Planning records
Showing 1-4 of 4 public recordsThe development will consist of the following: (a) The construction of a two-storey side extension with pitched roof to accommodate a new open living area on ground floor and new bedroom spaces on first floor level. (b) The construction of a single storey porch with canopy roof over to the front of the dwelling. (c) The relocation and widening of the existing vehicular entrance to facilitate off street parking. (d) The development is to include for internal & external alterations, drainage and all associated site works.
Construction of a 2-storey detached dwelling house, vehicular entrance from Public Road, connection to public services and ancillary site development works, at Little Meadow, Dun Laoghaire
We, Renrew T/A Cara Allcare Pharmacy intend to apply for Retention Permission for development at this site Unit 1, Bakers Point, Pottery Road, Dun Laoghaire, Co. Dublin, A96 A6P2. The development consists of the retention change of use from light industrial to pharmacy shop providing additional floor area (37m²) to ground floor pharmacy area and retention change of use from light industrial to doctor’s surgery providing additional floor area (37m²) to ground floor doctor’s surgery area, advertisement signage to south east elevation (10.2m²) in accordance with the lodged plans and documents to include all associated/ancillary works.
Permission for the extension of the existing Lidl, increasing the gross floor space of the premises by approx. 731 sqm from approx. 1,754sqm to approx. 2,485 sqm and the net retail sales area by 362 sqm from 1,286sqm to 1,648sqm. The development comprises: 1) the partial demolition (99sqm) of elements of the existing single story building and removal of the existing roof. 2) the construction of a part single part two storey extension of approx. 830 sqm (including a deposit return scheme facility) primarily to the north west and north east facade's and new part single part two storey monopitch roof to existing and new build areas. 3) Associated redevelopment/ reconfiguration of existing site layout and car parking and 4) Provision of building mounted signage, free standing covered trolly bay, hard and soft landscaping, public lighting, electric vehicle charging points, roof mounted solar panels, refrigeration and air conditioning plant and equipment, electricity substation building, external bin store, cycle parking (including free standing cycle parking shelter) and cargo cycle parking, boundary treatments, modification and extension of existing drainage, utility and services infrastructure, revised pedestrian access including ramp from Pottery Road and all other associated and ancillary development and works above and below ground level.