22390Granted
TOWNLANDS OF TRASCAN AND CLONDOOLUSK, CO. OFFALY
DEVELOPMENT OF A SOLAR FARM CONSISTING OF SOLAR PV PANELS MOUNTED ON STEEL SUPPORTED STRUCTURES WITH ASSOCIATED CABLING AND DUCTING; THE LAYING OF AN UNDERGROUND CABLE IN THE PUBLIC ROADWAY FOR THE PURPOSE OF GRID CONNECTION VIA AN OFF-SITE SUBSTATION; 18 NO. SINGLE STOREY INVERTER STATIONS; 2 NO. STEEL STORAGE CONTAINERS; PALISADE PERIMETER FENCING 2.45M IN HEIGHT; DOUBLE PALISADE SECURITY GATES; PERMEABLE GRAVEL ACCESS TRACK; 20 NO. ON-SITE POLE MOUNTED CCTV CAMERAS C. 3M IN HEIGHT; 1 NO. TEMPORARY CONSTRUCTION COMPOUND/MATERIAL STORAGE AREA; AND 1 NO.TEMPORARY CONSTRUCTION STAGE MOBY DICK TYPE WHEEL WASH SYSTEM (WITH OVERGROUND SETTLEMENT TANK); AND ALL ASSOCIATED ANCILLARY DEVELOPMENT SERVICES AND WORKS, ALL TO BE PROVIDED WITHIN A TOTAL OVERALL APPLICATION BOUNDARY OF 39.23 HA. PERMISSION IS SOUGHT FOR THE PROPOSED SOLAR FARM FOR A PERIOD OF 10 YEARS WITH AN OPERATIONAL PERIOD OF 40 YEARS. AN APPLICATION TO OBTAIN PERMISSION FOR THE DEVELOPMENT OF ASSOCIATED TRANSMISSION INFRASTRUCTURE WHICH CONSISTS OF A 110 KILOVOLT (KV) SUBSTATION AND GRID CONNECTION TO FACILITATE THE EXPORT OF POWER FROM THE SOLAR FARM WILL BE SUBMITTED TO AN BORD PLEANALA. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED FOR THIS DEVELOPMENT AND SUBMITTED AS PART OF THE PLANNING APPLICATIONDecision record indexedDecision18 October 2023View record