Planning records
Showing 1-2 of 2 public recordsWe, the Brabazon Trust, intend to apply for Planning Permission for the erection and maintenance for a period of five years of a 1 12m² prefabricated building with connection to existing Dining Room to replace the existing marquee containing dining facilities erected in 2020 as a temporary health measure to combat the spread of the coronavirus; new building to provide dining facilities, lobbies, accessible C, associated access ramps and steps and all other associated external works, all at The Brabazon Nursing Home, Brabazon House, 2 Gilford Road, Dublin 4 D04 TN93
For: a) a single storey 90m2 Activity Room connected to existing Dining Room to provide a new activity room, accessible toilet, storage area and new pantry kitchen, pergola to walkway and a screened high level sprinkler tank room at roof level including all necessary alterations to the existing dining room; b) new two storey lift building and associated lobbies at ground and first floor including all necessary alterations to the existing two storey bedroom wings; c) 12m2 extension to the existing Day Room; d) new 87m2 staff changing facilities and ancillary storage area at first floor level over existing administrative offices including demolition of existing male changing area and adjacent cleaners store including all associated internal and external alterations; e) 4 no. new roof lights to the existing Dining Room; f) 28m2 infill extension to provide new access lobby and extension to existing kitchen and associated alterations to both the existing kitchen and alterations to the existing adjacent accommodation to provide a new sluice room, cleaning store, accessible toilet and shower room, accessible bathroom, wheelchair and hoist storage and access to the Day Room; g) all associated external alterations to the foul and surface water drainage; h) removal of the existing marquee containing dining facilities erected as a temporary health measure to combat the spread of the coronavirus.