Planning records
Showing 1-50 of 3,109 public recordsDevelop a walking track with lighting and all associated site works
Retain gym room and associated site works. Permission is sought to extend existing changing rooms, new lighting design layout and all associated site works
Change house plans from that previously granted under planning ref. no. 24/60361 consisting of a single storey extension to the side and rear of the existing dwelling, internal and external alterations and all associated site works at the above address
Construct Single storey extension to side and rear of existing dwelling house, internal and external alterations, new proprietary wastewater treatment system and soil polishing filter, new site entrance, changes to site boundaries and boundary treatments, hard and soft landscaping, including all associated site works
Construct an agricultural shed (231 sq m), a manure pit and a dipping tank and associated works
Install a modular substation and ancillary site development works; to facilitate 4 no. shared electric vehicle charging units and 8 no. charging bays within a partially reconfigured parking area
Construct a light industrial unit with a footprint of 3000 m2 and overall floor area of 4549m2, plus associated roads, carpark, and service yard. The ground floor of the unit shall consist of 2319m2 of industrial space containing warehousing and clean room and an adjoining manufacturing area complete with an overhead gantry crane. A three-storey administration block with in-house training facilities, measuring a total floor area of 2231m2 over 3 floors, shall be located on the Eastern elevation of the development with a Glazed Entrance tower located on the Southeast Corner incorporating Corporate Signage. General External treatment shall be a mix of Microrib and trapezoidal insulated cladding and shall incorporate extensive fenestration on the eastern and southern Elevation. The roof shall support solar panels over its full area. The security of the site shall be provided by the building itself and a 2.5m high palladium fence as per figure 8, which shall surround the rear of the site and terminate at the southwest and northeast corners of the building. Landscaping shall be developed along the southern and eastern boundaries along a 1.5m high berm adjacent to the local authority footpath, with an extensive landscaped mindfulness and wellbeing area created at the south-eastern corner around the proposed surface.
Construct a detached building t incorporate light industrial and office facilities, site boundary fencing and gates, car and bicycle parking facilities, landscaping, building and site and incidental works
Construct a light industrial unit with a footprint of 2976 m2 plus associated roads, carpark, and service yard to the north and adjoining their existing facility. The proposed expansion shall house similar operations to the existing facility with the fabrication of modular service supplied systems. The Proposed Extension Shall match the existing in line and level. The General External treatment shall be a mix of Microrib and trapezoidal insulated cladding and shall incorporate extensive fenestration on the eastern and southern Elevation. The roof shall support solar panels over its full area. The application also seeks planning retention for an existing ancillary service yard and landscaped berms measuring 6540m2 located to the West and adjoining the original development.
Alter previously approved planning register number 22/495, granted on 29/09/2022. The alterations shall consist of the modification of the external treatments of the Southern and Western elevations through the installation of revised fenestration and the reduction in the level of the parapet from 120.750m to 117.750m. The Glazed Entrance at the South East corner shall be realigned and reduced in height in accordance with the general parapet level of the main building.
