Planning records
Showing 1-2 of 2 public recordsThe development will consist of the replacement of an existing grass training pitch with a synthetic grass 3G all-weather pitch (maximum size 74m x 34.5m), Installation of perimeter weld-mesh fencing of varying heights (1.2m to 3.0m), installation of ball-stop netting and posts behind goals, flood lighting columns and all associated hard and soft landscaping and ancillary works, including new steps and a pedestrian entrance to St. Mary's National School.
The following works replacement of existing grass football pitch with a synthetic grass 3G all- weather pitch to a maximum size of 139m x 87m., reprofiling the ground level in order to achieve a more level playing surface encompassing the increase. in levels in parts of the pitch by up to 1 metre. Install perimeter weld mesh fence of varying heights 1.2m-3.0m, relocated ball-stop netting and posts behind goals. All related hard and soft landscape works including extended spectators' area, goal storage area and soft landscaping and all ancillary works.