to
to

Planning records

Showing 1-5 of 5 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    25/6004Granted

    The Hermitage, Ballynoe, Rushbrooke, Cobh, Co. Cork

    Permission for the construction of 10 no. three bedroomed, semi-detached dwellings and conversion of the existing 'Hermitage Building' into 3 no. two storey dwellings and associated site works. The existing vehicular entrance is to be used to facilitate access to the site. (Previous planning references 10/8841, 15/6408 and 19/4274), Extension of Duration to Permission granted under Planning ref. No. 20/4748.Decision record indexed
    Decision17 November 2025View record
  2. © OpenStreetMap
    24/6353Granted

    The Hermitage Ballynoe, Rushbrooke Cobh Co.Cork

    Permission for the construction of 3 number dwellings (change of plan and increase in density from 2 number dwellings permitted under 20/4748). This is an alteration to part of the development to previously approved planning permission reg no. 20/4748 and will also include associated alterations to previously approved footpaths and internal road network, boundary treatments, new wastewater and utility service connections and all associated siteworksDecision record indexed
    Decision29 May 2025View record
  3. © OpenStreetMap
    24/4825Granted

    The Hermitage Ballynoe Rushbrooke, Cobh Co.Cork

    Permission for the following works; a) alterations to previously approved planning permission register reference 20/4748, as also amended under planning permission register reference 22/4529, b) demolition of the existing 2-storey "Hermitage Building" structure and it's replacement with, c) the construction of a new 2 storey residential terrace block comprising of: 1 no. 2-bedroom end of terrace dwelling, 3 no. 2-bedroom mid-terrace dwellings and 2 no. end of terrace 1-bedroom apartments (1 at ground floor level and 1 at first floor level), d) proposed new public footpaths, e) new boundary treatments, f) new waste, water and utility service connections and all associated site worksDecision record indexed
    Decision17 December 2024View record
  4. © OpenStreetMap
    22/4529Granted

    The Hermitage Ballynoe Rushbrooke Cobh, Co.Cork

    The permission for change of use of existing hermitage building to 5 no. apartments, including the provision of access stairs and alterations to the façade of the existing building (change of plan to part of the development permitted under planning Reg No. 20/4748 and increase in density)Decision record indexed
    Decision13 July 2022View record
  5. © OpenStreetMap
    20/4748Granted

    The Hermitage Ballynoe Rushbrooke Cobh, Co. Cork

    Permission for the construction of 10 no. three bedroomed, semi-detached dwellings and conversion of the existing 'Hermitage Building' into 3 no. two storey dwellings and associated site works. The existing vehicular entrance is to be used to facilitate access to the site. (Previous planning references 10/8841, 15/6408 and 19/4274).Decision record indexed
    Decision18 September 2020View record
Showing 1-5 of 5
PreviousPage 1 of 1Next