Retain signage and advertisement as constructed on site, along with retention of change of use to part of first floor to contained office pod hub space
(1.) Retain changes to the existing development previously granted permission under planning reference 20/271 including (A) An increase in the overall height of the building (B) An increase in the floor area of the building due to the construction of additional floor space at first floor level within the building and an increase in the overall building dimensions (C) The use of alternative wall finishes to the building (D) The alteration to external window and door sizes and locations, along with the provision of an additional window to the front elevation of the building (E) The relocation of the building on the site (F) The relocation of the site entrance (G) The alteration of external hardstand areas (2.) Permission for the construction of an external fire escape stairway, roof maintenance ladders and external fire escape doorway, and all alterations and associated site works
Carry out development which will consist of; (A) AN EXTENSION TO THE EXISTING LIGHT INDUSTRIAL BUILDING (B) TO CHANGE SITE BOUNDARIES FROM THAT PREVIOUSLY GRANTED UNDER PLANNING REFERENCE 20/271 (C) THE INSTALLATION OF APPROXIMATELY 400SQM OF SOLAR PHOTOVOLTAIC PANELS, AND ALL ALTERATIONS AND ASSOCIATED SITE WORKS
Construct a light industrial unit with a footprint of 2627 m2 and overall floor area of 3417m2, plus associated roads, carpark, and service yard and two individual entrances from the adjoining roadway. The ground floor of the unit shall consist of 2627m2 of industrial space containing manufacturing area with a two storey Glazed entrance area at the South East corner. The first floor contains an office area and welfare facilities, measuring a floor area of 790m2. General External treatment shall be completed in a variety of Microrib insulated cladding., with glazed panels along the Southern and Eastern Elevation. The roof shall be formed in insulated trapezoidal cladding and shall support extensive solar arrays across its area. Landscaping shall be developed along the Southern and Eastern areas with an extensive staff amenity and wellbeing area, including pitch and gym equipment formed adjacent to natural surface water attenuation ponds
A light industrial unit including offices and welfare facilities, with a footprint of 1208m2 and an overall floor area of 1417m2, plus associated entrances, car parking, bicycle shelter, a service yard, and signage. Permission is also sought for a 2.5m high palladium fence to the sides and rear with stone piers, wall, and fence to the front roadside and all associated site works.
Construct cubicle shed, calving shed, two under slat slurry tanks, concrete apron for feed area nd concrete yard for storage of silage bales. Retention permission is required for existing cubicle shed and under slat slurry tank
Develop as follows at the revise site at J17 National Enterprise Park, Togher, Portlaoise, Co. Laois, to that previously granted permission under Planning Ref: 21/221. The development will consist of the construction of a warehouse / light industrial manufacturing factory facility with offices and an overall floor area of 5,695 sq. m. and 13.1m high together with open plan yards, car parking areas, boundary fencing, gates, solar panels on rood, landscaping and all associated site works
Construct a warehouse / light industrial manufacturing factory facility with offices and an overall floor area of 5,695 sq. m. and 13.1m high together with open plan yards, car parking areas, boundary fencing, gates, solar panels on roof, landscaping and all associated site works
Retain changes to previously approved ref. no. 2240 including: a) relocation of substation, b) removal of security kiosk and to c) to retain additional floor space to Building A. Also Planning Permission is also sought for additional signage to building elevation and all associated site works
Alter previous granted planning application, Ref: 2240, a Manufacturing Campus within the Togher National Enterprise Park. The works will include extending Block A to the rear (west) by 25m and all associated works
Reduce /alter existing site boundary, de-commission existing waste water treatment system and connect to main sewer, as well as retention permission for sheds on site
Retain the erection of temporary cabins for use as offices, storage and welfare stations, a hardstanding storage yard, a wash down area, parking area, associated signage, temporary palisade fencing and all ancillary works, full planning permission is sought to operate the premises as a specialist plant hire business for a temporary period of 18 months
Erect a Main ID sign (or totem sign) measuring 13m high. It has a triangular plan with each of the three facades measuring 4m wide. The sign will contain logos and advertising. All associated site works.
The development to be retained consists of (i) 2no. high level ‘Maldron Hotel’ and ‘Midway’ signs affixed to the eastern elevation and (ii) 1no. high level ‘Midway’ sign affixed to the southern elevation. The proposed development will consist of the replacement of these existing signs with the erection of new signs and all other associated site development works. Sign 1A (13.93m x 1m) is a high-level sign to replace existing ‘Midway’ sign on the southern elevation. A new Sign 1B (4.8 x 1.1m) is also proposed on the southern elevation. Sign 2A (5.3m x 1.4m) is a high-level sign to replace existing ‘Maldron Hotel’ sign on the eastern elevation. Sign 2B (8.6m x 1.6m) is a high-level sign to replace existing ‘Midway’ sign on the eastern elevation. Sign 2C (2.2m x 2.2m) comprises of 4no. square panel signs below existing high-level signs on the eastern elevation of the hotel. All signage is to be internally illuminated by means of white LEDs.
