to
to

Planning records

Showing 1-2 of 2 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    22390Granted

    TOWNLANDS OF TRASCAN AND CLONDOOLUSK, CO. OFFALY

    DEVELOPMENT OF A SOLAR FARM CONSISTING OF SOLAR PV PANELS MOUNTED ON STEEL SUPPORTED STRUCTURES WITH ASSOCIATED CABLING AND DUCTING; THE LAYING OF AN UNDERGROUND CABLE IN THE PUBLIC ROADWAY FOR THE PURPOSE OF GRID CONNECTION VIA AN OFF-SITE SUBSTATION; 18 NO. SINGLE STOREY INVERTER STATIONS; 2 NO. STEEL STORAGE CONTAINERS; PALISADE PERIMETER FENCING 2.45M IN HEIGHT; DOUBLE PALISADE SECURITY GATES; PERMEABLE GRAVEL ACCESS TRACK; 20 NO. ON-SITE POLE MOUNTED CCTV CAMERAS C. 3M IN HEIGHT; 1 NO. TEMPORARY CONSTRUCTION COMPOUND/MATERIAL STORAGE AREA; AND 1 NO.TEMPORARY CONSTRUCTION STAGE MOBY DICK TYPE WHEEL WASH SYSTEM (WITH OVERGROUND SETTLEMENT TANK); AND ALL ASSOCIATED ANCILLARY DEVELOPMENT SERVICES AND WORKS, ALL TO BE PROVIDED WITHIN A TOTAL OVERALL APPLICATION BOUNDARY OF 39.23 HA. PERMISSION IS SOUGHT FOR THE PROPOSED SOLAR FARM FOR A PERIOD OF 10 YEARS WITH AN OPERATIONAL PERIOD OF 40 YEARS. AN APPLICATION TO OBTAIN PERMISSION FOR THE DEVELOPMENT OF ASSOCIATED TRANSMISSION INFRASTRUCTURE WHICH CONSISTS OF A 110 KILOVOLT (KV) SUBSTATION AND GRID CONNECTION TO FACILITATE THE EXPORT OF POWER FROM THE SOLAR FARM WILL BE SUBMITTED TO AN BORD PLEANALA. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED FOR THIS DEVELOPMENT AND SUBMITTED AS PART OF THE PLANNING APPLICATIONDecision record indexed
    Decision18 October 2023View record
  2. © OpenStreetMap
    21123Granted

    TRASCAN AND CLONDOOLUSK, CO. OFFALY

    THE DEVELOPMENT OF A SOLAR FARM ON A TOTAL SITE AREA OF 86.7 HECTARES (HA), CONSISTING OF PHOTOVOLTAIC PANELS ON GROUND MOUNTED STEEL FRAMES WITH ASSOCIATED CABLING AND DUCTING; 40 NO. SINGLE STOREY INVERTER STATIONS; 4 NO. STEEL STORAGE CONTAINERS; PERIMETER FENCING; SECURITY GATES; PERMEABLE GRAVEL ACCESS TRACK; 36 NO. ONSITE POLE MOUNTED CCTV CAMERAS C. 3M IN HEIGHT; 2 NO. TEMPORARY CONSTRUCTION COMPOUND/MATERIAL STORAGE AREA; 2 NO. TEMPORARY CONSTRUCTION STAGE MOBY DICK TYPE WHEELWASH SYSTEMS (WITH OVERHEAD SETTLEMENT TANK); AND ALL ASSOCIATED ANCILLARY DEVELOPMENT SERVICES AND WORKS. PERMISSION IS SOUGHT FOR THE PROPOSED SOLAR FARM FOR A PERIOD OF 10 YEARS WITH AN OPERATIONAL PERIOD OF 40 YEARS. A NATURA IMPACT STATEMENT (NIS) IS SUBMITTED WITH THE PLANNING APPLICATION. AN APPLICATION TO OBTAIN PERMISSION FOR THE DEVELOPMENT OF ASSOCIATED TRANSMISSION INFRASTRUCTURE WHICH CONSISTS OF A 110 KILOVOLT (KV) SUBSTATION AND GRID CONNECTION TO FACILITATE THE EXPORT OF POWER FROM THE SOLAR FARM WILL BE SUBMITTED TO AN BORD PLEANÁLADecision record indexed
    Decision05 May 2021View record
Showing 1-2 of 2
PreviousPage 1 of 1Next