to
to

Planning records

Showing 1-4 of 4 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    23/4455Granted

    Slievereagh and Coomnaclohy Ballyvourney Co.Cork

    Alterations to the dimensions of the 7 no. wind turbines permitted as part of the Knocknamork Renewable Energy development (planning reference 19/4972). The proposed development includes the provision of 7 no. wind turbines with an overall ground to blade tip height of 175m (an increase of 25m, from 150m), a rotor blade length of 75m and a hub height of 100m, and all associated site development and ancillary works, an operational period and planning permission duration to align with the existing permission (planning reference no. 19/4972 ) is sought. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this applicationDecision record indexed
    Decision08 May 2023View record
  2. © OpenStreetMap
    22/5023Granted

    Slievereagh Ballyvourney Macroom Co.Cork

    Construct a dormer dwelling house, domestic garage, treatment unit and polishing filter unit and all site development worksDecision record indexed
    Decision02 August 2022View record
  3. © OpenStreetMap
    22/4634Granted

    Slievereagh Ballyvourney Co.Cork

    Demolish part of the existing dwelling, complete alterations to the elevations of the existing dwelling and construction of new extensions to the northeast and southeast of the existing dwelling together with the construction of a new detached garage, new potable well, an effluent treatment system, modifications to the existing vehicular entrance and all associated site worksDecision record indexed
    Decision07 July 2022View record
  4. © OpenStreetMap
    19/5869Granted

    Iar Choláiste Íosagáin, atá anois folamh ag An Sliabh Riabhach / Slievereagh Baile Bhuirne Maigh Chromtha, Co. Chorcaí

    An chéad phas de fhorbait céimnithe, ina mbeidh, (i) athrú úsáide go húsáid oifige do chuid den fhoirgneamh atá ann cheana (ii) athrú úsáide go húsáid halla taispeántais do chuid den mbunurlár (iii) páirteanna den tógáil aon stór ag cúl an fhoirgnimh agus seomraí coire 3 stór agus na botháin stórais coimhdeacha a leagadh (iv) struchtúr do ardaitheoir trí stór agus staighrí a thógáil ag cúl phríomh fhoirgneamh atá ann cheana (v) athchóiriú agus athruithe a dhéanamh ar an chuid lárnach den fhoirgneamh atá ann cheana (vi) athruithe a dhéanamh ar fhallaí teorainn, iotráil suímhe agus geataí atá ann cheana, láithreacha nua páirceála, oibreacha draenála, tírdhreachtú, comharthaíocht agus oibreacha suímhe gaolmhara. /The first phase of a phased development consisting of (i) Change of use of existing building to office use, (ii) Change of use of part of ground floor to use as exhibition hall, (iii) Demolition of part of a single storey construction to the rear of the building, 3-storey boiler rooms and ancillary storage sheds, (iv) Construction of a 3-storey elevator structure and stairs to the rear of the main existing building, (v) Renovation and changes to the central part of the existing building, (vi) Changes to the existing boundary walls, site entrance and gates, new parking spaces, drainage works, landscaping, signage and associated site works. At the former Colaiste Íosagáin, empty now, Slievereagh, Ballyvourney, Macroom, Co.CorkDecision record indexed
    Decision25 August 2020View record
Showing 1-4 of 4
PreviousPage 1 of 1Next