Construct a 4,450 sqm plastics recycling building together with associated carparking, yard, footways, drainage, services, boundary treatment and ancillary works at lands at Knockmay, Portlaoise, Co. Laois. The development will be Phase 2 of a recycling facility; Planning Permission for Phase 1 of the facility was granted in 2021 [Planning Register Ref. No. 21/394]. The development is for the purposes of an activity that will require a Waste Licence. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application.
Alter internally to include the construction of a mezzanine floor area together with all associated works
Develop the following • Construction of a warehouse unit with associated office accommodation. • Overall combined floor area is c. 4,612 sq.m. See following breakdown: • warehouse unit is c. 3,745 sq.m • office space is c. 632 sq.m, with a plantroom of c. 94 sq.m. • external drivers’ toilet is 6 sq.m. • Sprinkler Tank & Pump House is 110 sq.m. • ESB substation is 25 sq.m. • The height of building is 14.5 meters to its parapet on all 4 sides. • 2 access are proposed from the east (existing), and west (new entrance). • Provision of no. 50 car parking spaces (comprising 3 no. accessible spaces, and 5 no. EV spaces), and 50 bicycle spaces to serve the proposed development. • All ancillary works including landscaping, boundary treatments, internal roadways, car parking, service yard and associated infrastructure both above and below ground level.
Construct 6,108 sqm plastic bottle and aluminium can recycling plant, associated process wastewater treatment plant, car parking, footways, drainage, services, boundary treatment, landscaping together with all ancillary works at lands at Knockmay, Portlaoise, Co. Laois. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application.
Permission for a granny flat extension to existing dwelling house, extension to the dwelling and all associated site works
Erect boundary fence, walls, entrance gates and all associated site works
Erect boundary fence, walls and entrance gate
Revise plans and elevations on foot of previously granted planning permission, reference number 21/578. The works include revised overall building height and the addition of one new window to the ground floor office store
Construct a warehouse and office facility, together with all ancillary site services
Construct new two storey dwelling house, domestic garage, package waste water treatment system and polishing filter, new entrance, ancillary site services and all associated site works
Complete hammerhead entrance to site, to erect boundary fence, walls, entrance gates and all associated site works.
Retain a revised site position to the dwelling house, two previous extensions to the rear of the house and removal of timber façade from the previously approved planning permission. Retention permission is also sought for a redesigned and repositioned detached garage
New site entrance and all associated site works
Additional mezzanine floor area and all associated site works.
Retain extensions and amendments to previously grant planning permissions 15/171 & 14/430.
Construct a Proposed Biogenerator Enclosure and associated equipment within an existing compound, works include modifications to existing walls, and all associated site works
To construct a single storey extension to the existing Administrative Building and all associated site works. This facility holds an industrial emissions licence issued by the Environmental Protection Agency
Construct an industrial unit and site entrance, together with all ancillary works
Construction of an extension to the existing Mill Intake & Screening Building, modifications to existing building and all associated site works
An extension for storage to our premises and all associated and necessary site works
The construction of an agricultural building, incorporating a slatted aminal area with underground slurry storage tank and feed facilities; loose animal housing and all associated ancillary facilities; works and services.
Build a warehouse industrial storage unit and all associated site works
Erect 3 no single storey prefabricated temporary units, comprising of 2 no. 98 sq. m classrooms and 1 no. 102 sq. m training room, external ramps & steps and associated site works
Construct one commercial vehicle test centre building and associated site works
1. Block A – Industrial Unit (area = 1798 sq.m) 2. New main site entrance with sliding gates, stone walls and piers, east vehicular site entrance with sliding gates and stone piers with pedestrian/ cyclist entrance points, 3. Existing site boundaries to be retained & augmented as necessary, new fenceline to create new boundary lines to the east and south of the site with additional landscape screening, 4. Car parking for staff & visitors, bicycle parking, access roads, landscaping, external lighting, building & site corporate signage, solar panels to roof areas on Block A 5. Foul and surface water drainage, water services and all associated infrastructure works and services on 1.49 Ha on lands
Relocate 102 no. car parking spaces, with provision for lighting, car chargers and associated fencing, underground cabling and associated site works. The proposed development will be accessed off the existing access from the N77. Planning permission is being sought for a period of 5 years.