    23/654Granted

    Acres, Aghalinane, Ballyhalwick,Balteenbrack, Behagh, Caher, Carhoon West, Castlelands, Derrycoo Gortnamucklagh, Gurteen, Gurteenroe, Kilnacranagh Lissacroneen, Mallowgaton, Mishells, Murragh, Roug

    The existing Bandon to Dunmanway 110 kV Overhead Line (OHL), which is approximately 26km long between the existing Bandon 110kV Substation in the townland of Mishells, Co. Cork (approximately 1km north of Bandon, Co. Cork) and the existing Dunmanway 110kV Substation in the townland of Ballyhalwick, Co. Cork (approximately 0.4km east of Dunmanway Co. Cork). The existing OHL is located in the townlands of Acres, Aghalinane, Ballyhalwick, Balteenbrack, Behagh, Caher, Carhoon West, Castlelands, Derrycool, Dromidiclogh, Dromidiclogh West, Gortnamucklagh, Gurteen, Gurteenroe, Kilnacranagh East, Kilnacranagh West, Laragh, Lissacroneen, Mallowgaton, Mishells, Murragh, Roughgrove East, Roughgrove West, Sranaviddoge, Teadies Upper, Toom and Tullyglass, Co. Cork. An uprate (refurbishment) of the existing Bandon to Dunmanway 110kv OHL, which consists of the: (i) replacement ("restringing") of the existing OHL conductor wires with a new higher capacity conductor including installation of a new fibre optic communication connection; (ii) replacement of 12 no. of the 13 no. existing steel towers including 11 no. angle masts (AM) and 1 no. end mast (EM) and their foundations with similar structures and member replacement and new bolts at 1 no. EM. Any replacement AMs will be constructed at, or immediately adjacent to the existing structures that they will replace, with a height difference of between 0.5-1.5m; (iii) Replacement of 16 no. of the 127 no. existing intermediate Polesets (IMPs); with similar structures. Any replacement IMPs will be constructed in situ, with the exception of IMP128 which will be replaced at an offset of 10m. The height differences of the replacements will be 1m, with the exception of IMP113 and IMP115 which will be a 2m and 3m increase in height respectively, (iv) Carrying out of civil works for tower foundation strengthening at 1 no. location; (v) Replacement of hardware and fittings at all locations, including insulators, clamps, anti-climb guards, vibration dampers, and installation of new jumper arrangements, suspension weights, plump poles, pole bolts and anti-climb guards; (vi) replacement of a crossarm at 1 no. location; (vii) all associated works within the existing Dunmanway Substation to accommodate the uprated 110 kV OHL and all associated site development works including above and below the ground works to gain access to the existing structures including timber cutting and vegetation clearance, painting, renumbering of replacement stDecision record indexed
    Decision10 May 2024View record
  2. © OpenStreetMap
    211478Granted

    Toomes Carnalogue Tullycahan Monvallet, Co Louth

    Ten year permission sought for alterations and extension to the solar PV and battery energy storage system development permitted under planning ref. no. 21/631 on a site comprising two distinct parcels of land either side of L5141 with a total area of c.41.60ha comprising: 1. Omission of permitted solar panels over an area of c.1.19ha to facilitate the provision of an extension to the permitted battery storage development involving a further 54 battery storage units (each with associated containerised step-up transformer) and an associated external screen bund. 2. Increase in the area to be developed with solar panels and associated works by c.32.93ha to the east and northeast of the permitted panels. 3. The primary access to the site will be via the new entrance permitted under the granted solar farm and battery storage development (planning application ref. 21/631 refers) on the L5141. A further access will be provided at the southern end of the proposed solar farm extension on the north side of the L5141 for ongoing maintenance access purposes during operation solely to facilitate temporary construction traffic between the two land parcels, an existing field entrance on the south side of the L5141 will be upgraded and a new temporary entrance directly opposite on the L5141 will be constructed that will be decommissioned upon completion of the construction works. 4. 11 no. additional single storey electrical inverter/transformer units, additional security fencing, extension to permitted CCTV system with pole mounted cameras and landscaping. 5. The provision of two areas of agricultural land enhancement and management for increased biodiversity over c.7.48ha and 6. All associated ancillary development works. The operational lifespan of the solar PV and battery energy storage system development will be 35 years. A Natura Impact Statement will accompany this applicationDecision record indexed
    Decision26 May 2022View record