Planning records
Showing 1-12 of 12 public recordsThe construction of an extension consisting of new Reception / Visitors Centre, internal alterations, amendments to entrance hard landscaping & car-parking, signage to building, alterations to existing elevations and all associated site works
Of a specialist grout rig testing structure comprising a steel frame surface-bolted to a concrete foundation slab, with rendered block work to the lower section, profiled metal cladding to the upper elevations, an openable single-skin roof, roller shutter and personnel access doors, external signage, and all associated site development works
For development which will consist of permission for 1.) a new 2 storey office building with ancillary laboratories, canteen, gymnasium, meeting rooms and reception of 2250.5 sqm, 2.) a new single storey, double height truck maintenance shed of 587.4 sqm 3.) associated parking spaces including 101 no. car parking spaces, 3 no. van parking spaces and 30 no. secure bicycle parking spaces, 4.) solar photovoltaic panels at roof level to office building, 5.) alterations to the use of and modifications to the previously permitted entrance (Planning Reference No. P18/1010), 6.) internal road layout, landscaping, external lighting and boundary treatment, 7.) new surface water attenuation area, 8.) New foul water drainage pipework and pump station to service the new office building and maintenance shed connecting to the existing site infrastructure and discharging to the public network via the existing site connection 9.) new concrete dry storage area of 2194 sqm with associated surface water attenuation, 10.) new pedestrian entrance gate and sheltered waiting area, 11.) building signage and all ancillary site works above and below ground. The proposed development site is controlled by an Industrial Emissions Licence (Register No. P0076-01) authorised by the Environmental Protection Agency
For development which will consist of the construction of an extension to main building and associated site works
For development which will consist of proposed roof-mounted photovoltaic, PV, panels on the existing profiled metal roof and alI associated siteworks
Of the erecting of 1,764.23 m2 or 370.83 kWp of photovoltaic panels on the existing two roofs of our buildings located east and south of our factory land, with all associates site works
For development, the development will consist of proposed roof mounted Photovoltaic PV panels on an existing profile metal roof and all associated site works
For construction of an extension to side and rear of existing factory unit to be used as raw materials and finished product storage and PERMISSION to upgrade the facade of the existing building and install new signage including ancillary site works
For the construction of a light industrial building consisting of open plan warehouse, offices, toilet facilities & canteen. Also For permission for external yard areas, loading docks, car parking, proposed boundary fencing and connection to public services & to utilise entrance and car park areas previously approved under planning application P19-965 including ancillary site works
For the construction of a Light Industrial Building consisting of Open Plan Warehouse, Offices, Toilet Facilities and Canteen and PERMISSION for external yard areas, loading docks, car parking, proposed boundary fencing and connection to public services and to utilise entrance and car park areas previously approved under Planning Application P19-965 including ancillary site works
For development, the development will consist of the demolition of existing storage, logistics and loading building (266m2) and construction of new storage, logistics and loading building (1,774m2) ancillary to existing industrial building and connection to public utilities together with ancillary site development works
To RETAIN the development. The development consists of the constructed stand alone storage building and PERMISSION for development. The development consists of the construction of an extension to the main building for storage and associated site works