens. (ii) The construction of a 2 storey mews building to the rear of the site accessed from Herbert Lane. The mews building will contain the following: A car port a ground floor level providing 2 no. car parking space (1 no. each for the proposed town houses); • 1 no. 2 bedroom apartment at first floor level with associated terrace/ balcony. (iii) The provision of 2 no. external platform lifts to the front of the building providing access to street level; (iv) All associated and incidental site development and infrastructural works including site clearance, incidental works/removal of existing boundary wall/ railings, new boundary treatments, plants, landscaping, tree removal, bin stores, and bicycle parking.
Development at a site located at car park adjacent No. 4 Herbert Place and Herbert Lane, Dublin 2. The proposed development consists of the following: (i) Provision of office development 1,657 sq.m of up to 5 storeys in height (including lower ground floor) with terrace at set back top floor. (ii) Provision of two no. 2-bedroom apartments over 2-storeys accessed from Herbert Lane including private and communal open space in the form of courtyards, terrace and balcony. (iii) All associated and incidental site development and infrastructural works including site clearance, plant, substation and PV panels, landscaping and bicycle parking.